Back to bathroom remodel contractors
Musk Construction
- Based in
- San Jose
- On San Francisco permits
- Sep 2018 to Apr 2023
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 6 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 26, 2023 | Completed final sign-off Sep 2023 | 189 Margaret Av | new bathroom addition in basement, running new electrical and new water supply for vanity,shower and toilet, install new fan. install new tiled shower pan, tiles, vanity, toilet, new lighting, switches, new framing, exsiting walls not moved, not doing seismic retrofit, not making accessible entranceDetails
new bathroom addition in basement, running new electrical and new water supply for vanity,shower and toilet, install new fan. install new tiled shower pan, tiles, vanity, toilet, new lighting, switches, new framing, exsiting walls not moved, not doing seismic retrofit, not making accessible entrance | $20,000 |
| Jan 29, 2021 | Completed final sign-off Mar 2021 | 724 Duboce Av | apt a. bathroom remdoel update water and power supply replace shower, vanity, toilet, new sink faucet, new shoer faucet, vanity light. no framing or structural work.Details
apt a. bathroom remdoel update water and power supply replace shower, vanity, toilet, new sink faucet, new shoer faucet, vanity light. no framing or structural work. | $12,500 |
| Jan 13, 2020 | Completed final sign-off Jul 2020 | 10 Aquavista Wy | remodel (e) kitchen, remove (e) load bearing wall & replace with (n) beam, remodel 1 (e) bath, add (n) bath. no change to exteriorDetails
remodel (e) kitchen, remove (e) load bearing wall & replace with (n) beam, remodel 1 (e) bath, add (n) bath. no change to exterior | $30,000 |
| Oct 5, 2018 | Never finaled issued Oct 2018, no final | 1525 06th Av | create additional habitable space @ 1st floor. add bath & closet. remodel kitchen anb bath. add laundry closet, reconfigure 2nd floorDetails
create additional habitable space @ 1st floor. add bath & closet. remodel kitchen anb bath. add laundry closet, reconfigure 2nd floor | $126,000 |