Back to kitchen remodel contractors
Mo Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Aug 2024
- Last 24 months
- 0 permits filed
20 permits since 2000: 13 completed, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 3 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 365 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 13, 2024 | Completed final sign-off Jan 2025 | 458 26th Av | sheetrck interior wall,insulation on exterior and ceiling, replace broken cast iron pipes, install (n) copper water pipes, replace electric wires, outlet boxes, replace 14 windows not visible from the street u.30ma and interior doors, repair roof leaking, replace heater. 1 kitchen and 1 bath remodelDetails
sheetrck interior wall,insulation on exterior and ceiling, replace broken cast iron pipes, install (n) copper water pipes, replace electric wires, outlet boxes, replace 14 windows not visible from the street u.30ma and interior doors, repair roof leaking, replace heater. 1 kitchen and 1 bath remodel | $50,000 |
| Jun 3, 2022 | Completed final sign-off May 2025 | 1571 25th Av | interior remodel: 1st fl add 2 bedrooms, 1 media room, 1 full bathroom. 2nd fl remodel kitchen and bathrooms, remove (e) light well at neighbir;s black wall & add skylightsDetails
interior remodel: 1st fl add 2 bedrooms, 1 media room, 1 full bathroom. 2nd fl remodel kitchen and bathrooms, remove (e) light well at neighbir;s black wall & add skylights | $80,000 |
| Mar 15, 2022 | Never finaled issued Mar 2022, no final | 1535 31st Av | replace kitchen cabinets, replace bathroom window (non street visible), replace furnace, replace electrical panel box, paint, repair leaking pipes in garage. no work in front.Details
replace kitchen cabinets, replace bathroom window (non street visible), replace furnace, replace electrical panel box, paint, repair leaking pipes in garage. no work in front. | $25,000 |
| Mar 1, 2010 | Completed final sign-off Mar 2011 | 463 16th Av | retile kitchen area =8' x10' & bathroom area = 7' x8' : repalce cabients, faucets. isntall a sub-panel at 2nd floor, renew bedroom plpugs, repalce brocken 4" cast iron pipe, repair dryrot, erplace a furnace, repair brocken sheetrock approx 400 sq ft.Details
retile kitchen area =8' x10' & bathroom area = 7' x8' : repalce cabients, faucets. isntall a sub-panel at 2nd floor, renew bedroom plpugs, repalce brocken 4" cast iron pipe, repair dryrot, erplace a furnace, repair brocken sheetrock approx 400 sq ft. | $12,000 |
| Aug 2, 2000 | Expired or cancelled expired Apr 2001 | 1366 23rd Av | remodel kitchen & bath,replace cabients, floor, tub, toilet,sink,replace wall tile & floor tileDetails
remodel kitchen & bath,replace cabients, floor, tub, toilet,sink,replace wall tile & floor tile | $4,000 |