Back to bathroom remodel contractors
Msa Framing
- Based in
- San Rafael
- On San Francisco permits
- Aug 2025 to Sep 2026
- Last 24 months
- 8 permits filed
8 permits since 2000: 2 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 in progress. Typically 15 days from filing to permit and 285 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 20, 2025 | Completed final sign-off Aug 2026 | 3294 Clay St | unit #6: refinish floors, replace (e) windows retrofit street facing, plumbing, electrical, hvac, carpentry, exterior 2 deck including railings. 2 bathroom replace in-kind. hvac: 2 fans, electrical heater, exterior dormer.Details
unit #6: refinish floors, replace (e) windows retrofit street facing, plumbing, electrical, hvac, carpentry, exterior 2 deck including railings. 2 bathroom replace in-kind. hvac: 2 fans, electrical heater, exterior dormer. | $250,000 |
| Aug 13, 2025 | In progress issued Aug 2025 | 2440 Clay St | reconfigure 3 bathrooms, kitchen , 1 door ways, remove (e) north side kitchen wall, replace knob and tubeDetails
reconfigure 3 bathrooms, kitchen , 1 door ways, remove (e) north side kitchen wall, replace knob and tube | $150,000 |