Mr Unger
- Based in
- South San Francisco
- On San Francisco permits
- Sep 2013 to Aug 2026
- Last 24 months
- 5 permits filed
54 permits since 2000: 49 completed, 4 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2026 | Completed final sign-off Sep 2026 | 1800 Bryant St | unit # 302: bathroom remodeling: new showerpan, tiles, faucet, vanity, toilet, fan. all work in kind.Details
unit # 302: bathroom remodeling: new showerpan, tiles, faucet, vanity, toilet, fan. all work in kind. | $12,000 |
| Jun 2, 2026 | Completed final sign-off Jul 2026 | 1800 Bryant St | unit 214: bathroom remodel, new shower pan, shower to shower, new faucet, tiles, vanity, toilet, fan, lights.Details
unit 214: bathroom remodel, new shower pan, shower to shower, new faucet, tiles, vanity, toilet, fan, lights. | $15,000 |
| Jan 22, 2026 | Completed final sign-off Mar 2026 | 1947 10th Av | kitchen remodeling. new sheetrock, counter top backsplash, new appliances, rewire fixture hook up.Details
kitchen remodeling. new sheetrock, counter top backsplash, new appliances, rewire fixture hook up. | $15,000 |
| Aug 29, 2025 | Completed final sign-off Oct 2025 | 1828 Eddy St | bathroom remodeling:shower pan, faucet, tiles, vanity and toilet. in kindDetails
bathroom remodeling:shower pan, faucet, tiles, vanity and toilet. in kind | $10,000 |
| Feb 28, 2025 | In progress issued Apr 2025 | 1730 Lake St | 2/f: remove fireplace and internal stairs to expand living room, raise ceiling from 8' to 9' over fireplace and foyer, deck and convert 2 windows to doors opening to deck. 1/f: demo partition walls and reconfigure layout with family room, bedroom with bathroom, and walk-in closet, laundry room andDetails
2/f: remove fireplace and internal stairs to expand living room, raise ceiling from 8' to 9' over fireplace and foyer, deck and convert 2 windows to doors opening to deck. 1/f: demo partition walls and reconfigure layout with family room, bedroom with bathroom, and walk-in closet, laundry room and | $115,000 |
| Sep 30, 2024 | Completed final sign-off Jan 2025 | 31 Stanford Heights Av | kitchen remodeling, no removal of walls; sub panel, electrical update, easements, floor sink faucet, counter, sliding door, exchange to (e) window replacement bathroom remodeling, (n) deck, tiles, faucet, vanity toilet electricalDetails
kitchen remodeling, no removal of walls; sub panel, electrical update, easements, floor sink faucet, counter, sliding door, exchange to (e) window replacement bathroom remodeling, (n) deck, tiles, faucet, vanity toilet electrical | $30,000 |
| Aug 9, 2024 | In progress issued Aug 2024 | 1730 Lake St | lift kitchen ceiling by 1 foot and remove partition wall between kitchen and dining. ref 202407267404Details
lift kitchen ceiling by 1 foot and remove partition wall between kitchen and dining. ref 202407267404 | $8,000 |
| Aug 1, 2024 | In progress issued Aug 2024 | 1730 Lake St | 2/f: revision to permit 202407267404. 2 bathrooms remodel. for each bathroom, expand shower into closet. replace two kitchen windows. match sill height of higher sill window. window greater than 3ft from property line and not facing street. u=.30maxDetails
2/f: revision to permit 202407267404. 2 bathrooms remodel. for each bathroom, expand shower into closet. replace two kitchen windows. match sill height of higher sill window. window greater than 3ft from property line and not facing street. u=.30max | |
| Jul 26, 2024 | In progress issued Jul 2024 | 1730 Lake St | 1 kitchen and 2 bathrooms remodel in kind. non structural workDetails
1 kitchen and 2 bathrooms remodel in kind. non structural work | $30,000 |
| Jul 2, 2024 | Completed final sign-off Sep 2024 | 685 Orizaba Av | bathroom remodeling in kind: replace tub, tiles, electrical update. new plumbing, vanity toilet, sheetrock paint. no structural work. no change to floor layout. no change to wall layout.Details
bathroom remodeling in kind: replace tub, tiles, electrical update. new plumbing, vanity toilet, sheetrock paint. no structural work. no change to floor layout. no change to wall layout. | $15,000 |
| Jul 2, 2024 | Completed final sign-off Aug 2024 | 447 Orizaba Av | kitchen remodeling in kind. new sub panel, electrical update. new cabinets appliances, sink, flooring. no structural work. no change to floor layout. no change to wall layout.Details
kitchen remodeling in kind. new sub panel, electrical update. new cabinets appliances, sink, flooring. no structural work. no change to floor layout. no change to wall layout. | $17,000 |
| Mar 8, 2024 | Completed final sign-off Jun 2024 | 54 Bridgeview Dr | one bathroom remodeling - no wall movement. shower pan, floor, new sheetrock, vanity, toilet.Details
one bathroom remodeling - no wall movement. shower pan, floor, new sheetrock, vanity, toilet. | $15,000 |
| Aug 25, 2023 | Completed final sign-off Jan 2025 | 270 Anderson St | alteration to existing building to add home office, bath and utility room on first floor.Details
alteration to existing building to add home office, bath and utility room on first floor. | $60,000 |
| Jul 19, 2023 | Completed final sign-off Sep 2023 | 303 30th Av | bathroom remodel in-kind. new tub, tiles, floor, light gfci, vanity, toilet. all in kind. approx. 40 square feet.Details
bathroom remodel in-kind. new tub, tiles, floor, light gfci, vanity, toilet. all in kind. approx. 40 square feet. | $15,000 |
| Jun 20, 2023 | Completed final sign-off Oct 2023 | 970 Duncan St | #205: bathroom remodel: new tub, faucet, tiles, vanity, toilet gfci.Details
#205: bathroom remodel: new tub, faucet, tiles, vanity, toilet gfci. | $20,000 |
| May 16, 2023 | Completed final sign-off Jul 2023 | 1235 Mcallister St | unit # 211: bathroom remodel in-kind. replacing tub, faucet, tiles, vanity, toilet.Details
unit # 211: bathroom remodel in-kind. replacing tub, faucet, tiles, vanity, toilet. | $20,000 |
| May 5, 2023 | Completed final sign-off Jun 2023 | 1847 29th Av | remodel (e) one bathroom: new facuet, tiles, toilet, vanity. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5 plumbing fixtures count no changeDetails
remodel (e) one bathroom: new facuet, tiles, toilet, vanity. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5 plumbing fixtures count no change | $15,000 |
| Apr 14, 2023 | Completed final sign-off Aug 2023 | 7 Red Rock Wy | one bathroom remodeling: new tub, tiles, sink, fan, toilet. non structural.Details
one bathroom remodeling: new tub, tiles, sink, fan, toilet. non structural. | $10,000 |
| Jan 6, 2023 | Completed final sign-off Mar 2023 | 35 Stanford Heights Av | bathroom remodeling: new tub, faucet, tiles, vanity, toilet, electrical fan. kitcen remodeling: new cabinets, floor, counter, sub panel, outlets. rewire.Details
bathroom remodeling: new tub, faucet, tiles, vanity, toilet, electrical fan. kitcen remodeling: new cabinets, floor, counter, sub panel, outlets. rewire. | $30,000 |
| Jun 27, 2022 | Completed final sign-off Aug 2022 | 1846 23rd Av | bathroom remodeling in kind - new shower, faucet, new electrical, tiles, shower door, vanity, fan, and toliet. no structural work & no change in floor layout orDetails
bathroom remodeling in kind - new shower, faucet, new electrical, tiles, shower door, vanity, fan, and toliet. no structural work & no change in floor layout or | $10,000 |
| Jun 1, 2022 | Completed final sign-off Oct 2022 | 270 Anderson St | (1) kitchen remodel: new cabinets, flooring, counter top, electrical (1) bathroom remodel: new tub, faucet, flooring, tiles, electrical, vanity, toiletDetails
(1) kitchen remodel: new cabinets, flooring, counter top, electrical (1) bathroom remodel: new tub, faucet, flooring, tiles, electrical, vanity, toilet | $30,000 |
| Mar 18, 2022 | Completed final sign-off May 2022 | 2250 24th St | one bathroom remodeling: new tub, tiles, vanity, toilet, rewire. same layout.Details
one bathroom remodeling: new tub, tiles, vanity, toilet, rewire. same layout. | $7,000 |
| Mar 18, 2022 | Completed final sign-off Jun 2022 | 915 Vienna St | one kitchen remodeling. new cabinets, new countertop, new sink, faucet, appliances, new sub panel. 50amp rewire, new outlets. 6 lines 20amp.Details
one kitchen remodeling. new cabinets, new countertop, new sink, faucet, appliances, new sub panel. 50amp rewire, new outlets. 6 lines 20amp. | $10,000 |
| Feb 25, 2022 | Completed final sign-off Apr 2022 | 278 Monterey Bl | kitchen remodeling: same layout, new cabinets counter top, new sub panel, new rewire. kitchen size:100 sfDetails
kitchen remodeling: same layout, new cabinets counter top, new sub panel, new rewire. kitchen size:100 sf | $10,000 |
| Feb 9, 2022 | Completed final sign-off Apr 2022 | 18 Fortuna Av | bathroom remodeling: new shower pan, replace window (not visible from street), new faucet, vanity, toilet, and tiles.Details
bathroom remodeling: new shower pan, replace window (not visible from street), new faucet, vanity, toilet, and tiles. | $10,000 |
| Feb 9, 2022 | Completed final sign-off Mar 2022 | 65 Hermann St | unit #8. bathroom remodeling: new tub, tiles, vanity, toliet, etc.Details
unit #8. bathroom remodeling: new tub, tiles, vanity, toliet, etc. | $10,000 |
| Jul 22, 2021 | Completed final sign-off Sep 2021 | 18 Fortuna Av | bathroom remodeling: new tub, new shower faucet, new tile, toilet, vanity, showepan.. same layout, 50 sq ft.Details
bathroom remodeling: new tub, new shower faucet, new tile, toilet, vanity, showepan.. same layout, 50 sq ft. | $15,000 |
| Jul 22, 2021 | Completed final sign-off Feb 2022 | 449 Ellsworth St | bathroom remodeling: new tub, new shower faucet, new tile, toilet, vanity. same layout, 40 sq ft.Details
bathroom remodeling: new tub, new shower faucet, new tile, toilet, vanity. same layout, 40 sq ft. | $12,000 |
| Jul 22, 2021 | Completed final sign-off Nov 2021 | 1960 10th Av | remodel bathroom at 2nd fl: shower panm toilet, vanity, tiles, painting, shower doors. same layout.Details
remodel bathroom at 2nd fl: shower panm toilet, vanity, tiles, painting, shower doors. same layout. | $12,000 |
| Mar 18, 2021 | Completed final sign-off Aug 2021 | 1539 Felton St | bathroom remodeling: new shower pan, faucet, shower doors, new electrical, toilet, vanity, tile (like for like)Details
bathroom remodeling: new shower pan, faucet, shower doors, new electrical, toilet, vanity, tile (like for like) | $12,000 |
| Mar 18, 2021 | Never finaled issued Mar 2021, no final | 127 Athens St | kitchen remodeling; new cabinets, floor, counter top, electrical countertop, appliances, sink, faucet. in kindDetails
kitchen remodeling; new cabinets, floor, counter top, electrical countertop, appliances, sink, faucet. in kind | $15,000 |
| Mar 4, 2021 | Completed final sign-off Jun 2021 | 262 Circular Av | kitchen remodeling: new cabinets, sink, counter top, appliances, floor, sheetrock, electrical.Details
kitchen remodeling: new cabinets, sink, counter top, appliances, floor, sheetrock, electrical. | $20,000 |
| Jan 6, 2021 | Completed final sign-off Mar 2021 | 1459 31st Av | bathroom remodel, new tub, sink, vanity, fan, tiles, new gfciDetails
bathroom remodel, new tub, sink, vanity, fan, tiles, new gfci | $10,000 |
| Jan 6, 2021 | Completed final sign-off Mar 2021 | 352 Coleridge St | main bathroom remodel, new tub, sink tiles, add toilet, move plumbing for toilet, new fan, 20 amp dedicated electrical, rewire, 1/2 add new sink, new toilet, rewire.Details
main bathroom remodel, new tub, sink tiles, add toilet, move plumbing for toilet, new fan, 20 amp dedicated electrical, rewire, 1/2 add new sink, new toilet, rewire. | $15,000 |
| Nov 13, 2020 | Completed final sign-off Apr 2021 | 141 Bernard St | (1) kitchen & (1) bathroom remodel, same layout. new cabinets, countertop, back splash, new appliances, new electrical. no change in wall/layout/openings.Details
(1) kitchen & (1) bathroom remodel, same layout. new cabinets, countertop, back splash, new appliances, new electrical. no change in wall/layout/openings. | $30,000 |
| Nov 13, 2020 | Completed final sign-off Jan 2021 | 2624 19th St | (1) kitchen remodel, same layout. new electrical, cabinets, countertop, back splash, some sheetrock. no change in wall/layout/openings.Details
(1) kitchen remodel, same layout. new electrical, cabinets, countertop, back splash, some sheetrock. no change in wall/layout/openings. | $20,000 |
| Jun 10, 2020 | Completed final sign-off Oct 2020 | 93 Ford St | remodel 1 bathroom and 1 kitchen like for likeDetails
remodel 1 bathroom and 1 kitchen like for like | $25,000 |
| Jan 27, 2020 | Completed final sign-off Mar 2020 | 1978 Green St | bathroom remodeling: new tiles, shower pan, new shower fixtures, floor, vanity, lights, fan.Details
bathroom remodeling: new tiles, shower pan, new shower fixtures, floor, vanity, lights, fan. | $10,000 |
| Oct 10, 2019 | Completed final sign-off Dec 2019 | 1976 Green St | remodel 1 bathroom: shower, faucet, toilet,tiles, gfci etc.Details
remodel 1 bathroom: shower, faucet, toilet,tiles, gfci etc. | $15,000 |
| Aug 14, 2019 | Completed final sign-off Oct 2019 | 57 Jersey St | bathroom remodeling: same lay out, new tub, tiles, fan, floor, vanity etc.Details
bathroom remodeling: same lay out, new tub, tiles, fan, floor, vanity etc. | $12,000 |
| Apr 29, 2019 | Completed final sign-off Jun 2019 | 675 Grand View Av | bathroom remodeling hall (showr pan , facialk tibes fan)Details
bathroom remodeling hall (showr pan , facialk tibes fan) | $12,000 |
| Apr 16, 2019 | Completed final sign-off Jun 2019 | 7 Red Rock Wy | bathroom remodel, new shower pan, tiles, faucet, shower door, vanity, toilet, new elec. lights. kitchen remodel, new electrical sub panel, rewire, new cabinets, counter top, sink & faucet.Details
bathroom remodel, new shower pan, tiles, faucet, shower door, vanity, toilet, new elec. lights. kitchen remodel, new electrical sub panel, rewire, new cabinets, counter top, sink & faucet. | $30,000 |
| Feb 13, 2019 | Completed final sign-off Apr 2019 | 281 Clara St | new shower , shower faucet, new vanity tiles in the shoer & floor new toilet new gfci vacancy sensor hunidity switch etc no change on wallsDetails
new shower , shower faucet, new vanity tiles in the shoer & floor new toilet new gfci vacancy sensor hunidity switch etc no change on walls | $10,000 |
| Jan 2, 2019 | Completed final sign-off Jan 2019 | 1029 Natoma St | new tiles in tub area only. new faucet. maher n/aDetails
new tiles in tub area only. new faucet. maher n/a | $6,000 |
| Oct 19, 2018 | Completed final sign-off Nov 2018 | 195 Dalewood Wy | bathroom remodeling in-kind: shower faucet, new tub, new fan, new ded ckts, vanity,toilet, tile floor and shower area. no structural work. comply with cec150.01k-5.Details
bathroom remodeling in-kind: shower faucet, new tub, new fan, new ded ckts, vanity,toilet, tile floor and shower area. no structural work. comply with cec150.01k-5. | $10,800 |
| Jun 18, 2018 | Completed final sign-off Oct 2018 | 522 Wisconsin St | bathroom remodeling, new shower pan, faucet, floor, vanity, faucet, new gfci, lights, shower door, tile surround. 40 sq ft.Details
bathroom remodeling, new shower pan, faucet, floor, vanity, faucet, new gfci, lights, shower door, tile surround. 40 sq ft. | $10,000 |
| Jun 18, 2018 | Completed final sign-off Jun 2018 | 1407 39th Av | to comply with nov# 201870403 date 6/12/18. remove sliding door, second floor and frame new window. 60"x36" fix siding only.Details
to comply with nov# 201870403 date 6/12/18. remove sliding door, second floor and frame new window. 60"x36" fix siding only. | $900 |
| Apr 9, 2018 | Completed final sign-off May 2018 | 41 Wilder St | bathroom remodeling new tub, shower pan, faucets, fan, vanity new grci toiletDetails
bathroom remodeling new tub, shower pan, faucets, fan, vanity new grci toilet | $10,000 |
| Feb 21, 2018 | Completed final sign-off Apr 2018 | 352 Coleridge St | kitchen remodel, 6 art fault circuits, new cabinets, floor tiles, new appliances, new counter, faucets.Details
kitchen remodel, 6 art fault circuits, new cabinets, floor tiles, new appliances, new counter, faucets. | $8,000 |
| Jan 12, 2018 | Completed final sign-off Feb 2018 | 2210 45th Av | bathroom remodel, like for like. electrical gfci, new tubv, tiles, vanity, toilet, etc. no change of (e) layoutDetails
bathroom remodel, like for like. electrical gfci, new tubv, tiles, vanity, toilet, etc. no change of (e) layout | $10,000 |
| Nov 13, 2017 | Completed final sign-off Dec 2017 | 179 Seal Rock Dr | bathroom remodeling, like for like, new tub, tiles, floor, toilet, fan, vanity. 2nd floor.Details
bathroom remodeling, like for like, new tub, tiles, floor, toilet, fan, vanity. 2nd floor. | $11,000 |
| Nov 8, 2016 | Completed final sign-off Dec 2016 | 427 20th Av | bathroom remodel, new shower pan, faucet, tiles, shower door, floor tiles, new toilet, vanity.Details
bathroom remodel, new shower pan, faucet, tiles, shower door, floor tiles, new toilet, vanity. | $6,500 |
| Apr 15, 2015 | Completed final sign-off May 2015 | 1509 29th Av | bathroom remodeling like to like, replace shower pan, shower faucet, floor , toilet, vanity. work on #1509Details
bathroom remodeling like to like, replace shower pan, shower faucet, floor , toilet, vanity. work on #1509 | $10,000 |
| Sep 27, 2013 | Completed final sign-off Oct 2013 | 1567 47th Av | kitchen remodeling. replace cabinets counter, upgrade appliances, counter, sink, faucets, flooring.Details
kitchen remodeling. replace cabinets counter, upgrade appliances, counter, sink, faucets, flooring. | $3,500 |