53 permits since 2000: 43 completed, 6 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 in progress. Typically 374 days from filing to permit and 206 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 29, 2023 | In progress filed Dec 2023, not yet issued | 2299 19th Av | abe checklist per response. new path from 19th ave to extg building front entry. relocate doors to provide 4 feet o between int. stair and entry door. new entry door ada accessible threshhold and hardware. new power operated door as per da 04 and 05Details
abe checklist per response. new path from 19th ave to extg building front entry. relocate doors to provide 4 feet o between int. stair and entry door. new entry door ada accessible threshhold and hardware. new power operated door as per da 04 and 05 | $7,000 |
| Aug 24, 2022 | Completed final sign-off Oct 2025 | 557 Anderson St | conditioning of ground floor garage,new bath office,media & storage area.415 sq ft of new habitable space.single parking spot in garage to remain.new interior stair from level 1 to 2.Details
conditioning of ground floor garage,new bath office,media & storage area.415 sq ft of new habitable space.single parking spot in garage to remain.new interior stair from level 1 to 2. | $180,000 |
| Nov 13, 2017 | Completed final sign-off Dec 2017 | 1269 Filbert St | common area replace in-kind dry rotted threads, risers & handrail to rear access. stairs 50% max repair in-kind paint stairs & sidingDetails
common area replace in-kind dry rotted threads, risers & handrail to rear access. stairs 50% max repair in-kind paint stairs & siding | $5,600 |