Back to kitchen remodel contractors
Mueller Nicholls Inc
- Based in
- Oakland
- On San Francisco permits
- Apr 2002 to Aug 2026
- Last 24 months
- 9 permits filed
109 permits since 2000: 88 completed, 5 in progress, 3 never finaled, 13 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
33 kitchen remodel permits: 31 completed, 2 expired or cancelled. Typically 3 days from filing to permit and 207 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2025 | Completed final sign-off Aug 2026 | 1409 20th St | existing kitchen and bathrooms to be renovated. provide cathedral ceiling at living room and kitchen space, within the existing building envelope. provide new windows and doors at rear elevation. existing deck and ext stair to be repaired, less than 50%.Details
existing kitchen and bathrooms to be renovated. provide cathedral ceiling at living room and kitchen space, within the existing building envelope. provide new windows and doors at rear elevation. existing deck and ext stair to be repaired, less than 50%. | $298,290 |
| Jul 19, 2024 | Completed final sign-off Mar 2025 | 2694 23rd Av | kitchen remodel @ 2nd floor. install (1) windows and (2) skylights @ 2nd floor. rebuild stairs at front in kind. update finishs at fireplace and install attic ladder.Details
kitchen remodel @ 2nd floor. install (1) windows and (2) skylights @ 2nd floor. rebuild stairs at front in kind. update finishs at fireplace and install attic ladder. | $50,000 |
| May 13, 2024 | Completed final sign-off Apr 2025 | 2500 Steiner St | renovation to single apartment high rise res building. new powder room, existing baths to be remodeled, kitchen to be remodeled, laundry room to be remodled, new lighting througout, e windows to be refurbished for proper function. new windows and new door with transomo at north wall, not visibleDetails
renovation to single apartment high rise res building. new powder room, existing baths to be remodeled, kitchen to be remodeled, laundry room to be remodled, new lighting througout, e windows to be refurbished for proper function. new windows and new door with transomo at north wall, not visible | $300,000 |
| Jun 4, 2021 | Completed final sign-off Feb 2022 | 1734 Gough St | addition of home office & media room, remodel bathroom# 4. add kitchenette in 1st flr. 2nd flr: kitchen remodel. exterior: replace (2) windows in (e) opening(not visible from street).Details
addition of home office & media room, remodel bathroom# 4. add kitchenette in 1st flr. 2nd flr: kitchen remodel. exterior: replace (2) windows in (e) opening(not visible from street). | $250,000 |
| Feb 18, 2021 | Completed final sign-off Aug 2021 | 1790 Vallejo St | revision to pa# 202010176753; reconfigure master bath, master closet and laundry, (e) door to bed 105 to remain, lighting update to kitchen, fan added in master bed, minor adj to power closets and switchesDetails
revision to pa# 202010176753; reconfigure master bath, master closet and laundry, (e) door to bed 105 to remain, lighting update to kitchen, fan added in master bed, minor adj to power closets and switches | $160,000 |
| Oct 17, 2020 | Completed final sign-off Aug 2021 | 1790 Vallejo St | interior remodel - living room, dining room, kitchen, master bedroom, master closet, master bathroom, bedroom 2 & add bedroom 3Details
interior remodel - living room, dining room, kitchen, master bedroom, master closet, master bathroom, bedroom 2 & add bedroom 3 | $160,000 |
| Jan 23, 2017 | Completed final sign-off Mar 2018 | 2640 Divisadero St | interior remodel: add new stairwell from ground flr to 1st. add new mud room in ground flr. expand kitchen footprint & remodel powder room on 1st flr.Details
interior remodel: add new stairwell from ground flr to 1st. add new mud room in ground flr. expand kitchen footprint & remodel powder room on 1st flr. | $350,000 |
| Nov 10, 2014 | Completed final sign-off Sep 2019 | 1450 Masonic Av | 3 bathrooms and kitchen remodel in upper unit per plan. replace (1) window in master bath for aluminum window.Details
3 bathrooms and kitchen remodel in upper unit per plan. replace (1) window in master bath for aluminum window. | $105,000 |
| Sep 5, 2014 | Completed final sign-off May 2017 | 185 Belgrave Av | kitchen & bathroom remodel. no exterior work. no structural work under this permit. all other work under appln #201309197260.Details
kitchen & bathroom remodel. no exterior work. no structural work under this permit. all other work under appln #201309197260. | $25,000 |
| Jul 2, 2014 | Completed final sign-off Jul 2015 | 130 Retiro Wy | revision to pa201310109043 & 201402269495, to add a 42" high one hour rated parapet wall at roof deck west wall. to remove the (e) water heater & broiler & replace with a combination domestic and hydronic hot water heater. to construct an outdoor kitchen at the roof deck. maher n/aDetails
revision to pa201310109043 & 201402269495, to add a 42" high one hour rated parapet wall at roof deck west wall. to remove the (e) water heater & broiler & replace with a combination domestic and hydronic hot water heater. to construct an outdoor kitchen at the roof deck. maher n/a | $25,000 |
| Jun 6, 2014 | Completed final sign-off Jan 2015 | 3875 Clay St | infill the light court. addition of kitchen, remodel of kitchen, pantry, family room and den, misc. improvements per plan, structural work at first floor.Details
infill the light court. addition of kitchen, remodel of kitchen, pantry, family room and den, misc. improvements per plan, structural work at first floor. | $87,000 |
| Jul 25, 2013 | Completed final sign-off Mar 2014 | 130 Retiro Wy | to seelctively demolish surface of the walls & ceilings around the kitchen,dining rm,hall & garge in order to see the exisitng framing conditions,also to remove existing appliances,fixtures& coutners @ 2nd & 3rd flrs. area of work +/- 600 sq ft.Details
to seelctively demolish surface of the walls & ceilings around the kitchen,dining rm,hall & garge in order to see the exisitng framing conditions,also to remove existing appliances,fixtures& coutners @ 2nd & 3rd flrs. area of work +/- 600 sq ft. | $75,000 |
| Jul 19, 2013 | Completed final sign-off Jul 2015 | 130 Retiro Wy | to selectively demolish an extg kitchen, including non-bearing interior walls. to remodel an extg ktcn new appliances, cabinets, countertops & lighting. to add new bathroom at master bedroom. to convert 2 small bathrooms into 1 bathroom including relocating window.Details
to selectively demolish an extg kitchen, including non-bearing interior walls. to remodel an extg ktcn new appliances, cabinets, countertops & lighting. to add new bathroom at master bedroom. to convert 2 small bathrooms into 1 bathroom including relocating window. | $250,000 |
| Jun 24, 2013 | Completed final sign-off Feb 2014 | 1234 Lombard St | #3 - kitchen & bathroom remodel per plan, remove section of interior wall per structural plan, repair (e) bath window, no exterior changes, new cabinets, countertops, tile, fixtures, paint.Details
#3 - kitchen & bathroom remodel per plan, remove section of interior wall per structural plan, repair (e) bath window, no exterior changes, new cabinets, countertops, tile, fixtures, paint. | $58,000 |
| Feb 22, 2013 | Completed final sign-off Aug 2013 | 611 Washington St | interior remodel in kitchen at unit#2202. replace (e) cabinets, plumbing & lighting fixtures in kitchen & 2 bathrooms, replace (e) recessed halogen light fixtures w/ (n) recessed led fixtures. install (n) flooring.Details
interior remodel in kitchen at unit#2202. replace (e) cabinets, plumbing & lighting fixtures in kitchen & 2 bathrooms, replace (e) recessed halogen light fixtures w/ (n) recessed led fixtures. install (n) flooring. | $200,000 |
| Nov 20, 2012 | Completed final sign-off Aug 2013 | 2321 15th St | (front cottage) remodel of kitchen & bath. new half bath, replacement of most windows, finishing of basement space, re-build rear deck, same size & same location.Details
(front cottage) remodel of kitchen & bath. new half bath, replacement of most windows, finishing of basement space, re-build rear deck, same size & same location. | $130,000 |
| Nov 20, 2012 | Completed final sign-off Aug 2013 | 2321 15th St | back cottage:remodel of kitchen and bath, new half bath, replacement of all windows.Details
back cottage:remodel of kitchen and bath, new half bath, replacement of all windows. | $60,000 |
| Oct 4, 2012 | Completed final sign-off May 2013 | 157 Alpine Tr | project is an renovation of an existing two unit family residence. project includes replacement of kitchens (2), renovation of bathrooms and interior finishes.Details
project is an renovation of an existing two unit family residence. project includes replacement of kitchens (2), renovation of bathrooms and interior finishes. | $100,000 |
| Aug 22, 2012 | Completed final sign-off Feb 2013 | 154 Dolores St | remodel (e) master bath, add (n) guest bath, add new can lights in upstair bedrooms, add (3) new velux skylights, replace (e) skylight, refinish hardwood floors, remove & replace kitchen counters & cabients, add (4) undercabinet fluorescent lights.Details
remodel (e) master bath, add (n) guest bath, add new can lights in upstair bedrooms, add (3) new velux skylights, replace (e) skylight, refinish hardwood floors, remove & replace kitchen counters & cabients, add (4) undercabinet fluorescent lights. | $120,000 |
| Jun 29, 2012 | Completed final sign-off May 2013 | 118 Whitney St | comply with 201035171. interior renovation to (e) single family dwelling. includes new stairs to connect existing garage, basement, and main floor together. home office and 1/2 bath at basement. releveling a floor and steel beam moved due to settlement, remodeled kitchenDetails
comply with 201035171. interior renovation to (e) single family dwelling. includes new stairs to connect existing garage, basement, and main floor together. home office and 1/2 bath at basement. releveling a floor and steel beam moved due to settlement, remodeled kitchen | $224,000 |
| Jan 26, 2012 | Completed final sign-off Feb 2013 | 1930 California St | g/f, enclosed common area entry area w/ main door and sidelite. replace garage door w/ like kind. 1st fl: replace existing w/ guard rail. combine bedrms to one large rm.bi-fold door & swing door in new rm. rear deck w/ gas fire bowl. 2nd fl: replace w/ new guard rail. kitchen remodel & relocat skylDetails
g/f, enclosed common area entry area w/ main door and sidelite. replace garage door w/ like kind. 1st fl: replace existing w/ guard rail. combine bedrms to one large rm.bi-fold door & swing door in new rm. rear deck w/ gas fire bowl. 2nd fl: replace w/ new guard rail. kitchen remodel & relocat skyl | $150,000 |
| Dec 13, 2011 | Expired or cancelled expired Jul 2014 | 1769 Green St | interior remodel of (e) upper floor flat, remodel kitchen, bathroom, add 2nd bath. add new electrical, replace (e) rear windows with new sliding doors. no additional square footage.Details
interior remodel of (e) upper floor flat, remodel kitchen, bathroom, add 2nd bath. add new electrical, replace (e) rear windows with new sliding doors. no additional square footage. | $140,000 |
| Feb 17, 2011 | Completed final sign-off Jun 2011 | 1740 Franklin St | unit #5 kitchen & bath remodle with all new finishes: paint, hardwood, cabinets, fixtures, tile & appliances, no exterior changes, no engineering required.Details
unit #5 kitchen & bath remodle with all new finishes: paint, hardwood, cabinets, fixtures, tile & appliances, no exterior changes, no engineering required. | $52,200 |
| Dec 28, 2010 | Completed final sign-off Mar 2011 | 2518 17th Av | kitchen remodel:demo extg kitchen,install new framing as required.install new green house window,plmg,elec,mech per plans.new sheetrock,cabinets,countertops and painting per plans.Details
kitchen remodel:demo extg kitchen,install new framing as required.install new green house window,plmg,elec,mech per plans.new sheetrock,cabinets,countertops and painting per plans. | $45,000 |
| Dec 28, 2010 | Completed final sign-off May 2011 | 151 Beaumont Av | kitchen remodel:demo extg kitchen, framing as necessary,new plmg, electrical and mechanical per plans.new sheetrock and plaster, new cabinets, counters,lighting per plans.Details
kitchen remodel:demo extg kitchen, framing as necessary,new plmg, electrical and mechanical per plans.new sheetrock and plaster, new cabinets, counters,lighting per plans. | $42,000 |
| May 26, 2010 | Completed final sign-off Feb 2011 | 332 Surrey St | kitchen remodel w/ new appliances cabs, floors , counters , and bath remodel with new fixtures in unit at 2nd floor. remove and replace dining rm and lv rm windows, new wdws and dr in kitch and bath. opening sizes to change. no removal of struc. walls.Details
kitchen remodel w/ new appliances cabs, floors , counters , and bath remodel with new fixtures in unit at 2nd floor. remove and replace dining rm and lv rm windows, new wdws and dr in kitch and bath. opening sizes to change. no removal of struc. walls. | $33,000 |
| May 17, 2010 | Completed final sign-off Nov 2010 | 1740 Franklin St | unit#9-interior remodel with no exterior changes, removing no walls, no changes to access. new kitchen cabinets floor, paint, counters, appliances. remodel tow baths with (n) tile and fixtures & paint.Details
unit#9-interior remodel with no exterior changes, removing no walls, no changes to access. new kitchen cabinets floor, paint, counters, appliances. remodel tow baths with (n) tile and fixtures & paint. | $52,000 |
| Oct 29, 2008 | Completed final sign-off Mar 2009 | 177 Hancock St | demolish interior of (e) kitchen and renovate. replace (e) kitchen windows and rear door with new windows and doorDetails
demolish interior of (e) kitchen and renovate. replace (e) kitchen windows and rear door with new windows and door | $90,000 |
| Aug 15, 2008 | Completed final sign-off Dec 2008 | 1150 Lombard St | remodel kitchen, new cabinets, new range, ove, &warming drawer. new granite countertops & wood floors to match existing. master bath remodel including new bathtub & tile shower surround, new vanity cabinet & (2) sinks, (2) faucets. guest bath remodel - just new tile floor & tile shower surroundDetails
remodel kitchen, new cabinets, new range, ove, &warming drawer. new granite countertops & wood floors to match existing. master bath remodel including new bathtub & tile shower surround, new vanity cabinet & (2) sinks, (2) faucets. guest bath remodel - just new tile floor & tile shower surround | $90,000 |
| Feb 29, 2008 | Completed final sign-off Sep 2008 | 1870 Jackson St | unit #602: demolitish & relocate walls in (e) (2) bedrooms, 2 baths & closets. new plumbing fixtures, electrical changes,change size of (e) storage closet, minor elect changes in kitchen,new appliances and counters in (e) locations. (n) cabinets in laundry,dining rm,and living rm w/minor elec changeDetails
unit #602: demolitish & relocate walls in (e) (2) bedrooms, 2 baths & closets. new plumbing fixtures, electrical changes,change size of (e) storage closet, minor elect changes in kitchen,new appliances and counters in (e) locations. (n) cabinets in laundry,dining rm,and living rm w/minor elec change | $100,000 |
| Oct 9, 2007 | Expired or cancelled expired Nov 2010 | 1067 Lombard St | kitchen remodel-remove + replace kitchen cabinets + appliances, new sink + faucet, new lighting fixtures. no change in location for plumbing/gas/vent for hood. no changes to exterior or window.Details
kitchen remodel-remove + replace kitchen cabinets + appliances, new sink + faucet, new lighting fixtures. no change in location for plumbing/gas/vent for hood. no changes to exterior or window. | $30,000 |
| Sep 27, 2007 | Completed final sign-off Jan 2008 | 181 28th Av | kitchen remodel. move range, oven, refrigeration locations, electrical and pplumbing changes. remove chase. no removal of any wall or structural wall. ( e) windows to remain.Details
kitchen remodel. move range, oven, refrigeration locations, electrical and pplumbing changes. remove chase. no removal of any wall or structural wall. ( e) windows to remain. | $30,000 |
| Apr 2, 2002 | Completed final sign-off Oct 2002 | 1740 Franklin St | the existing kitchen is to be stripped to the studs, new sheetrock, cabinets & finish electrical. noDetails
the existing kitchen is to be stripped to the studs, new sheetrock, cabinets & finish electrical. no | $35,000 |