Back to bathroom remodel contractors
Murphymckenna Construction
- Based in
- Point Richmond
- On San Francisco permits
- Dec 2010 to Nov 2025
- Last 24 months
- 4 permits filed
21 permits since 2000: 9 completed, 7 in progress, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 1 in progress, 1 never finaled. Typically 45 days from filing to permit and 300 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 8, 2021 | In progress issued Mar 2024 | 1650 Broadway | interior remodel of 7th fl. merger penthouse, remove deminishing wall between ph1 & ph2, remodel interior to create a functional & safe integral unit for live-in care by the owner occupants, provide 6 bedrooms, 3 baths and one half bath, merge private outdoor space for single unit useDetails
interior remodel of 7th fl. merger penthouse, remove deminishing wall between ph1 & ph2, remodel interior to create a functional & safe integral unit for live-in care by the owner occupants, provide 6 bedrooms, 3 baths and one half bath, merge private outdoor space for single unit use | $175,000 |
| Nov 13, 2018 | Completed final sign-off Jun 2019 | 3883 18th St | reconfigure closet, remodel half bath. n/a maherDetails
reconfigure closet, remodel half bath. n/a maher | $10,000 |
| May 18, 2018 | Completed final sign-off Feb 2019 | 33 Saturn St | remodel e 1st fl living room and bath to create a new bedroom from living rm space to replace (3) e rear windows + 1 light well window to connect 1st and 2nd floors with a new spiral stairDetails
remodel e 1st fl living room and bath to create a new bedroom from living rm space to replace (3) e rear windows + 1 light well window to connect 1st and 2nd floors with a new spiral stair | $25,000 |
| May 11, 2018 | Completed final sign-off Feb 2019 | 33 Saturn St | remodel (e) kitchen, 2 bathrooms and bedroom, exhaust fans. replace several (e) windows at lightwells and rear of building.Details
remodel (e) kitchen, 2 bathrooms and bedroom, exhaust fans. replace several (e) windows at lightwells and rear of building. | $50,000 |
| Mar 29, 2018 | Never finaled issued Mar 2018, no final | 2003 Broadway | revision to 201711083488 rear foundation replaced with new center grade beam. addition new joist in master bathroom to reinforce the (e) joistsDetails
revision to 201711083488 rear foundation replaced with new center grade beam. addition new joist in master bathroom to reinforce the (e) joists | $15,000 |
| Dec 8, 2017 | Completed final sign-off Dec 2020 | 101 Terrace Dr | the project scope is the remodel of an existing two story over basement building, including renovation of basement, kitchen, two bathrooms, roof deck and part of the roofDetails
the project scope is the remodel of an existing two story over basement building, including renovation of basement, kitchen, two bathrooms, roof deck and part of the roof | $273,000 |
| Nov 8, 2017 | Completed final sign-off Sep 2019 | 2003 Broadway | interior remodel of 805 sf new rear windows and door to side yard at ground level. remodel master bath and new door to rear yard at 2nd level. smaller deck/bridge to rear yardDetails
interior remodel of 805 sf new rear windows and door to side yard at ground level. remodel master bath and new door to rear yard at 2nd level. smaller deck/bridge to rear yard | $95,000 |
| Dec 20, 2010 | Completed final sign-off Nov 2011 | 70 El Sereno Ct | replace (e) non-confirming unit with master suite including bathroom, new windows. replace (e) staircase, remodel upstairs bathroom. voluntary strengthening.Details
replace (e) non-confirming unit with master suite including bathroom, new windows. replace (e) staircase, remodel upstairs bathroom. voluntary strengthening. | $70,000 |