Murphymckenna Construction
- Based in
- Point Richmond
- On San Francisco permits
- Dec 2010 to Nov 2025
- Last 24 months
- 4 permits filed
21 permits since 2000: 9 completed, 7 in progress, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 3 completed, 2 in progress. Typically 13 days from filing to permit and 95 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 12, 2025 | In progress issued Apr 2025 | 2536 Baker St | replacement (e) penthouse and remodel (reconstruction of (e) stair, windows, door,) infill (e) deck corner and interior alterations. new windows and doors at rear. roofing as neededDetails
replacement (e) penthouse and remodel (reconstruction of (e) stair, windows, door,) infill (e) deck corner and interior alterations. new windows and doors at rear. roofing as needed | $928,000 |
| Sep 12, 2024 | In progress filed Sep 2024, not yet issued | 2444 Van Ness Av | new shared 498 sq ft roof deck accessed by existing stair penthouse.Details
new shared 498 sq ft roof deck accessed by existing stair penthouse. | $180,000 |
| Dec 4, 2018 | Completed final sign-off Feb 2019 | 33 Saturn St | revision to pa #2018059525. to connect with (e) first floor & 2nd floor of the same residential unit with new spiral stairway.Details
revision to pa #2018059525. to connect with (e) first floor & 2nd floor of the same residential unit with new spiral stairway. | |
| May 18, 2018 | Completed final sign-off Feb 2019 | 33 Saturn St | remodel e 1st fl living room and bath to create a new bedroom from living rm space to replace (3) e rear windows + 1 light well window to connect 1st and 2nd floors with a new spiral stairDetails
remodel e 1st fl living room and bath to create a new bedroom from living rm space to replace (3) e rear windows + 1 light well window to connect 1st and 2nd floors with a new spiral stair | $25,000 |
| Dec 20, 2010 | Completed final sign-off Nov 2011 | 70 El Sereno Ct | replace (e) non-confirming unit with master suite including bathroom, new windows. replace (e) staircase, remodel upstairs bathroom. voluntary strengthening.Details
replace (e) non-confirming unit with master suite including bathroom, new windows. replace (e) staircase, remodel upstairs bathroom. voluntary strengthening. | $70,000 |