Mueller Nicholls Inc
- Based in
- Oakland
- On San Francisco permits
- Apr 2002 to Aug 2026
- Last 24 months
- 9 permits filed
109 permits since 2000: 88 completed, 5 in progress, 3 never finaled, 13 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 9 completed, 2 expired or cancelled. Typically 56 days from filing to permit and 293 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2025 | Completed final sign-off Aug 2026 | 1409 20th St | existing kitchen and bathrooms to be renovated. provide cathedral ceiling at living room and kitchen space, within the existing building envelope. provide new windows and doors at rear elevation. existing deck and ext stair to be repaired, less than 50%.Details
existing kitchen and bathrooms to be renovated. provide cathedral ceiling at living room and kitchen space, within the existing building envelope. provide new windows and doors at rear elevation. existing deck and ext stair to be repaired, less than 50%. | $298,290 |
| Aug 23, 2024 | Expired or cancelled expired Jan 2026 | 250 Locust St | revision to pa# 202307283188. this revision captures the exterior steel stair previously noted in the scope of work as a deferred submittal along with minor structural & arch adjustments necessitated by (e) conditions @ job site discovered during construction admin. anything not clouded wasDetails
revision to pa# 202307283188. this revision captures the exterior steel stair previously noted in the scope of work as a deferred submittal along with minor structural & arch adjustments necessitated by (e) conditions @ job site discovered during construction admin. anything not clouded was | |
| Jul 19, 2024 | Completed final sign-off Mar 2025 | 2694 23rd Av | kitchen remodel @ 2nd floor. install (1) windows and (2) skylights @ 2nd floor. rebuild stairs at front in kind. update finishs at fireplace and install attic ladder.Details
kitchen remodel @ 2nd floor. install (1) windows and (2) skylights @ 2nd floor. rebuild stairs at front in kind. update finishs at fireplace and install attic ladder. | $50,000 |
| Jun 13, 2018 | Expired or cancelled cancelled Jan 2026 | 476 Noe St | revision to #201604124546 s1. rebuild the front stair treads in-kind in order to regulate therise and run and eliminate the (e) tripping hazard.Details
revision to #201604124546 s1. rebuild the front stair treads in-kind in order to regulate therise and run and eliminate the (e) tripping hazard. | |
| Aug 10, 2016 | Completed final sign-off May 2018 | 4 Pacheco St | lower level remodel and voluntary structrual strengthening. replace foundation. replace windows in kind. remodel bath. replace existing interior stair.lwr garage level to include 2 bedrooms, full bath, tv roomDetails
lower level remodel and voluntary structrual strengthening. replace foundation. replace windows in kind. remodel bath. replace existing interior stair.lwr garage level to include 2 bedrooms, full bath, tv room | $150,000 |
| Oct 10, 2013 | Completed final sign-off Jul 2015 | 130 Retiro Wy | full seisic upgrade on entire bldg. convert (e) roof to a roof deck w/ a guardrail surround. 2 new operable skylight & stair access. remove (e) falling masonry fireplace & replace with a new zero clearance gas fired fireplace. modity (e) vestibule & entry (include new front entry door) to allow forDetails
full seisic upgrade on entire bldg. convert (e) roof to a roof deck w/ a guardrail surround. 2 new operable skylight & stair access. remove (e) falling masonry fireplace & replace with a new zero clearance gas fired fireplace. modity (e) vestibule & entry (include new front entry door) to allow for | $125,000 |
| Sep 19, 2013 | Completed final sign-off May 2017 | 185 Belgrave Av | vertical & horizontal addition to a sfr. interior remodel to include relocation of stair on all three levels. new fenestrations @ south east. west elevations. new exterior decks & roof decks.Details
vertical & horizontal addition to a sfr. interior remodel to include relocation of stair on all three levels. new fenestrations @ south east. west elevations. new exterior decks & roof decks. | $450,000 |
| Aug 21, 2012 | Completed final sign-off Jun 2013 | 118 Whitney St | revision to appl #2012.0629.3845 & 2012.07.30.6058 - windows added along side stair, not visible from street.Details
revision to appl #2012.0629.3845 & 2012.07.30.6058 - windows added along side stair, not visible from street. | $10,000 |
| Jul 30, 2012 | Completed final sign-off Jun 2013 | 118 Whitney St | revision to app#201206293845. stairs and downstairs bathroom revised per plan.Details
revision to app#201206293845. stairs and downstairs bathroom revised per plan. | |
| Jun 29, 2012 | Completed final sign-off May 2013 | 118 Whitney St | comply with 201035171. interior renovation to (e) single family dwelling. includes new stairs to connect existing garage, basement, and main floor together. home office and 1/2 bath at basement. releveling a floor and steel beam moved due to settlement, remodeled kitchenDetails
comply with 201035171. interior renovation to (e) single family dwelling. includes new stairs to connect existing garage, basement, and main floor together. home office and 1/2 bath at basement. releveling a floor and steel beam moved due to settlement, remodeled kitchen | $224,000 |
| Sep 8, 2010 | Completed final sign-off Mar 2011 | 2120 Washington St | replace extg exterior stairs, relocate front gate, new pavement to front and rear yards. legalize basement bathroom.Details
replace extg exterior stairs, relocate front gate, new pavement to front and rear yards. legalize basement bathroom. | $28,000 |