Msa Framing
- Based in
- San Rafael
- On San Francisco permits
- Aug 2025 to Sep 2026
- Last 24 months
- 8 permits filed
8 permits since 2000: 2 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 in progress. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 2, 2026 | In progress issued Jul 2026 | 3404 Clay St | general dryrot repairs@ rear stairs in kind, less than 50%, and at window/door openings as needed for inkind replacement 10 new windows replace (e) openings (4 front, 4 rear, 2 garage lv). 1 patio door (e) opening.Details
general dryrot repairs@ rear stairs in kind, less than 50%, and at window/door openings as needed for inkind replacement 10 new windows replace (e) openings (4 front, 4 rear, 2 garage lv). 1 patio door (e) opening. | $30,000 |