Back to bathroom remodel contractors
Mo Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Aug 2024
- Last 24 months
- 0 permits filed
20 permits since 2000: 13 completed, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 9 completed, 1 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 193 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2024 | Completed final sign-off Jan 2025 | 458 26th Av | rev 202405132010: add new bathroom on 1/f. (e) room to bedroom.Details
rev 202405132010: add new bathroom on 1/f. (e) room to bedroom. | $25,000 |
| May 13, 2024 | Completed final sign-off Jan 2025 | 458 26th Av | sheetrck interior wall,insulation on exterior and ceiling, replace broken cast iron pipes, install (n) copper water pipes, replace electric wires, outlet boxes, replace 14 windows not visible from the street u.30ma and interior doors, repair roof leaking, replace heater. 1 kitchen and 1 bath remodelDetails
sheetrck interior wall,insulation on exterior and ceiling, replace broken cast iron pipes, install (n) copper water pipes, replace electric wires, outlet boxes, replace 14 windows not visible from the street u.30ma and interior doors, repair roof leaking, replace heater. 1 kitchen and 1 bath remodel | $50,000 |
| Jul 7, 2023 | Completed final sign-off Jan 2024 | 1535 31st Av | 1st flr: add 1-bedroom, 1-family room, 1-full bath, wet bar, and office per plan.Details
1st flr: add 1-bedroom, 1-family room, 1-full bath, wet bar, and office per plan. | $100,000 |
| Jun 3, 2022 | Completed final sign-off May 2025 | 1571 25th Av | interior remodel: 1st fl add 2 bedrooms, 1 media room, 1 full bathroom. 2nd fl remodel kitchen and bathrooms, remove (e) light well at neighbir;s black wall & add skylightsDetails
interior remodel: 1st fl add 2 bedrooms, 1 media room, 1 full bathroom. 2nd fl remodel kitchen and bathrooms, remove (e) light well at neighbir;s black wall & add skylights | $80,000 |
| Mar 15, 2022 | Never finaled issued Mar 2022, no final | 1535 31st Av | replace kitchen cabinets, replace bathroom window (non street visible), replace furnace, replace electrical panel box, paint, repair leaking pipes in garage. no work in front.Details
replace kitchen cabinets, replace bathroom window (non street visible), replace furnace, replace electrical panel box, paint, repair leaking pipes in garage. no work in front. | $25,000 |
| Feb 27, 2020 | Completed final sign-off Sep 2020 | 1301 29th Av | 1st floor: add game room and full bath. repair cracks in stucco and replace damaged roof tiles. replace window in kind, aluminum wood clad.Details
1st floor: add game room and full bath. repair cracks in stucco and replace damaged roof tiles. replace window in kind, aluminum wood clad. | $15,000 |
| Mar 17, 2014 | Completed final sign-off Jul 2014 | 2172 16th Av | first floor remodeling of sfd. add one bedroom and one bathroom (+ or - 196 sq ft). add storage (+ or - 421 sq ft)Details
first floor remodeling of sfd. add one bedroom and one bathroom (+ or - 196 sq ft). add storage (+ or - 421 sq ft) | $35,000 |
| Jul 11, 2013 | Completed final sign-off Nov 2013 | 15 Merced Av | ground floor remodel. add 3 bedrooms 2 full baths, office and family room. replace e windows at ground floorDetails
ground floor remodel. add 3 bedrooms 2 full baths, office and family room. replace e windows at ground floor | $60,000 |
| Mar 1, 2010 | Completed final sign-off Mar 2011 | 463 16th Av | retile kitchen area =8' x10' & bathroom area = 7' x8' : repalce cabients, faucets. isntall a sub-panel at 2nd floor, renew bedroom plpugs, repalce brocken 4" cast iron pipe, repair dryrot, erplace a furnace, repair brocken sheetrock approx 400 sq ft.Details
retile kitchen area =8' x10' & bathroom area = 7' x8' : repalce cabients, faucets. isntall a sub-panel at 2nd floor, renew bedroom plpugs, repalce brocken 4" cast iron pipe, repair dryrot, erplace a furnace, repair brocken sheetrock approx 400 sq ft. | $12,000 |
| Aug 22, 2006 | Completed final sign-off Jun 2007 | 2162 27th Av | proposed alteration to existing g/f install bedroom, family room, bathroom, laundry room @ g/f.Details
proposed alteration to existing g/f install bedroom, family room, bathroom, laundry room @ g/f. | $40,000 |
| Aug 2, 2000 | Expired or cancelled expired Apr 2001 | 1366 23rd Av | remodel kitchen & bath,replace cabients, floor, tub, toilet,sink,replace wall tile & floor tileDetails
remodel kitchen & bath,replace cabients, floor, tub, toilet,sink,replace wall tile & floor tile | $4,000 |