Molloy Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2016
- Last 24 months
- 0 permits filed
12 permits since 2000: 9 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 expired or cancelled. Typically 210 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 8, 2007 | Expired or cancelled expired Mar 2010 | 2270 14th Av | remove & replace existing front ent. stairs. remove & replace ex. driveway & sidewalk. replace decor panels at risers.Details
remove & replace existing front ent. stairs. remove & replace ex. driveway & sidewalk. replace decor panels at risers. | $10,000 |
| Dec 20, 2006 | Expired or cancelled expired Jun 2009 | 40 Juanita Wy | add one story on top of (e) 2 story building. renovate (e) ground floor & 1st floor. add a new wood stair from 3rd floor down to rear yard for 2nd mean of egress.Details
add one story on top of (e) 2 story building. renovate (e) ground floor & 1st floor. add a new wood stair from 3rd floor down to rear yard for 2nd mean of egress. | $65,000 |