Back to kitchen remodel contractors
Mr Unger
- Based in
- South San Francisco
- On San Francisco permits
- Sep 2013 to Aug 2026
- Last 24 months
- 5 permits filed
54 permits since 2000: 49 completed, 4 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 13 completed, 3 in progress, 1 never finaled. Typically 0 days from filing to permit and 70 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 22, 2026 | Completed final sign-off Mar 2026 | 1947 10th Av | kitchen remodeling. new sheetrock, counter top backsplash, new appliances, rewire fixture hook up.Details
kitchen remodeling. new sheetrock, counter top backsplash, new appliances, rewire fixture hook up. | $15,000 |
| Sep 30, 2024 | Completed final sign-off Jan 2025 | 31 Stanford Heights Av | kitchen remodeling, no removal of walls; sub panel, electrical update, easements, floor sink faucet, counter, sliding door, exchange to (e) window replacement bathroom remodeling, (n) deck, tiles, faucet, vanity toilet electricalDetails
kitchen remodeling, no removal of walls; sub panel, electrical update, easements, floor sink faucet, counter, sliding door, exchange to (e) window replacement bathroom remodeling, (n) deck, tiles, faucet, vanity toilet electrical | $30,000 |
| Aug 9, 2024 | In progress issued Aug 2024 | 1730 Lake St | lift kitchen ceiling by 1 foot and remove partition wall between kitchen and dining. ref 202407267404Details
lift kitchen ceiling by 1 foot and remove partition wall between kitchen and dining. ref 202407267404 | $8,000 |
| Aug 1, 2024 | In progress issued Aug 2024 | 1730 Lake St | 2/f: revision to permit 202407267404. 2 bathrooms remodel. for each bathroom, expand shower into closet. replace two kitchen windows. match sill height of higher sill window. window greater than 3ft from property line and not facing street. u=.30maxDetails
2/f: revision to permit 202407267404. 2 bathrooms remodel. for each bathroom, expand shower into closet. replace two kitchen windows. match sill height of higher sill window. window greater than 3ft from property line and not facing street. u=.30max | |
| Jul 26, 2024 | In progress issued Jul 2024 | 1730 Lake St | 1 kitchen and 2 bathrooms remodel in kind. non structural workDetails
1 kitchen and 2 bathrooms remodel in kind. non structural work | $30,000 |
| Jul 2, 2024 | Completed final sign-off Aug 2024 | 447 Orizaba Av | kitchen remodeling in kind. new sub panel, electrical update. new cabinets appliances, sink, flooring. no structural work. no change to floor layout. no change to wall layout.Details
kitchen remodeling in kind. new sub panel, electrical update. new cabinets appliances, sink, flooring. no structural work. no change to floor layout. no change to wall layout. | $17,000 |
| Jun 1, 2022 | Completed final sign-off Oct 2022 | 270 Anderson St | (1) kitchen remodel: new cabinets, flooring, counter top, electrical (1) bathroom remodel: new tub, faucet, flooring, tiles, electrical, vanity, toiletDetails
(1) kitchen remodel: new cabinets, flooring, counter top, electrical (1) bathroom remodel: new tub, faucet, flooring, tiles, electrical, vanity, toilet | $30,000 |
| Mar 18, 2022 | Completed final sign-off Jun 2022 | 915 Vienna St | one kitchen remodeling. new cabinets, new countertop, new sink, faucet, appliances, new sub panel. 50amp rewire, new outlets. 6 lines 20amp.Details
one kitchen remodeling. new cabinets, new countertop, new sink, faucet, appliances, new sub panel. 50amp rewire, new outlets. 6 lines 20amp. | $10,000 |
| Feb 25, 2022 | Completed final sign-off Apr 2022 | 278 Monterey Bl | kitchen remodeling: same layout, new cabinets counter top, new sub panel, new rewire. kitchen size:100 sfDetails
kitchen remodeling: same layout, new cabinets counter top, new sub panel, new rewire. kitchen size:100 sf | $10,000 |
| Mar 18, 2021 | Never finaled issued Mar 2021, no final | 127 Athens St | kitchen remodeling; new cabinets, floor, counter top, electrical countertop, appliances, sink, faucet. in kindDetails
kitchen remodeling; new cabinets, floor, counter top, electrical countertop, appliances, sink, faucet. in kind | $15,000 |
| Mar 4, 2021 | Completed final sign-off Jun 2021 | 262 Circular Av | kitchen remodeling: new cabinets, sink, counter top, appliances, floor, sheetrock, electrical.Details
kitchen remodeling: new cabinets, sink, counter top, appliances, floor, sheetrock, electrical. | $20,000 |
| Nov 13, 2020 | Completed final sign-off Apr 2021 | 141 Bernard St | (1) kitchen & (1) bathroom remodel, same layout. new cabinets, countertop, back splash, new appliances, new electrical. no change in wall/layout/openings.Details
(1) kitchen & (1) bathroom remodel, same layout. new cabinets, countertop, back splash, new appliances, new electrical. no change in wall/layout/openings. | $30,000 |
| Nov 13, 2020 | Completed final sign-off Jan 2021 | 2624 19th St | (1) kitchen remodel, same layout. new electrical, cabinets, countertop, back splash, some sheetrock. no change in wall/layout/openings.Details
(1) kitchen remodel, same layout. new electrical, cabinets, countertop, back splash, some sheetrock. no change in wall/layout/openings. | $20,000 |
| Jun 10, 2020 | Completed final sign-off Oct 2020 | 93 Ford St | remodel 1 bathroom and 1 kitchen like for likeDetails
remodel 1 bathroom and 1 kitchen like for like | $25,000 |
| Apr 16, 2019 | Completed final sign-off Jun 2019 | 7 Red Rock Wy | bathroom remodel, new shower pan, tiles, faucet, shower door, vanity, toilet, new elec. lights. kitchen remodel, new electrical sub panel, rewire, new cabinets, counter top, sink & faucet.Details
bathroom remodel, new shower pan, tiles, faucet, shower door, vanity, toilet, new elec. lights. kitchen remodel, new electrical sub panel, rewire, new cabinets, counter top, sink & faucet. | $30,000 |
| Feb 21, 2018 | Completed final sign-off Apr 2018 | 352 Coleridge St | kitchen remodel, 6 art fault circuits, new cabinets, floor tiles, new appliances, new counter, faucets.Details
kitchen remodel, 6 art fault circuits, new cabinets, floor tiles, new appliances, new counter, faucets. | $8,000 |
| Sep 27, 2013 | Completed final sign-off Oct 2013 | 1567 47th Av | kitchen remodeling. replace cabinets counter, upgrade appliances, counter, sink, faucets, flooring.Details
kitchen remodeling. replace cabinets counter, upgrade appliances, counter, sink, faucets, flooring. | $3,500 |