Back to kitchen remodel contractors
Moreno Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Feb 2023
- Last 24 months
- 0 permits filed
89 permits since 2000: 76 completed, 4 never finaled, 9 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
26 kitchen remodel permits: 22 completed, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 198 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 28, 2020 | Completed final sign-off Jun 2020 | 430 Fillmore St | install (10) 5" recessed lights at kitchen and family room. remodel 1 bath, replace 2 fans at 2 bath. no structural work/door/ windows. rough ini new plumning & electrical in laundryDetails
install (10) 5" recessed lights at kitchen and family room. remodel 1 bath, replace 2 fans at 2 bath. no structural work/door/ windows. rough ini new plumning & electrical in laundry | $16,500 |
| Aug 23, 2019 | Completed final sign-off Jan 2020 | 1632 Vallejo St | kitchen: remove/replace drywall (5/8" type x) on ceiling/install (9) 5 led lights; bathroom (50 sq. ft.): complete remodel on (e) layout. remove/replace plumbing fixtures, new drywall (5/8" type x) on ceiling/walls; new air fanDetails
kitchen: remove/replace drywall (5/8" type x) on ceiling/install (9) 5 led lights; bathroom (50 sq. ft.): complete remodel on (e) layout. remove/replace plumbing fixtures, new drywall (5/8" type x) on ceiling/walls; new air fan | $18,000 |
| Jun 25, 2019 | Completed final sign-off Jun 2020 | 430 Fillmore St | unit a: (1) kitchen remodel: replace cabinets, counter tops, appliances, fixtures, relocate kitchen sink & dishwasher (approx 72 sqft 8'x8'10") (2) replace interior patio door (not visible from street). (3) add washer and dryer in existing closet. replace closet door with accordian.Details
unit a: (1) kitchen remodel: replace cabinets, counter tops, appliances, fixtures, relocate kitchen sink & dishwasher (approx 72 sqft 8'x8'10") (2) replace interior patio door (not visible from street). (3) add washer and dryer in existing closet. replace closet door with accordian. | $15,000 |
| Feb 19, 2016 | Completed final sign-off Dec 2018 | 236 Day St | (work on front bldg). build new vertical 3rd fl addition which included bedrm, bathrm, & family room. work to include renovation of (e) kitchen on second flr. the addition will be topped w/flat roof & horizonatal wood cladding. all new 3rd flor windows will face the rear.Details
(work on front bldg). build new vertical 3rd fl addition which included bedrm, bathrm, & family room. work to include renovation of (e) kitchen on second flr. the addition will be topped w/flat roof & horizonatal wood cladding. all new 3rd flor windows will face the rear. | $250,000 |
| Dec 4, 2015 | Completed final sign-off Jun 2016 | 1732 Funston Av | full kitchen remodel on both units, full bathroom remodel in each unit, upgrade electrical in both units and add electrical meter for common areas. no structural work to be performed, no change on walls.Details
full kitchen remodel on both units, full bathroom remodel in each unit, upgrade electrical in both units and add electrical meter for common areas. no structural work to be performed, no change on walls. | $50,000 |
| Nov 20, 2015 | Completed final sign-off Sep 2016 | 651 Capp St | legalize (e) half bathroom and storage room garage level. add gas line to existing kitchen on 2nd fl and legalize laundry area on 1/fDetails
legalize (e) half bathroom and storage room garage level. add gas line to existing kitchen on 2nd fl and legalize laundry area on 1/f | $15,000 |
| May 27, 2015 | Completed final sign-off Mar 2016 | 1251 Waller St | removal of in law unit at 1st floor gr level. bathroom and kitchenette removal. former inlaw to be used for storage.Details
removal of in law unit at 1st floor gr level. bathroom and kitchenette removal. former inlaw to be used for storage. | $5,000 |
| Feb 10, 2015 | Completed final sign-off Apr 2015 | 6424 California St | unit #2 & #3: 2 bathroom remodels, kitchen upgrade (electrical), remove/replace all plumbing fixtures. cosmetic onlyDetails
unit #2 & #3: 2 bathroom remodels, kitchen upgrade (electrical), remove/replace all plumbing fixtures. cosmetic only | $10,000 |
| Sep 17, 2012 | Completed final sign-off Mar 2013 | 2656 Greenwich St | install 4 skylights (flat) 2 at hallway, 1 kitchen, 1 at staris hallway.Details
install 4 skylights (flat) 2 at hallway, 1 kitchen, 1 at staris hallway. | $5,000 |
| Aug 15, 2012 | Never finaled issued Aug 2012, no final | 2656 Greenwich St | one bathroom remodel at 2nd floor elevation. remove & replace 7 windows at rear of the house. not visible from street. install electrical panel at laundry room. new plugs at family room. new lights at kitchen hall.Details
one bathroom remodel at 2nd floor elevation. remove & replace 7 windows at rear of the house. not visible from street. install electrical panel at laundry room. new plugs at family room. new lights at kitchen hall. | $40,000 |
| Dec 13, 2011 | Completed final sign-off Feb 2012 | 1628 Page St | finding dryrot at kitchen and bath elevation. all work in kind. no change in floor plan. minor dryrot repair to wall studs/wood plates. revision to 201111239533Details
finding dryrot at kitchen and bath elevation. all work in kind. no change in floor plan. minor dryrot repair to wall studs/wood plates. revision to 201111239533 | $2,800 |
| Nov 23, 2011 | Completed final sign-off Feb 2012 | 1628 Page St | kitchen and bathroom remodeling -lighting per cec 150(k) remove and repl plumbing and electrical fixtures, add laundry at pantry area windows ot visible from street, remove and replace 6 windows (no structural work) u factor .40 maxDetails
kitchen and bathroom remodeling -lighting per cec 150(k) remove and repl plumbing and electrical fixtures, add laundry at pantry area windows ot visible from street, remove and replace 6 windows (no structural work) u factor .40 max | $35,000 |
| May 18, 2011 | Completed final sign-off Nov 2011 | 3350 22nd St | remodel of 2 kitchens and 2 bathrooms (1 kitchen & 1 bathroom per unit)at 3rd and 2nd floor. no new lighting. no structural work.Details
remodel of 2 kitchens and 2 bathrooms (1 kitchen & 1 bathroom per unit)at 3rd and 2nd floor. no new lighting. no structural work. | $25,000 |
| Oct 12, 2010 | Completed final sign-off Jun 2011 | 405 Mangels Av | all kitchen remodel, new cabinets, new appliances, new recessed lighting, replace old electrical outlets at counter space for all gfiDetails
all kitchen remodel, new cabinets, new appliances, new recessed lighting, replace old electrical outlets at counter space for all gfi | $10,000 |
| Dec 17, 2009 | Completed final sign-off Apr 2010 | 635 Moscow St | kitchen & bathroom remodel-remove/install new cabinets, complete removal of bathroom fixtures, no structural work, upgrade electrical to kitchen & bathroom. install new receptacles in rooms & install gfci protected receptacles. new drywall to bathroom & kitchen. new lights. no moving or adding wallsDetails
kitchen & bathroom remodel-remove/install new cabinets, complete removal of bathroom fixtures, no structural work, upgrade electrical to kitchen & bathroom. install new receptacles in rooms & install gfci protected receptacles. new drywall to bathroom & kitchen. new lights. no moving or adding walls | $36,000 |
| Feb 21, 2008 | Completed final sign-off Jul 2008 | 3795 20th St | kitchen and bathroom remodel on 2nd floor, addition of bathoom and laundry room on 2nd floorDetails
kitchen and bathroom remodel on 2nd floor, addition of bathoom and laundry room on 2nd floor | $45,000 |
| Jan 31, 2007 | Expired or cancelled expired Feb 2013 | 3797 20th St | as per plans, kitchen/new laundry room and two bathroom remodeling. new plumbing and upgrade electrical to kitchen, bathrooms, laundry room, close up opening as per plans, add new wallsDetails
as per plans, kitchen/new laundry room and two bathroom remodeling. new plumbing and upgrade electrical to kitchen, bathrooms, laundry room, close up opening as per plans, add new walls | $39,000 |
| Mar 28, 2006 | Completed final sign-off Jul 2006 | 478 Wilde Av | new rear yard deck off of and (e) kitchen, remove and replace of (e) window opening with new sliding door, dry wall repair to interior wall.Details
new rear yard deck off of and (e) kitchen, remove and replace of (e) window opening with new sliding door, dry wall repair to interior wall. | $6,700 |
| Mar 14, 2006 | Completed final sign-off Oct 2006 | 3220 17th St | kitchen and 1 bathrooms remodeling. install all new partition walls for master bathroom. add 1 bathroom to 1/f, repair dry wall, gas fire place line only.non bearing partition walls.Details
kitchen and 1 bathrooms remodeling. install all new partition walls for master bathroom. add 1 bathroom to 1/f, repair dry wall, gas fire place line only.non bearing partition walls. | $55,000 |
| May 27, 2005 | Completed final sign-off Apr 2006 | 3218 17th St | bathroom kitchen remodeling remove and replace all fixtures install new closet to main hallwayDetails
bathroom kitchen remodeling remove and replace all fixtures install new closet to main hallway | $42,000 |
| Mar 8, 2004 | Completed final sign-off Oct 2004 | 650 43rd Av | kitchen remodeling upgrade electrical water suply drywall insulation (kitchen) bathroom remove andDetails
kitchen remodeling upgrade electrical water suply drywall insulation (kitchen) bathroom remove and | $45,000 |
| Nov 19, 2003 | Completed final sign-off Feb 2004 | 6 Prospect Av | comply 20035436. kitchen & bathroom remodeling.Details
comply 20035436. kitchen & bathroom remodeling. | $12,000 |
| Jun 21, 2002 | Completed final sign-off Oct 2006 | 542 Staples Av | remodel bath&kitchen-new furnace&water heater ,vinyl&wood window.dryrot repair to front stair &mud sDetails
remodel bath&kitchen-new furnace&water heater ,vinyl&wood window.dryrot repair to front stair &mud s | $120,000 |
| Jan 30, 2002 | Completed final sign-off Aug 2002 | 152 Clipper St | kitchen remodeling.remove cabinets and reset new cabinets,electrical,plumbing.Details
kitchen remodeling.remove cabinets and reset new cabinets,electrical,plumbing. | $12,000 |
| Apr 2, 2001 | Expired or cancelled expired Aug 2001 | 685 Peralta Av | revise to 2001/03/22/4935. add 27x27 skylight at kitchen.Details
revise to 2001/03/22/4935. add 27x27 skylight at kitchen. | |
| Mar 22, 2001 | Expired or cancelled expired Sep 2001 | 685 Peralta Av | remodeling kitchen & bath.Details
remodeling kitchen & bath. | $15,000 |