Back to bathroom remodel contractors
Momentum Builders Sf Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2011 to Nov 2018
- Last 24 months
- 0 permits filed
15 permits since 2000: 9 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 6 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 225 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 13, 2018 | Completed final sign-off Jan 2022 | 527 20th Av | horizontal addition at rear. partially convert garage at 1st floor to habitable space. add 1 full bathroom, add 1 half bath. add family room/deckDetails
horizontal addition at rear. partially convert garage at 1st floor to habitable space. add 1 full bathroom, add 1 half bath. add family room/deck | $75,000 |
| Oct 1, 2018 | Never finaled issued Oct 2018, no final | 3789 Fillmore St | bathroom remodel, fixts & finishes. replace 4 can lites, vanity, floor & wall tile, shower enclosure. 7x6 high efficacy & vacancy sensor. n/a for maher.Details
bathroom remodel, fixts & finishes. replace 4 can lites, vanity, floor & wall tile, shower enclosure. 7x6 high efficacy & vacancy sensor. n/a for maher. | $25,000 |
| Jan 16, 2018 | Never finaled issued Feb 2018, no final | 3743 Fillmore St | remodel of guest bathroom, addition of closet in guest bedroom, remodeled coat closet. area of work 70 sq ft. no structural work and no exterior work. n/a for maherDetails
remodel of guest bathroom, addition of closet in guest bedroom, remodeled coat closet. area of work 70 sq ft. no structural work and no exterior work. n/a for maher | $6,370 |
| May 16, 2017 | Completed final sign-off Jan 2018 | 138 Elsie St | master bath, fixtures and finishes in master bath; reconfigure kitchen , hall balth; install new tankless water heater. change out all can lites to led; retrofit bulbs, new hardwood, new appliances.Details
master bath, fixtures and finishes in master bath; reconfigure kitchen , hall balth; install new tankless water heater. change out all can lites to led; retrofit bulbs, new hardwood, new appliances. | $128,000 |
| Feb 13, 2017 | Completed final sign-off Feb 2018 | 3789 Fillmore St | #1 - remove & replace water damaged plaster with sheetrock. install ryfiant heated floor throughout fixtures & finish in master bath. relocate toilet ot old shower area, install new 125 amp subpanel, install 11 led can lites, 12 outlets, hardwood flr. n/a maher ordinanceDetails
#1 - remove & replace water damaged plaster with sheetrock. install ryfiant heated floor throughout fixtures & finish in master bath. relocate toilet ot old shower area, install new 125 amp subpanel, install 11 led can lites, 12 outlets, hardwood flr. n/a maher ordinance | $31,000 |
| Nov 21, 2016 | Completed final sign-off Apr 2017 | 1438 Green St | suite 2d: new fixtures and finishes in 2 bathrooms, 3 new led can lights in master bath. n/a maherDetails
suite 2d: new fixtures and finishes in 2 bathrooms, 3 new led can lights in master bath. n/a maher | $80,000 |
| Feb 27, 2014 | Never finaled issued Oct 2014, no final | 4 Miley St | horizontal rear expansion 2'-8.75" & new rear yard access stair. relocation of front entry door. renovation of (e) kitchen & 3 (e) bathrooms. renovation of 2 (e) interior stairs, new electrical & plumbing. new radiant floor heat, window & door replacements, new sprinklers under separate permit.Details
horizontal rear expansion 2'-8.75" & new rear yard access stair. relocation of front entry door. renovation of (e) kitchen & 3 (e) bathrooms. renovation of 2 (e) interior stairs, new electrical & plumbing. new radiant floor heat, window & door replacements, new sprinklers under separate permit. | $493,805 |
| May 9, 2013 | Completed final sign-off Jul 2013 | 1877 Green St | replace fixtures and finishes in bath, install new tile floor and tub/shower surround, install new vanity all in same place, bath remodel in kind.Details
replace fixtures and finishes in bath, install new tile floor and tub/shower surround, install new vanity all in same place, bath remodel in kind. | $10,000 |
| Feb 8, 2012 | Expired or cancelled expired Oct 2015 | 119 Parnassus Av | reconfigure extg bathroom. install new windows in bath area. install new lights in bath area. install new plumbing fixture. install new tile surround and tile floor.Details
reconfigure extg bathroom. install new windows in bath area. install new lights in bath area. install new plumbing fixture. install new tile surround and tile floor. | $25,000 |
| Apr 15, 2011 | Completed final sign-off Nov 2011 | 1156 Vallejo St | non structural interior renovation to 2nd fl unit #200 of an (e) 4 story bldg. remodel kitchen, master bathroom, master bedroom, guest bedroom & flooring throughout unit. worek is on unit #200 only, 2nd floor. deferred permit on electrical & plumbing. window ufactor .40, lighting changes cec 150kDetails
non structural interior renovation to 2nd fl unit #200 of an (e) 4 story bldg. remodel kitchen, master bathroom, master bedroom, guest bedroom & flooring throughout unit. worek is on unit #200 only, 2nd floor. deferred permit on electrical & plumbing. window ufactor .40, lighting changes cec 150k | $89,000 |