Back to bathroom remodel contractors
Moreno Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Feb 2023
- Last 24 months
- 0 permits filed
89 permits since 2000: 76 completed, 4 never finaled, 9 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
34 bathroom remodel permits: 31 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 14, 2021 | Completed final sign-off Aug 2022 | 968 Guerrero St | remodel 2nd floor bathroom, convert bathtub to shower. all elese like for like.Details
remodel 2nd floor bathroom, convert bathtub to shower. all elese like for like. | $20,000 |
| Jan 28, 2020 | Completed final sign-off Jun 2020 | 430 Fillmore St | install (10) 5" recessed lights at kitchen and family room. remodel 1 bath, replace 2 fans at 2 bath. no structural work/door/ windows. rough ini new plumning & electrical in laundryDetails
install (10) 5" recessed lights at kitchen and family room. remodel 1 bath, replace 2 fans at 2 bath. no structural work/door/ windows. rough ini new plumning & electrical in laundry | $16,500 |
| Aug 23, 2019 | Completed final sign-off Jan 2020 | 1632 Vallejo St | kitchen: remove/replace drywall (5/8" type x) on ceiling/install (9) 5 led lights; bathroom (50 sq. ft.): complete remodel on (e) layout. remove/replace plumbing fixtures, new drywall (5/8" type x) on ceiling/walls; new air fanDetails
kitchen: remove/replace drywall (5/8" type x) on ceiling/install (9) 5 led lights; bathroom (50 sq. ft.): complete remodel on (e) layout. remove/replace plumbing fixtures, new drywall (5/8" type x) on ceiling/walls; new air fan | $18,000 |
| Aug 17, 2018 | Completed final sign-off Feb 2019 | 1732 Funston Av | interior alterations. add one new entertainment room, one bathroom, and one laundry room on 1st fl with new interior connection per plan.Details
interior alterations. add one new entertainment room, one bathroom, and one laundry room on 1st fl with new interior connection per plan. | $5,000 |
| Jul 31, 2018 | Completed final sign-off Dec 2018 | 236 Day St | revision to pa 2016-0219-0057s1, 2nd floor bathroom - w/d closet made bigger. 2nd fl bedroom closet moved location. 3rd fl - bathroom door moved location. roof deck added additional sq. ft.Details
revision to pa 2016-0219-0057s1, 2nd floor bathroom - w/d closet made bigger. 2nd fl bedroom closet moved location. 3rd fl - bathroom door moved location. roof deck added additional sq. ft. | |
| Dec 4, 2015 | Completed final sign-off Jun 2016 | 1732 Funston Av | full kitchen remodel on both units, full bathroom remodel in each unit, upgrade electrical in both units and add electrical meter for common areas. no structural work to be performed, no change on walls.Details
full kitchen remodel on both units, full bathroom remodel in each unit, upgrade electrical in both units and add electrical meter for common areas. no structural work to be performed, no change on walls. | $50,000 |
| Nov 20, 2015 | Completed final sign-off Sep 2016 | 651 Capp St | legalize (e) half bathroom and storage room garage level. add gas line to existing kitchen on 2nd fl and legalize laundry area on 1/fDetails
legalize (e) half bathroom and storage room garage level. add gas line to existing kitchen on 2nd fl and legalize laundry area on 1/f | $15,000 |
| Jun 25, 2015 | Completed final sign-off Nov 2015 | 1650 Plymouth Av | upgrade (e) master bath,with new shower pan, new shower diverters, new double vanity sink. remove old elecgtrical subpanel and re-run new circuits to new (e) panel. new electrical circuit for bath. comply cec150(k)5Details
upgrade (e) master bath,with new shower pan, new shower diverters, new double vanity sink. remove old elecgtrical subpanel and re-run new circuits to new (e) panel. new electrical circuit for bath. comply cec150(k)5 | $12,000 |
| May 27, 2015 | Completed final sign-off Mar 2016 | 1251 Waller St | removal of in law unit at 1st floor gr level. bathroom and kitchenette removal. former inlaw to be used for storage.Details
removal of in law unit at 1st floor gr level. bathroom and kitchenette removal. former inlaw to be used for storage. | $5,000 |
| Feb 10, 2015 | Completed final sign-off Apr 2015 | 6424 California St | unit #2 & #3: 2 bathroom remodels, kitchen upgrade (electrical), remove/replace all plumbing fixtures. cosmetic onlyDetails
unit #2 & #3: 2 bathroom remodels, kitchen upgrade (electrical), remove/replace all plumbing fixtures. cosmetic only | $10,000 |
| Jul 28, 2014 | Completed final sign-off Jan 2015 | 125 Curtis St | bathroom remodeling in the upstairs hallway. remove & replace all plumbing fixtures (no changes) upgrade electrical in bahtroom. front elevation - fix garage door opening due to car damage (no structural). new garage door to be installed.Details
bathroom remodeling in the upstairs hallway. remove & replace all plumbing fixtures (no changes) upgrade electrical in bahtroom. front elevation - fix garage door opening due to car damage (no structural). new garage door to be installed. | $26,000 |
| Feb 28, 2014 | Completed final sign-off Apr 2014 | 4438 18th St | renovation of an existing half bath, wet bar & garage including removing bar sink, adding a shower, new ducting for dryer, ceiling repair, & window repair.Details
renovation of an existing half bath, wet bar & garage including removing bar sink, adding a shower, new ducting for dryer, ceiling repair, & window repair. | $7,000 |
| May 9, 2013 | Completed final sign-off Jul 2013 | 1543 Mcallister St | bathroom remodeling, replace in kind, remove & replace all fixtures, remove & repair minor dryrot, repair shower pan.Details
bathroom remodeling, replace in kind, remove & replace all fixtures, remove & repair minor dryrot, repair shower pan. | $9,000 |
| Oct 25, 2012 | Completed final sign-off Mar 2013 | 2656 Greenwich St | add master bathroom at 3rd floor (front of house). no structural work.Details
add master bathroom at 3rd floor (front of house). no structural work. | $26,000 |
| Aug 15, 2012 | Never finaled issued Aug 2012, no final | 2656 Greenwich St | one bathroom remodel at 2nd floor elevation. remove & replace 7 windows at rear of the house. not visible from street. install electrical panel at laundry room. new plugs at family room. new lights at kitchen hall.Details
one bathroom remodel at 2nd floor elevation. remove & replace 7 windows at rear of the house. not visible from street. install electrical panel at laundry room. new plugs at family room. new lights at kitchen hall. | $40,000 |
| Dec 13, 2011 | Completed final sign-off Feb 2012 | 1628 Page St | finding dryrot at kitchen and bath elevation. all work in kind. no change in floor plan. minor dryrot repair to wall studs/wood plates. revision to 201111239533Details
finding dryrot at kitchen and bath elevation. all work in kind. no change in floor plan. minor dryrot repair to wall studs/wood plates. revision to 201111239533 | $2,800 |
| Nov 23, 2011 | Completed final sign-off Feb 2012 | 1628 Page St | kitchen and bathroom remodeling -lighting per cec 150(k) remove and repl plumbing and electrical fixtures, add laundry at pantry area windows ot visible from street, remove and replace 6 windows (no structural work) u factor .40 maxDetails
kitchen and bathroom remodeling -lighting per cec 150(k) remove and repl plumbing and electrical fixtures, add laundry at pantry area windows ot visible from street, remove and replace 6 windows (no structural work) u factor .40 max | $35,000 |
| Sep 30, 2011 | Completed final sign-off Nov 2011 | 410 Miramar Av | bathroom remodel: repair dry-rot under jaccuzzi. install two new electrical circuits.Details
bathroom remodel: repair dry-rot under jaccuzzi. install two new electrical circuits. | $3,600 |
| May 18, 2011 | Completed final sign-off Nov 2011 | 3350 22nd St | remodel of 2 kitchens and 2 bathrooms (1 kitchen & 1 bathroom per unit)at 3rd and 2nd floor. no new lighting. no structural work.Details
remodel of 2 kitchens and 2 bathrooms (1 kitchen & 1 bathroom per unit)at 3rd and 2nd floor. no new lighting. no structural work. | $25,000 |
| Apr 4, 2011 | Completed final sign-off Jun 2011 | 390 Mangels Av | (n) bedroom & bathroom @ street level floor.Details
(n) bedroom & bathroom @ street level floor. | $15,000 |
| Jun 23, 2010 | Completed final sign-off Dec 2010 | 185 Margaret Av | to comply with nov#201039418, 29-mar-10. partial restoration & repairs to include garage floor replacement at existing garage; former had collapsed into crawl space. new structural provided. renovation will include the addition of a new 1-1/2 baths at expanded basement level condition space.Details
to comply with nov#201039418, 29-mar-10. partial restoration & repairs to include garage floor replacement at existing garage; former had collapsed into crawl space. new structural provided. renovation will include the addition of a new 1-1/2 baths at expanded basement level condition space. | $60,000 |
| Dec 17, 2009 | Completed final sign-off Apr 2010 | 635 Moscow St | kitchen & bathroom remodel-remove/install new cabinets, complete removal of bathroom fixtures, no structural work, upgrade electrical to kitchen & bathroom. install new receptacles in rooms & install gfci protected receptacles. new drywall to bathroom & kitchen. new lights. no moving or adding wallsDetails
kitchen & bathroom remodel-remove/install new cabinets, complete removal of bathroom fixtures, no structural work, upgrade electrical to kitchen & bathroom. install new receptacles in rooms & install gfci protected receptacles. new drywall to bathroom & kitchen. new lights. no moving or adding walls | $36,000 |
| Feb 21, 2008 | Completed final sign-off Jul 2008 | 3795 20th St | kitchen and bathroom remodel on 2nd floor, addition of bathoom and laundry room on 2nd floorDetails
kitchen and bathroom remodel on 2nd floor, addition of bathoom and laundry room on 2nd floor | $45,000 |
| Nov 30, 2007 | Completed final sign-off Oct 2009 | 670 Paris St | rear addition and minor interior alterations. all in keeping with neighborhood contact. total of 3 bedrooms, 2.5 bathrooms. total of 2 story rear addition.Details
rear addition and minor interior alterations. all in keeping with neighborhood contact. total of 3 bedrooms, 2.5 bathrooms. total of 2 story rear addition. | $250,000 |
| Jan 31, 2007 | Expired or cancelled expired Feb 2013 | 3797 20th St | as per plans, kitchen/new laundry room and two bathroom remodeling. new plumbing and upgrade electrical to kitchen, bathrooms, laundry room, close up opening as per plans, add new wallsDetails
as per plans, kitchen/new laundry room and two bathroom remodeling. new plumbing and upgrade electrical to kitchen, bathrooms, laundry room, close up opening as per plans, add new walls | $39,000 |
| Mar 14, 2006 | Completed final sign-off Oct 2006 | 3220 17th St | kitchen and 1 bathrooms remodeling. install all new partition walls for master bathroom. add 1 bathroom to 1/f, repair dry wall, gas fire place line only.non bearing partition walls.Details
kitchen and 1 bathrooms remodeling. install all new partition walls for master bathroom. add 1 bathroom to 1/f, repair dry wall, gas fire place line only.non bearing partition walls. | $55,000 |
| Mar 14, 2006 | Completed final sign-off Oct 2006 | 3218 17th St | add bathroom to upper elevation, 2/f. new plumbing & electrical, gas fire place,line only. ref. to appl#200505273624Details
add bathroom to upper elevation, 2/f. new plumbing & electrical, gas fire place,line only. ref. to appl#200505273624 | $11,000 |
| May 27, 2005 | Completed final sign-off Apr 2006 | 3218 17th St | bathroom kitchen remodeling remove and replace all fixtures install new closet to main hallwayDetails
bathroom kitchen remodeling remove and replace all fixtures install new closet to main hallway | $42,000 |
| Mar 8, 2004 | Completed final sign-off Oct 2004 | 650 43rd Av | kitchen remodeling upgrade electrical water suply drywall insulation (kitchen) bathroom remove andDetails
kitchen remodeling upgrade electrical water suply drywall insulation (kitchen) bathroom remove and | $45,000 |
| Nov 19, 2003 | Completed final sign-off Feb 2004 | 6 Prospect Av | comply 20035436. kitchen & bathroom remodeling.Details
comply 20035436. kitchen & bathroom remodeling. | $12,000 |
| Aug 7, 2002 | Completed final sign-off Oct 2006 | 542 Staples Av | rev. appl#200206219668 additional minor work, add bathroom at closet area (bedroom), add support toDetails
rev. appl#200206219668 additional minor work, add bathroom at closet area (bedroom), add support to | $3,500 |
| Jun 21, 2002 | Completed final sign-off Oct 2006 | 542 Staples Av | remodel bath&kitchen-new furnace&water heater ,vinyl&wood window.dryrot repair to front stair &mud sDetails
remodel bath&kitchen-new furnace&water heater ,vinyl&wood window.dryrot repair to front stair &mud s | $120,000 |
| Mar 22, 2001 | Expired or cancelled expired Sep 2001 | 685 Peralta Av | remodeling kitchen & bath.Details
remodeling kitchen & bath. | $15,000 |
| Feb 14, 2000 | Completed final sign-off Aug 2000 | 1555 07th Av | bathroom remodelingDetails
bathroom remodeling |