Back to bathroom remodel contractors
Mullan Enterprises Inc
- Based in
- Daly City
- On San Francisco permits
- Apr 2011 to Jul 2026
- Last 24 months
- 8 permits filed
64 permits since 2000: 54 completed, 2 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
24 bathroom remodel permits: 22 completed, 1 never finaled, 1 expired or cancelled. Typically 6 days from filing to permit and 183 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 18, 2024 | Completed final sign-off Apr 2026 | 66 28th St | gr flr horiz. addition w/ new bath & storage. new exterior fenestrations, new roofing and insulation in areas of work. infrastructure upgrades new plumbing, electrical and hvac systems throughout. (n) site upgrades; unit 66- kitchen and bath remodel, add 2nd bath, new rear balcony, 2-new skylights,Details
gr flr horiz. addition w/ new bath & storage. new exterior fenestrations, new roofing and insulation in areas of work. infrastructure upgrades new plumbing, electrical and hvac systems throughout. (n) site upgrades; unit 66- kitchen and bath remodel, add 2nd bath, new rear balcony, 2-new skylights, | $300,000 |
| Jul 19, 2024 | Completed final sign-off Mar 2025 | 448 Duncan St | voluntary legalization of unwarranted rear 1-story bedroom and bathroom and deck and of unwarranted home office bath at rear of (e) garage. at main level. renovation of (e) bath, replace kitchen appliances and windows at rear replace (e) whole house gas furnace and water heater. repainting exteriorDetails
voluntary legalization of unwarranted rear 1-story bedroom and bathroom and deck and of unwarranted home office bath at rear of (e) garage. at main level. renovation of (e) bath, replace kitchen appliances and windows at rear replace (e) whole house gas furnace and water heater. repainting exterior | $265,000 |
| Apr 25, 2024 | Completed final sign-off Aug 2024 | 1566 19th St | remodel (2) bathrooms in kind located on 1st floor and 2nd floor. add a non structural wall outside bathroom on 2nd floorDetails
remodel (2) bathrooms in kind located on 1st floor and 2nd floor. add a non structural wall outside bathroom on 2nd floor | $50,000 |
| Aug 2, 2023 | Completed final sign-off Jan 2024 | 690 28th St | bathroom remodel in-kind, add (4) new lights in (1) bedroomDetails
bathroom remodel in-kind, add (4) new lights in (1) bedroom | $25,000 |
| Jul 26, 2022 | Completed final sign-off Jan 2023 | 160 Corwin St | unit 4: 1 kitchen & 1 bathroom remodel. remove kitchen wall and install beam.Details
unit 4: 1 kitchen & 1 bathroom remodel. remove kitchen wall and install beam. | $50,000 |
| Jun 13, 2022 | Completed final sign-off Dec 2022 | 2060 Sutter St | kitchen remodel in kind. 2 bathroom remodels in kind, new kitchen cabinets and change one bathtub to a shower, change 2 vanities in bathrooms.Details
kitchen remodel in kind. 2 bathroom remodels in kind, new kitchen cabinets and change one bathtub to a shower, change 2 vanities in bathrooms. | $70,000 |
| Jan 31, 2022 | Completed final sign-off Jan 2023 | 640 Davis St | unit #4: remodel (e) kitchen, master & hall bathrooms & powder room. new openings between kitchen & living/dining rooms. renovate (e) stair guardrails. new rooftop condensing unit to add new cooling to (e) forced air heating system.Details
unit #4: remodel (e) kitchen, master & hall bathrooms & powder room. new openings between kitchen & living/dining rooms. renovate (e) stair guardrails. new rooftop condensing unit to add new cooling to (e) forced air heating system. | $77,500 |
| Apr 26, 2021 | Completed final sign-off Dec 2021 | 1222 17th Av | remodel (e) kitchen & replace (e) kitchen window. convert utility room & adjacent closet to (n) master bath & replace (e) window. relocate laundry to hall closet. (n) built-in wardrobes in bedroom. add (n) entry closet.Details
remodel (e) kitchen & replace (e) kitchen window. convert utility room & adjacent closet to (n) master bath & replace (e) window. relocate laundry to hall closet. (n) built-in wardrobes in bedroom. add (n) entry closet. | $120,000 |
| Nov 19, 2020 | Completed final sign-off Nov 2021 | 249 Dellbrook Av | add bedroom, bath @ lower flr. add exercise room lower flr. remodel kitchen @ main flr.Details
add bedroom, bath @ lower flr. add exercise room lower flr. remodel kitchen @ main flr. | $45,000 |
| Jul 23, 2020 | Completed final sign-off Dec 2020 | 415 Missouri St | bathroom and laundry remodel in kind. bathroom approx 7ft x 6 ft. replacing toilet, sink with new faucet and bathtub with shower fixture. the laundry closet approximately 3ft x 3ft, with new washer and dryer stack unit, no sink or faucet. all work in kind.Details
bathroom and laundry remodel in kind. bathroom approx 7ft x 6 ft. replacing toilet, sink with new faucet and bathtub with shower fixture. the laundry closet approximately 3ft x 3ft, with new washer and dryer stack unit, no sink or faucet. all work in kind. | $28,000 |
| Jul 21, 2020 | Completed final sign-off Mar 2021 | 879 Dolores St | renovate / enlarge (e) 1st flr dwell unit. convert storage to (n) bedrm, renovate (e) bath & add (n) laundry, relocate (e) kitch, add (n) rear french doors & (n) deck at grade, add (n) gas forced air furnace, relcoate (e) sump pumpDetails
renovate / enlarge (e) 1st flr dwell unit. convert storage to (n) bedrm, renovate (e) bath & add (n) laundry, relocate (e) kitch, add (n) rear french doors & (n) deck at grade, add (n) gas forced air furnace, relcoate (e) sump pump | $83,500 |
| Mar 9, 2020 | Expired or cancelled cancelled Jan 2024 | 107 Caselli Av | remodel bathroom in-kind, add new tub, tile, new plmg fixtures and new lighting and replace window in bathroom in-kind, u-factor 0.4.Details
remodel bathroom in-kind, add new tub, tile, new plmg fixtures and new lighting and replace window in bathroom in-kind, u-factor 0.4. | $20,000 |
| Dec 6, 2019 | Completed final sign-off Feb 2021 | 195 Urbano Dr | replace bathroom plumbing fixtures, shower, toilet, sink, lighting/controls, exhaust fan & electrical outlets. all items to be compliant w/title 24 & current codes, replace vanity & mirrorDetails
replace bathroom plumbing fixtures, shower, toilet, sink, lighting/controls, exhaust fan & electrical outlets. all items to be compliant w/title 24 & current codes, replace vanity & mirror | $15,000 |
| Jun 28, 2019 | Completed final sign-off Feb 2020 | 38 Ord Ct | 1/f: remodel master bathroom & tile floor in hallwayDetails
1/f: remodel master bathroom & tile floor in hallway | $18,000 |
| Apr 12, 2019 | Completed final sign-off Jan 2020 | 147 Clearfield Dr | add new media room and bath in garage; kitchen and bath remodelling.Details
add new media room and bath in garage; kitchen and bath remodelling. | $98,000 |
| Jul 18, 2018 | Completed final sign-off Dec 2019 | 935 Douglass St | at (e) 1st fl - convert storage space to new bedroom, renovate 2 (e) bedrooms, add 2 new bathrooms & new laundry closet. replace (e) 2nd fl bedroom w/new stair to 1st level. replace (e) furnace & water heater; add new gas fireplace.Details
at (e) 1st fl - convert storage space to new bedroom, renovate 2 (e) bedrooms, add 2 new bathrooms & new laundry closet. replace (e) 2nd fl bedroom w/new stair to 1st level. replace (e) furnace & water heater; add new gas fireplace. | $168,250 |
| Aug 14, 2017 | Completed final sign-off Sep 2018 | 628 Rhode Island St | kitchen & bath remodel on 2nd fl of 2 story residence. total sqft approx 1300 sqft.Details
kitchen & bath remodel on 2nd fl of 2 story residence. total sqft approx 1300 sqft. | $150,000 |
| Jun 28, 2017 | Completed final sign-off Sep 2017 | 1999 Pacific Av | 2/f: remodel (e) bathroom, new shower, tile, sheetrock, change lighting & plubmingDetails
2/f: remodel (e) bathroom, new shower, tile, sheetrock, change lighting & plubming | $20,000 |
| Oct 25, 2016 | Completed final sign-off Jan 2018 | 2339 25th Av | kitchen and bathroom renovation. removing 1 wall. adding a bathroom, adding a hallway. legalize full bath on grnd flr. infill lightwell (south property line).Details
kitchen and bathroom renovation. removing 1 wall. adding a bathroom, adding a hallway. legalize full bath on grnd flr. infill lightwell (south property line). | $75,000 |
| Sep 29, 2016 | Completed final sign-off Mar 2017 | 935 Douglass St | renovate (e) 2nd floor: remodel (e) bathroom, add 3 new skylights, remove non load bearing wall between kitchen & dining room, new sliding glass doors at rear wall and structural upgrades. convert existing den to new bedroomDetails
renovate (e) 2nd floor: remodel (e) bathroom, add 3 new skylights, remove non load bearing wall between kitchen & dining room, new sliding glass doors at rear wall and structural upgrades. convert existing den to new bedroom | $87,750 |
| Apr 22, 2016 | Completed final sign-off Jan 2017 | 2541 21st Av | on 2nd floor, add bathroom, powder room, add bedroom, family room, laundry room. new exterior door & exterior windows ground floor.Details
on 2nd floor, add bathroom, powder room, add bedroom, family room, laundry room. new exterior door & exterior windows ground floor. | $130,000 |
| Dec 9, 2015 | Completed final sign-off Mar 2016 | 360 Guerrero St | unit 206: replace bathtub, tile, vanity, counter top (bathroom). kitchen cabinets - removing non-structural wall. no structural work.Details
unit 206: replace bathtub, tile, vanity, counter top (bathroom). kitchen cabinets - removing non-structural wall. no structural work. | $30,000 |
| Apr 30, 2015 | Never finaled issued Jul 2015, no final | 472 Pacheco St | master bath remodel on 2nd flDetails
master bath remodel on 2nd fl | $35,000 |
| Apr 13, 2011 | Completed final sign-off Jun 2011 | 1362 17th Av | bathroom remodel; new shower, new tiles. kitchen remodel; new kitchen cabinets & lighting & tile work. remove non-bearing wall between kitchen & dining room.Details
bathroom remodel; new shower, new tiles. kitchen remodel; new kitchen cabinets & lighting & tile work. remove non-bearing wall between kitchen & dining room. | $21,000 |