Musk Construction
- Based in
- San Jose
- On San Francisco permits
- Sep 2018 to Apr 2023
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 10 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 13, 2020 | Completed final sign-off Jul 2020 | 10 Aquavista Wy | remodel (e) kitchen, remove (e) load bearing wall & replace with (n) beam, remodel 1 (e) bath, add (n) bath. no change to exteriorDetails
remodel (e) kitchen, remove (e) load bearing wall & replace with (n) beam, remodel 1 (e) bath, add (n) bath. no change to exterior | $30,000 |
| Oct 5, 2018 | Never finaled issued Oct 2018, no final | 1525 06th Av | create additional habitable space @ 1st floor. add bath & closet. remodel kitchen anb bath. add laundry closet, reconfigure 2nd floorDetails
create additional habitable space @ 1st floor. add bath & closet. remodel kitchen anb bath. add laundry closet, reconfigure 2nd floor | $126,000 |