Back to bathroom remodel contractors
Mizen Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2015 to Jul 2026
- Last 24 months
- 16 permits filed
79 permits since 2000: 65 completed, 5 in progress, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 5 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
31 bathroom remodel permits: 26 completed, 1 in progress, 3 never finaled, 1 expired or cancelled. Typically 6 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Aug 2026 | 604 Oak St | project generally consists of a kitchen and bath remodel of a condo flat. switch kitchen and dining room locations, relocate bath location, reconfig closet and bedrm walls at bedrm 1, new appliances, lighting, plumbing fixtures, 2 new skylights.Details
project generally consists of a kitchen and bath remodel of a condo flat. switch kitchen and dining room locations, relocate bath location, reconfig closet and bedrm walls at bedrm 1, new appliances, lighting, plumbing fixtures, 2 new skylights. | $75,000 |
| Jun 15, 2026 | Completed final sign-off Sep 2026 | 147 Stillings Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $38,000 |
| Oct 7, 2025 | Completed final sign-off May 2026 | 2781 Clay St | in-kind remodeling of 4 bathroom(s) in 1st fl, 2nd fl, 3rd fl with 2 shower pan(s).Details
in-kind remodeling of 4 bathroom(s) in 1st fl, 2nd fl, 3rd fl with 2 shower pan(s). | $50,000 |
| Jun 5, 2025 | Completed final sign-off May 2026 | 1312 Cole St | interior/ rear scope not visible from st: remodel 2 kitchens, 2 bathrooms for both units (1 kitchen & 1 bath in each unit). upper unit: add a bathroom. install new windows & doors in the rear. remove rear exteior stairs not required for egressDetails
interior/ rear scope not visible from st: remodel 2 kitchens, 2 bathrooms for both units (1 kitchen & 1 bath in each unit). upper unit: add a bathroom. install new windows & doors in the rear. remove rear exteior stairs not required for egress | $175,000 |
| Apr 15, 2025 | Completed final sign-off Nov 2025 | 475 Valley St | remove bathroom on 2nd fl; relocate kitchen, alter window at rear, new bathroom on 3rd fl. add 3 skylights.Details
remove bathroom on 2nd fl; relocate kitchen, alter window at rear, new bathroom on 3rd fl. add 3 skylights. | $125,000 |
| Aug 9, 2024 | Completed final sign-off Sep 2025 | 679 Chenery St | commercial tenant improvement-interior remodel of ground fl. shell space for restaurant use: remove single bathroom non-bearin wall partitions. accessibility improvements, new lighting, new finishes, new kitchen equipment, no modification to existing envelope.Details
commercial tenant improvement-interior remodel of ground fl. shell space for restaurant use: remove single bathroom non-bearin wall partitions. accessibility improvements, new lighting, new finishes, new kitchen equipment, no modification to existing envelope. | $450,000 |
| Jan 11, 2024 | Completed final sign-off Jul 2024 | 660 Myra Wy | replacing windows at main bathroom, lower bedroom, bathroom. replace water and termite damaged framing and sheathing. replace street balcony railing. ref app# 202307132053.Details
replacing windows at main bathroom, lower bedroom, bathroom. replace water and termite damaged framing and sheathing. replace street balcony railing. ref app# 202307132053. | $250,000 |
| Oct 20, 2022 | Completed final sign-off Oct 2023 | 48 Navajo Av | kitchen renovation,new bathroom at existing lightwell, 3 new skylights.enclosure of garage from remainder of lower level.Details
kitchen renovation,new bathroom at existing lightwell, 3 new skylights.enclosure of garage from remainder of lower level. | $148,000 |
| Oct 18, 2022 | Completed final sign-off May 2023 | 1446 10th Av | convert 376sf of garage space to living space connected to 1446 10th ave with new internal stair, new bathroom in space, and 2 windows replace. remodel existing kitchen and bathroom in 1446.Details
convert 376sf of garage space to living space connected to 1446 10th ave with new internal stair, new bathroom in space, and 2 windows replace. remodel existing kitchen and bathroom in 1446. | $300,000 |
| Jul 21, 2022 | Completed final sign-off Apr 2023 | 1571 Waller St | interior residential renovations to include kitchen & bath. improvements & (n) wdws to replace (e) street facing.Details
interior residential renovations to include kitchen & bath. improvements & (n) wdws to replace (e) street facing. | $40,000 |
| Jan 5, 2022 | Completed final sign-off Nov 2022 | 569 03rd Av | interior remodel within (e) upper unit. remodel (e) kitchen & bathroom. add new bathroom & side window. new skylights. no work on lower unit. no added sqft. no change to envelope & ext facade.Details
interior remodel within (e) upper unit. remodel (e) kitchen & bathroom. add new bathroom & side window. new skylights. no work on lower unit. no added sqft. no change to envelope & ext facade. | $250,000 |
| Jun 25, 2020 | Completed final sign-off Nov 2020 | 728 27th St | remodel kitchen in kind on 2nd floor. bathroom remodel w/ new adjacent laundry room @ 1st floor. voluntary seismic reinforcement @ 1st floor. all proposed construction within existing building envelope.Details
remodel kitchen in kind on 2nd floor. bathroom remodel w/ new adjacent laundry room @ 1st floor. voluntary seismic reinforcement @ 1st floor. all proposed construction within existing building envelope. | $50,000 |
| Jun 5, 2019 | Never finaled issued Sep 2021, no final | 36 Delano Av | (n) (3) story rear addition: (n) 1st fl family room, laundry, bath; (n) 2nd fl breakfast nook, stair; (n) 3rd fl master suite. (n) roof dormer, (n) rear deck. no change to front facadeDetails
(n) (3) story rear addition: (n) 1st fl family room, laundry, bath; (n) 2nd fl breakfast nook, stair; (n) 3rd fl master suite. (n) roof dormer, (n) rear deck. no change to front facade | $200,000 |
| May 24, 2019 | Never finaled issued May 2019, no final | 345 Oxford St | replace in kind existing bathroom fixtures and tiles. 5'x8'.Details
replace in kind existing bathroom fixtures and tiles. 5'x8'. | $12,000 |
| May 1, 2019 | Completed final sign-off Mar 2020 | 764 44th Av | interior remodel of (e) bldg with fill-in on underside of (e) bldg volume. rooms down 1st fl fam rm, sitting rm, bdr, bathroom & laundry.2nd fl kitchen, bath remodel, remove intercal stair @ south wall. 3 windows in kind, 1 door filled in @ east facade w/ new window.Details
interior remodel of (e) bldg with fill-in on underside of (e) bldg volume. rooms down 1st fl fam rm, sitting rm, bdr, bathroom & laundry.2nd fl kitchen, bath remodel, remove intercal stair @ south wall. 3 windows in kind, 1 door filled in @ east facade w/ new window. | $250,000 |
| Jan 31, 2019 | Completed final sign-off Jun 2019 | 158 Beulah St | interior remodel of fourth floor unit: remodel (e) bath, new master bath & closet, new laundry, new flooring to replace (e) millwork @ kitchen & living, (2) new skylightsDetails
interior remodel of fourth floor unit: remodel (e) bath, new master bath & closet, new laundry, new flooring to replace (e) millwork @ kitchen & living, (2) new skylights | $96,000 |
| Jul 27, 2018 | Completed final sign-off Oct 2018 | 229 Bonview St | remodel bathroom, replace in-kind, update all plumbing as needed, 5'x8'Details
remodel bathroom, replace in-kind, update all plumbing as needed, 5'x8' | $14,000 |
| Jun 12, 2018 | Completed final sign-off Sep 2018 | 1315 Cole St | remodel bathrooms at interior of unit 1315 2nd fl remove (e) window on property line, install new fixed skylight at roofDetails
remodel bathrooms at interior of unit 1315 2nd fl remove (e) window on property line, install new fixed skylight at roof | $60,000 |
| Mar 12, 2018 | Completed final sign-off Jun 2018 | 61 Cragmont Av | new ground floor bathroom & partition. restoration of existing window to be removed, restored and reinstalled.Details
new ground floor bathroom & partition. restoration of existing window to be removed, restored and reinstalled. | $18,500 |
| Feb 7, 2018 | Completed final sign-off May 2018 | 3425 Moraga St | remodel of ground floor living spaces. new bedroom, closet and bath.Details
remodel of ground floor living spaces. new bedroom, closet and bath. | $35,000 |
| Jul 31, 2017 | Completed final sign-off May 2019 | 117 College Av | remodel of (e) sfr include minor addition on both floors in rear of building (include in-fill under (e) 2nd floor overhang) infill of (e) lightwell on west pl. creation of new 80 sq.ft. deck @ rear of 2nd floor & re-configured stairs down to rear yard. misc. remodel 2 bathrooms. create 1 new bedroomDetails
remodel of (e) sfr include minor addition on both floors in rear of building (include in-fill under (e) 2nd floor overhang) infill of (e) lightwell on west pl. creation of new 80 sq.ft. deck @ rear of 2nd floor & re-configured stairs down to rear yard. misc. remodel 2 bathrooms. create 1 new bedroom | $76,000 |
| Mar 8, 2017 | Completed final sign-off May 2017 | 607 Los Palmos Dr | bathroom remodel. remove old tiles and lath and plaster. replace all fixtures, stay in same locationDetails
bathroom remodel. remove old tiles and lath and plaster. replace all fixtures, stay in same location | $30,000 |
| Aug 5, 2016 | Completed final sign-off May 2017 | 607 Los Palmos Dr | bathroom remodel; demo to studs and re-sheetrock and tiles; no removal of walls.Details
bathroom remodel; demo to studs and re-sheetrock and tiles; no removal of walls. | $15,000 |
| Jul 28, 2016 | Never finaled issued Feb 2017, no final | 1530 11th Av | remodel of (e) kitchen, new deck, remodel of (e) 2nd floor bath.Details
remodel of (e) kitchen, new deck, remodel of (e) 2nd floor bath. | $30,000 |
| Jul 27, 2016 | Completed final sign-off Feb 2017 | 1050 Castro St | remodel single family dwelling: remodel kitchen and bathroom. add new living room, bedrooms, bathrooms. new living space added at first floor level.Details
remodel single family dwelling: remodel kitchen and bathroom. add new living room, bedrooms, bathrooms. new living space added at first floor level. | $320,000 |
| Feb 3, 2016 | Completed final sign-off Sep 2016 | 530 Flood Av | remodel of (e) 1st flr garage space into bedroom, bath & study.new open interior stair to replace non-conforming stair. minor interior remodel work at 2nd flr, removal of interior walls to open space. new radiant floor heat throughout.Details
remodel of (e) 1st flr garage space into bedroom, bath & study.new open interior stair to replace non-conforming stair. minor interior remodel work at 2nd flr, removal of interior walls to open space. new radiant floor heat throughout. | $120,000 |
| Jan 11, 2016 | Completed final sign-off Jun 2016 | 318 Walnut St | interior remodel: 1st floor powder room and kitchen. 2nd floor: master bedroom closet and bathroom. 3rd floor: add closet to bedroom #3.Details
interior remodel: 1st floor powder room and kitchen. 2nd floor: master bedroom closet and bathroom. 3rd floor: add closet to bedroom #3. | $100,000 |
| Dec 17, 2015 | Completed final sign-off Jul 2016 | 1448 10th Av | remodel of existing 3rd floor unit. provide new master bathroom. provide new kitchen. extend landing for egress stair. seismic under seperate permit.Details
remodel of existing 3rd floor unit. provide new master bathroom. provide new kitchen. extend landing for egress stair. seismic under seperate permit. | $130,000 |
| Nov 17, 2015 | Completed final sign-off Nov 2015 | 3922 22nd St | reduce scope of work to just remodel bathroom. remove stair work. revision to permit app#: 201510058829.Details
reduce scope of work to just remodel bathroom. remove stair work. revision to permit app#: 201510058829. | |
| Nov 17, 2015 | Expired or cancelled cancelled Aug 2016 | 1448 10th Av | kitchen and bathroom remodel, in-kind. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
kitchen and bathroom remodel, in-kind. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $20,000 |
| Oct 5, 2015 | Completed final sign-off Nov 2015 | 3922 22nd St | remodel existing bathroom and add new curved treads and risers at stairsDetails
remodel existing bathroom and add new curved treads and risers at stairs | $35,000 |