Back to kitchen remodel contractors
Modern Design Construction
- Based in
- Hayward
- On San Francisco permits
- Feb 2005 to Oct 2011
- Last 24 months
- 0 permits filed
11 permits since 2000: 10 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 6 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 20, 2008 | Completed final sign-off Jul 2008 | 231 Holloway Av | remodel (e) toilet room on 1st fl. bathroom & kitchen (2nd fl. replace existing front stairs, replace (e) rear stair. repair foundation. (e) front stairs are linear, replace back stairs are "l" sheaped plan. the rear (n) stairs has a new deck.Details
remodel (e) toilet room on 1st fl. bathroom & kitchen (2nd fl. replace existing front stairs, replace (e) rear stair. repair foundation. (e) front stairs are linear, replace back stairs are "l" sheaped plan. the rear (n) stairs has a new deck. | $20,000 |