Block 0438A, lot 035
3789 Fillmore St
- City’s use
- Single Family Residential
- Built
- 1929
- Stories
- 3
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 1,216 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 8, 2026 | In progress issued Jun 2026 | 3789 Fillmore St | L Briseno Construction | whole bldg: replace 45 windows like for like openings, street facing, dryrot and stucco repairs street facing. proposed aluminum to match design and operation. fenestration max. u-factor = 0.28Details
whole bldg: replace 45 windows like for like openings, street facing, dryrot and stucco repairs street facing. proposed aluminum to match design and operation. fenestration max. u-factor = 0.28 | $90,000 |
| Aug 18, 2025 | Expired or cancelled cancelled Apr 2026 | 3789 Fillmore St | Handyman Heroes Inc. | common area: remove stucco and underlayment across multiples areas on the entire side of building, on retiro way side, examine extent of dry rot (exporatory) street facing.Details
common area: remove stucco and underlayment across multiples areas on the entire side of building, on retiro way side, examine extent of dry rot (exporatory) street facing. | $13,000 |
| Oct 1, 2018 | Never finaled issued Oct 2018, no final | 3789 Fillmore St | Momentum Builders Sf Inc | bathroom remodel, fixts & finishes. replace 4 can lites, vanity, floor & wall tile, shower enclosure. 7x6 high efficacy & vacancy sensor. n/a for maher.Details
bathroom remodel, fixts & finishes. replace 4 can lites, vanity, floor & wall tile, shower enclosure. 7x6 high efficacy & vacancy sensor. n/a for maher. | $25,000 |
| Feb 13, 2017 | Completed final sign-off Feb 2018 | 3789 Fillmore St | Momentum Builders Sf Inc | #1 - remove & replace water damaged plaster with sheetrock. install ryfiant heated floor throughout fixtures & finish in master bath. relocate toilet ot old shower area, install new 125 amp subpanel, install 11 led can lites, 12 outlets, hardwood flr. n/a maher ordinanceDetails
#1 - remove & replace water damaged plaster with sheetrock. install ryfiant heated floor throughout fixtures & finish in master bath. relocate toilet ot old shower area, install new 125 amp subpanel, install 11 led can lites, 12 outlets, hardwood flr. n/a maher ordinance | $31,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Momentum Builders Sf Inc (2), Handyman Heroes Inc., L Briseno Construction
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.