Back to kitchen remodel contractors
Mizen Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2015 to Jul 2026
- Last 24 months
- 16 permits filed
79 permits since 2000: 65 completed, 5 in progress, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 5 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
24 kitchen remodel permits: 18 completed, 3 in progress, 2 never finaled, 1 expired or cancelled. Typically 35 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Aug 2026 | 604 Oak St | project generally consists of a kitchen and bath remodel of a condo flat. switch kitchen and dining room locations, relocate bath location, reconfig closet and bedrm walls at bedrm 1, new appliances, lighting, plumbing fixtures, 2 new skylights.Details
project generally consists of a kitchen and bath remodel of a condo flat. switch kitchen and dining room locations, relocate bath location, reconfig closet and bedrm walls at bedrm 1, new appliances, lighting, plumbing fixtures, 2 new skylights. | $75,000 |
| Apr 16, 2026 | Completed final sign-off May 2026 | 229 09th St | new kitchen for bakery and coffee shop, new equipment, finishes and fixtures, no structural, no exterior work. revision to 202507110609Details
new kitchen for bakery and coffee shop, new equipment, finishes and fixtures, no structural, no exterior work. revision to 202507110609 | |
| Feb 20, 2026 | In progress issued Jun 2026 | 25 Forest Side Av | rear 3rd story attic conversion for primary suite.living,dining,kitchen layout at the 2/f.alteration of the (e) stair to a code-compliant stair at all levels.removal of pre-existing illegal kitchen at the lower level family room.kitchen area to be replaced with a wet bar.deck guardrail replacementDetails
rear 3rd story attic conversion for primary suite.living,dining,kitchen layout at the 2/f.alteration of the (e) stair to a code-compliant stair at all levels.removal of pre-existing illegal kitchen at the lower level family room.kitchen area to be replaced with a wet bar.deck guardrail replacement | $700,000 |
| Jan 27, 2026 | In progress issued Apr 2026 | 212 Valley St | alterations to e condo unit in a 2 unit residential building. the work consists of plan layout adjustments for an open living/dining/kitchen and adjusted bedroom wing, replace exterior windows in kind,addition of 2 n skylights, new plumbing/elec fixturesDetails
alterations to e condo unit in a 2 unit residential building. the work consists of plan layout adjustments for an open living/dining/kitchen and adjusted bedroom wing, replace exterior windows in kind,addition of 2 n skylights, new plumbing/elec fixtures | $200,000 |
| Jul 11, 2025 | Completed final sign-off May 2026 | 229 09th St | t.i. new kitchen for bakery and coffee shop. new equipment, finishes and fixtures. no structural or exterior work. mep deferred.Details
t.i. new kitchen for bakery and coffee shop. new equipment, finishes and fixtures. no structural or exterior work. mep deferred. | $60,000 |
| Jun 5, 2025 | Completed final sign-off May 2026 | 1312 Cole St | interior/ rear scope not visible from st: remodel 2 kitchens, 2 bathrooms for both units (1 kitchen & 1 bath in each unit). upper unit: add a bathroom. install new windows & doors in the rear. remove rear exteior stairs not required for egressDetails
interior/ rear scope not visible from st: remodel 2 kitchens, 2 bathrooms for both units (1 kitchen & 1 bath in each unit). upper unit: add a bathroom. install new windows & doors in the rear. remove rear exteior stairs not required for egress | $175,000 |
| Apr 15, 2025 | Completed final sign-off Nov 2025 | 475 Valley St | remove bathroom on 2nd fl; relocate kitchen, alter window at rear, new bathroom on 3rd fl. add 3 skylights.Details
remove bathroom on 2nd fl; relocate kitchen, alter window at rear, new bathroom on 3rd fl. add 3 skylights. | $125,000 |
| Aug 9, 2024 | Completed final sign-off Sep 2025 | 679 Chenery St | commercial tenant improvement-interior remodel of ground fl. shell space for restaurant use: remove single bathroom non-bearin wall partitions. accessibility improvements, new lighting, new finishes, new kitchen equipment, no modification to existing envelope.Details
commercial tenant improvement-interior remodel of ground fl. shell space for restaurant use: remove single bathroom non-bearin wall partitions. accessibility improvements, new lighting, new finishes, new kitchen equipment, no modification to existing envelope. | $450,000 |
| Oct 20, 2022 | Completed final sign-off Oct 2023 | 48 Navajo Av | kitchen renovation,new bathroom at existing lightwell, 3 new skylights.enclosure of garage from remainder of lower level.Details
kitchen renovation,new bathroom at existing lightwell, 3 new skylights.enclosure of garage from remainder of lower level. | $148,000 |
| Oct 18, 2022 | Completed final sign-off May 2023 | 1446 10th Av | convert 376sf of garage space to living space connected to 1446 10th ave with new internal stair, new bathroom in space, and 2 windows replace. remodel existing kitchen and bathroom in 1446.Details
convert 376sf of garage space to living space connected to 1446 10th ave with new internal stair, new bathroom in space, and 2 windows replace. remodel existing kitchen and bathroom in 1446. | $300,000 |
| Jul 21, 2022 | Completed final sign-off Apr 2023 | 1571 Waller St | interior residential renovations to include kitchen & bath. improvements & (n) wdws to replace (e) street facing.Details
interior residential renovations to include kitchen & bath. improvements & (n) wdws to replace (e) street facing. | $40,000 |
| Jan 5, 2022 | Completed final sign-off Nov 2022 | 569 03rd Av | interior remodel within (e) upper unit. remodel (e) kitchen & bathroom. add new bathroom & side window. new skylights. no work on lower unit. no added sqft. no change to envelope & ext facade.Details
interior remodel within (e) upper unit. remodel (e) kitchen & bathroom. add new bathroom & side window. new skylights. no work on lower unit. no added sqft. no change to envelope & ext facade. | $250,000 |
| Jul 7, 2020 | Completed final sign-off Nov 2020 | 172 Divisadero St | in kind kitchen replacement and canned lighting/electrical. work at fire place.Details
in kind kitchen replacement and canned lighting/electrical. work at fire place. | $75,000 |
| Jun 25, 2020 | Completed final sign-off Nov 2020 | 728 27th St | remodel kitchen in kind on 2nd floor. bathroom remodel w/ new adjacent laundry room @ 1st floor. voluntary seismic reinforcement @ 1st floor. all proposed construction within existing building envelope.Details
remodel kitchen in kind on 2nd floor. bathroom remodel w/ new adjacent laundry room @ 1st floor. voluntary seismic reinforcement @ 1st floor. all proposed construction within existing building envelope. | $50,000 |
| May 1, 2019 | Completed final sign-off Mar 2020 | 764 44th Av | interior remodel of (e) bldg with fill-in on underside of (e) bldg volume. rooms down 1st fl fam rm, sitting rm, bdr, bathroom & laundry.2nd fl kitchen, bath remodel, remove intercal stair @ south wall. 3 windows in kind, 1 door filled in @ east facade w/ new window.Details
interior remodel of (e) bldg with fill-in on underside of (e) bldg volume. rooms down 1st fl fam rm, sitting rm, bdr, bathroom & laundry.2nd fl kitchen, bath remodel, remove intercal stair @ south wall. 3 windows in kind, 1 door filled in @ east facade w/ new window. | $250,000 |
| Jan 31, 2019 | Completed final sign-off Jun 2019 | 158 Beulah St | interior remodel of fourth floor unit: remodel (e) bath, new master bath & closet, new laundry, new flooring to replace (e) millwork @ kitchen & living, (2) new skylightsDetails
interior remodel of fourth floor unit: remodel (e) bath, new master bath & closet, new laundry, new flooring to replace (e) millwork @ kitchen & living, (2) new skylights | $96,000 |
| Jul 16, 2018 | Completed final sign-off Oct 2018 | 11 Kronquist Ct | kitchen remodel: replace in-kind, rar/ new cabinets, new countertop, new fixtures & appliances.Details
kitchen remodel: replace in-kind, rar/ new cabinets, new countertop, new fixtures & appliances. | $12,000 |
| Jul 28, 2016 | Never finaled issued Feb 2017, no final | 1530 11th Av | remodel of (e) kitchen, new deck, remodel of (e) 2nd floor bath.Details
remodel of (e) kitchen, new deck, remodel of (e) 2nd floor bath. | $30,000 |
| Jul 27, 2016 | Completed final sign-off Feb 2017 | 1050 Castro St | remodel single family dwelling: remodel kitchen and bathroom. add new living room, bedrooms, bathrooms. new living space added at first floor level.Details
remodel single family dwelling: remodel kitchen and bathroom. add new living room, bedrooms, bathrooms. new living space added at first floor level. | $320,000 |
| Jan 11, 2016 | Completed final sign-off Jun 2016 | 318 Walnut St | interior remodel: 1st floor powder room and kitchen. 2nd floor: master bedroom closet and bathroom. 3rd floor: add closet to bedroom #3.Details
interior remodel: 1st floor powder room and kitchen. 2nd floor: master bedroom closet and bathroom. 3rd floor: add closet to bedroom #3. | $100,000 |
| Dec 17, 2015 | Completed final sign-off Jul 2016 | 1448 10th Av | remodel of existing 3rd floor unit. provide new master bathroom. provide new kitchen. extend landing for egress stair. seismic under seperate permit.Details
remodel of existing 3rd floor unit. provide new master bathroom. provide new kitchen. extend landing for egress stair. seismic under seperate permit. | $130,000 |
| Nov 17, 2015 | Expired or cancelled cancelled Aug 2016 | 1448 10th Av | kitchen and bathroom remodel, in-kind. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
kitchen and bathroom remodel, in-kind. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $20,000 |
| Sep 8, 2015 | Never finaled issued Sep 2015, no final | 3865 21st St | replace (e) wall with beam and replace (e) kitchen cabinets.Details
replace (e) wall with beam and replace (e) kitchen cabinets. | $75,000 |
| Apr 20, 2015 | Completed final sign-off Nov 2019 | 335 27th St | add new 3rd floor with flat roof to (e) 2 story. new floor to consist of kitchen, dining & living room. expand & remodel 2nd floor to consist of 3 bedrooms. expand & remodel 1st floor to consist of family room & office.Details
add new 3rd floor with flat roof to (e) 2 story. new floor to consist of kitchen, dining & living room. expand & remodel 2nd floor to consist of 3 bedrooms. expand & remodel 1st floor to consist of family room & office. | $300,000 |