Block 2330, lot 006A

2299 19th Ave

City’s use
Commercial Office
Built
1948
Stories
1
Units
1
Rooms
3 bathrooms
Building
4,949 sq ft
Lot
7,901 sq ft
Zoning
RH2
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

9 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Dec 29, 2023In progress
filed Dec 2023, not yet issued
2299 19th AvMuldoon Construction Incabe checklist per response. new path from 19th ave to extg building front entry. relocate doors to provide 4 feet o between int. stair and entry door. new entry door ada accessible threshhold and hardware. new power operated door as per da 04 and 05
Details
Permit
202312293294
Status
filed
Filed
Dec 29, 2023
Declared cost
$7,000
Address
2299 19th Av

abe checklist per response. new path from 19th ave to extg building front entry. relocate doors to provide 4 feet o between int. stair and entry door. new entry door ada accessible threshhold and hardware. new power operated door as per da 04 and 05

Open the permit page

$7,000
Dec 29, 2023In progress
filed Dec 2023, not yet issued
800 Santiago StMuldoon Construction Inc(#b) abe checklist response 202301045947. power assist door adjusted to be less than 8.5 pounds. threshold less or equal then 1/2". new door push plates
Details
Permit
202312293287
Status
filed
Filed
Dec 29, 2023
Declared cost
$2,000
Address
800 Santiago St

(#b) abe checklist response 202301045947. power assist door adjusted to be less than 8.5 pounds. threshold less or equal then 1/2". new door push plates

Open the permit page

$2,000
Dec 29, 2023In progress
filed Dec 2023, not yet issued
800 Santiago StMuldoon Construction Inc(#a) abe checklist response 202301055989. new threshold max 1/2". sidewalk to be repaired smooth and level per da .04 power door operator installed.
Details
Permit
202312293289
Status
filed
Filed
Dec 29, 2023
Declared cost
$5,000
Address
800 Santiago St

(#a) abe checklist response 202301055989. new threshold max 1/2". sidewalk to be repaired smooth and level per da .04 power door operator installed.

Open the permit page

$5,000
Oct 7, 2021Completed
final sign-off Dec 2021
800 Santiago StMuldoon Construction Increpair of sheet metal copping and stucco at rear of building.
Details
Permit
202110070023
Status
complete
Filed
Oct 7, 2021
Permit issued
Oct 7, 2021
Final sign-off
Dec 6, 2021
Declared cost
$900
Address
800 Santiago St

repair of sheet metal copping and stucco at rear of building.

Open the permit page

$900
Dec 13, 2019Never finaled
issued Dec 2019, no final
800 Santiago Stper pg&e and dbi record, add address to block 2330, lot 006a as; 800 santiago street a & b.
Details
Permit
M1175427
Status
issued
Filed
Dec 13, 2019
Permit issued
Dec 13, 2019
Address
800 Santiago St

per pg&e and dbi record, add address to block 2330, lot 006a as; 800 santiago street a & b.

Open the permit page

Oct 5, 2017Completed
final sign-off Oct 2017
2299 19th AvMuldoon Construction Incinkind replacement of 7 front 6'x6' posts on front facade due to dry rot
Details
Permit
201710050453
Status
complete
Filed
Oct 5, 2017
Permit issued
Oct 5, 2017
Final sign-off
Oct 31, 2017
Declared cost
$7,600
Address
2299 19th Av

inkind replacement of 7 front 6'x6' posts on front facade due to dry rot

Open the permit page

$7,600
Jan 15, 2015Completed
final sign-off Mar 2015
2299 19th AvD B I Contracting Inc#a - barrier removal, create accessible operatory room, upgrade entrance, install grab bars, provide signage. n/a maher ordinance
Details
Permit
201501155899
Status
complete
Filed
Jan 15, 2015
Permit issued
Feb 10, 2015
Final sign-off
Mar 26, 2015
Declared cost
$28,000
Address
2299 19th Av

#a - barrier removal, create accessible operatory room, upgrade entrance, install grab bars, provide signage. n/a maher ordinance

Open the permit page

$28,000
Mar 14, 2012Completed
final sign-off May 2012
2299 19th Avsuite#3- install (replace 4-dental chairs, widen office entrance door & remodel (e) restroom for ada compliance.
Details
Permit
201203146082
Status
complete
Filed
Mar 14, 2012
Permit issued
Mar 15, 2012
Final sign-off
May 29, 2012
Declared cost
$12,000
Address
2299 19th Av

suite#3- install (replace 4-dental chairs, widen office entrance door & remodel (e) restroom for ada compliance.

Open the permit page

$12,000
Mar 3, 2010Completed
final sign-off Mar 2010
2299 19th AvStandard Termite & Pest Controlrepair window frames & dry rot only, exterior stucco on south side. no moving or adding walls
Details
Permit
201003037470
Status
complete
Filed
Mar 3, 2010
Permit issued
Mar 3, 2010
Final sign-off
Mar 19, 2010
Declared cost
$1,500
Address
2299 19th Av

repair window frames & dry rot only, exterior stucco on south side. no moving or adding walls

Open the permit page

$1,500

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Muldoon Construction Inc (5), D B I Contracting Inc, Standard Termite & Pest Control
Engineers
Tim O'sullivan