Mullan Enterprises Inc
- Based in
- Daly City
- On San Francisco permits
- Apr 2011 to Jul 2026
- Last 24 months
- 8 permits filed
64 permits since 2000: 54 completed, 2 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 6 completed, 1 never finaled, 1 expired or cancelled. Typically 15 days from filing to permit and 269 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2025 | Completed final sign-off Apr 2026 | 39 West View Av | to abate nov 202536360- remove as built open metal cablerail guards at front entry stair and replace with partial height solid guard walls with stucco finish. replace (e) concrete pavers at front stairs with (n) brick paversDetails
to abate nov 202536360- remove as built open metal cablerail guards at front entry stair and replace with partial height solid guard walls with stucco finish. replace (e) concrete pavers at front stairs with (n) brick pavers | $3,500 |
| Dec 2, 2024 | Completed final sign-off Mar 2025 | 2126 31st Av | to comply with nov#: 202420771 - repair one step on front stairs, patch and repair roughly 20 sqft of stucco and framing. framing limited to replace 2 to 3 -2x6 studs in-kind replacement. submit plans if structural repair work exceed the scope of work.Details
to comply with nov#: 202420771 - repair one step on front stairs, patch and repair roughly 20 sqft of stucco and framing. framing limited to replace 2 to 3 -2x6 studs in-kind replacement. submit plans if structural repair work exceed the scope of work. | $4,000 |
| Feb 3, 2022 | Completed final sign-off Mar 2023 | 38 Ord Ct | repair of (e) concrete stairs at rear of property. (n) cable railing.Details
repair of (e) concrete stairs at rear of property. (n) cable railing. | $10,000 |
| Jan 31, 2022 | Completed final sign-off Jan 2023 | 640 Davis St | unit #4: remodel (e) kitchen, master & hall bathrooms & powder room. new openings between kitchen & living/dining rooms. renovate (e) stair guardrails. new rooftop condensing unit to add new cooling to (e) forced air heating system.Details
unit #4: remodel (e) kitchen, master & hall bathrooms & powder room. new openings between kitchen & living/dining rooms. renovate (e) stair guardrails. new rooftop condensing unit to add new cooling to (e) forced air heating system. | $77,500 |
| Dec 11, 2019 | Completed final sign-off Apr 2021 | 731 Capp St | project involves removing the existing, non-conforming rear addition, decks & stairs. a new rear stairs will be built within the footprint of the existing. non-conforming structure to be removed.Details
project involves removing the existing, non-conforming rear addition, decks & stairs. a new rear stairs will be built within the footprint of the existing. non-conforming structure to be removed. | $63,000 |
| Jul 18, 2018 | Completed final sign-off Dec 2019 | 935 Douglass St | at (e) 1st fl - convert storage space to new bedroom, renovate 2 (e) bedrooms, add 2 new bathrooms & new laundry closet. replace (e) 2nd fl bedroom w/new stair to 1st level. replace (e) furnace & water heater; add new gas fireplace.Details
at (e) 1st fl - convert storage space to new bedroom, renovate 2 (e) bedrooms, add 2 new bathrooms & new laundry closet. replace (e) 2nd fl bedroom w/new stair to 1st level. replace (e) furnace & water heater; add new gas fireplace. | $168,250 |
| Jun 30, 2017 | Expired or cancelled expired Mar 2026 | 3047 Fillmore St | remove load bearing wall on 1st floor. provide 20% ada accessibility upgrades including replacing toilet. provide grab bars and contrast striping front stairsDetails
remove load bearing wall on 1st floor. provide 20% ada accessibility upgrades including replacing toilet. provide grab bars and contrast striping front stairs | $20,000 |
| Feb 16, 2016 | Never finaled issued Feb 2016, no final | 476 Joost Av | replace tile in down stair shower and bedroom floor, tile upstairs bedroom floor, sheetrock garage. new shower pan.Details
replace tile in down stair shower and bedroom floor, tile upstairs bedroom floor, sheetrock garage. new shower pan. | $30,000 |