Back to kitchen remodel contractors
Momentum Builders Sf Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2011 to Nov 2018
- Last 24 months
- 0 permits filed
15 permits since 2000: 9 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 2 never finaled. Typically 2 days from filing to permit and 225 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 16, 2017 | Completed final sign-off Jan 2018 | 138 Elsie St | master bath, fixtures and finishes in master bath; reconfigure kitchen , hall balth; install new tankless water heater. change out all can lites to led; retrofit bulbs, new hardwood, new appliances.Details
master bath, fixtures and finishes in master bath; reconfigure kitchen , hall balth; install new tankless water heater. change out all can lites to led; retrofit bulbs, new hardwood, new appliances. | $128,000 |
| May 15, 2014 | Never finaled issued May 2014, no final | 1057 Haight St | remove & replace kitchen cabinets, countertops, & appliances instlall 18 led lights in l.r. & kitchen, install gas line for range, install new subpanelDetails
remove & replace kitchen cabinets, countertops, & appliances instlall 18 led lights in l.r. & kitchen, install gas line for range, install new subpanel | $54,000 |
| Feb 27, 2014 | Never finaled issued Oct 2014, no final | 4 Miley St | horizontal rear expansion 2'-8.75" & new rear yard access stair. relocation of front entry door. renovation of (e) kitchen & 3 (e) bathrooms. renovation of 2 (e) interior stairs, new electrical & plumbing. new radiant floor heat, window & door replacements, new sprinklers under separate permit.Details
horizontal rear expansion 2'-8.75" & new rear yard access stair. relocation of front entry door. renovation of (e) kitchen & 3 (e) bathrooms. renovation of 2 (e) interior stairs, new electrical & plumbing. new radiant floor heat, window & door replacements, new sprinklers under separate permit. | $493,805 |
| Apr 15, 2011 | Completed final sign-off Nov 2011 | 1156 Vallejo St | non structural interior renovation to 2nd fl unit #200 of an (e) 4 story bldg. remodel kitchen, master bathroom, master bedroom, guest bedroom & flooring throughout unit. worek is on unit #200 only, 2nd floor. deferred permit on electrical & plumbing. window ufactor .40, lighting changes cec 150kDetails
non structural interior renovation to 2nd fl unit #200 of an (e) 4 story bldg. remodel kitchen, master bathroom, master bedroom, guest bedroom & flooring throughout unit. worek is on unit #200 only, 2nd floor. deferred permit on electrical & plumbing. window ufactor .40, lighting changes cec 150k | $89,000 |