Back to kitchen remodel contractors
Molloy Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2016
- Last 24 months
- 0 permits filed
12 permits since 2000: 9 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 219 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2011 | Completed final sign-off Oct 2012 | 1545 Broadway | remove and replace in kind: kitchen cabinets, toilets, sinks, and electgrical outlets. no change on walls and openings.Details
remove and replace in kind: kitchen cabinets, toilets, sinks, and electgrical outlets. no change on walls and openings. | $20,000 |
| Dec 29, 2010 | Completed final sign-off Aug 2011 | 17 Juanita Wy | revision to pa# 2010.10.14.2982. for kitchen layout & relocate skylites. renovate (e) bathroom to full bath at ground fl incl. remove raised fl and replace concrete slab with new one at entertainment rm and laundry area.Details
revision to pa# 2010.10.14.2982. for kitchen layout & relocate skylites. renovate (e) bathroom to full bath at ground fl incl. remove raised fl and replace concrete slab with new one at entertainment rm and laundry area. | $6,000 |
| Oct 14, 2010 | Completed final sign-off Aug 2011 | 17 Juanita Wy | enclose extg atrium and cover with new roof ceiling joists and skylites. renovation extg kitchen and remove breakfast room, combine kitchen, breakfast room & atrium to become new kitchen area. reinforce extg 2nd floor joist at atruim location. add new skylites over kitchen and hallway.Details
enclose extg atrium and cover with new roof ceiling joists and skylites. renovation extg kitchen and remove breakfast room, combine kitchen, breakfast room & atrium to become new kitchen area. reinforce extg 2nd floor joist at atruim location. add new skylites over kitchen and hallway. | $18,000 |
| Jul 12, 2007 | Completed final sign-off Oct 2007 | 1837 21st Av | new kitchen cabinets, 50% lighting to be fluorescentDetails
new kitchen cabinets, 50% lighting to be fluorescent | $12,000 |
| Dec 30, 2005 | Completed final sign-off May 2006 | 1545 Broadway | new cabinets, new sink in kitchen and bathroom, new stove and microwave ovenDetails
new cabinets, new sink in kitchen and bathroom, new stove and microwave oven | $28,000 |