Back to kitchen remodel contractors
Mission Bay Construction Services
- Based in
- San Francisco
- On San Francisco permits
- Nov 2007 to Mar 2014
- Last 24 months
- 0 permits filed
24 permits since 2000: 11 completed, 9 never finaled, 4 expired or cancelled.
Of the 9 never-finaled permits, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 7 completed, 2 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 101 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 20, 2013 | Expired or cancelled expired Feb 2016 | 4515 25th St | replace upper kitchen cabinets, replace counter top, sink in kind. master bathroom, replace floor & wall tile vanity sink & toilet & tub in kind. kitchen lighting 50% wattage min to be high eff. bathroom lighting to be high eff. or controlled by manual on sensorDetails
replace upper kitchen cabinets, replace counter top, sink in kind. master bathroom, replace floor & wall tile vanity sink & toilet & tub in kind. kitchen lighting 50% wattage min to be high eff. bathroom lighting to be high eff. or controlled by manual on sensor | $32,000 |
| Apr 22, 2013 | Completed final sign-off Nov 2013 | 515 05th Av | replace kitchen cabinets in kind for middle level unit, any changes in lighting fixtures, 50% of total wattae shall be high efficacy.Details
replace kitchen cabinets in kind for middle level unit, any changes in lighting fixtures, 50% of total wattae shall be high efficacy. | $9,400 |
| Feb 26, 2013 | Expired or cancelled expired Dec 2015 | 78 Pond St | install new shower, toilet and sink to existing 2nd floor residence, new cabients in kitchen in kindDetails
install new shower, toilet and sink to existing 2nd floor residence, new cabients in kitchen in kind | $9,000 |
| Feb 8, 2013 | Never finaled issued Feb 2013, no final | 1239 12th Av | revision to pa# 201212045437/201301047271. expand 3rd fl bath by re-framing non-structural wall to fit tub & move toilet and sink. expand kitchen by removing 1 non-structural wall. move location in garage of heater. hot water, electrical panel.Details
revision to pa# 201212045437/201301047271. expand 3rd fl bath by re-framing non-structural wall to fit tub & move toilet and sink. expand kitchen by removing 1 non-structural wall. move location in garage of heater. hot water, electrical panel. | $2,000 |
| Aug 29, 2012 | Expired or cancelled expired Mar 2015 | 1441 11th Av | replace kitchen in kind, cabinets counter top, appliances, sink & lights, half bath on main floo; replace in kind. tiles, toilet, sink at up stairs both replace in kind, shower, tub, toilet, sink & lights, per cec 150(k)8&10.Details
replace kitchen in kind, cabinets counter top, appliances, sink & lights, half bath on main floo; replace in kind. tiles, toilet, sink at up stairs both replace in kind, shower, tub, toilet, sink & lights, per cec 150(k)8&10. | $12,500 |
| May 7, 2012 | Completed final sign-off Aug 2012 | 662 Elizabeth St | replace kitchen cabinets in kind, cabinets, countertop.Details
replace kitchen cabinets in kind, cabinets, countertop. | $9,200 |
| Aug 25, 2011 | Completed final sign-off Jan 2012 | 272 Stratford Dr | alteration:remodel extg bathrooms at ground floor and second floor.remodel extg kitchen at main floor. added new bathroom at 2nd floor.Details
alteration:remodel extg bathrooms at ground floor and second floor.remodel extg kitchen at main floor. added new bathroom at 2nd floor. | $12,000 |
| Mar 19, 2009 | Completed final sign-off Apr 2009 | 331 Seneca Av | remove sink & cap off plumbing in kitchen on 1st floor to meet code 106.1.1, to comply w/ nov 200710811, to complete work and obtain final inspection for work approved at pa# 2007/10/04/4601.Details
remove sink & cap off plumbing in kitchen on 1st floor to meet code 106.1.1, to comply w/ nov 200710811, to complete work and obtain final inspection for work approved at pa# 2007/10/04/4601. | $1,000 |
| Feb 5, 2009 | Completed final sign-off May 2009 | 710 Broderick St | work @ upper unit only. replace kitchen tile, cabinets, sink, dw, hood, install new 60 amp sub panel in kitchen area with 8 new circuits, replace tub, vanity cabinet & sink, tile floor & tub surround & install 2 new circuits, upgrade service to 200 amp. kitchen work on 2nd floor bath on 3rd floor.Details
work @ upper unit only. replace kitchen tile, cabinets, sink, dw, hood, install new 60 amp sub panel in kitchen area with 8 new circuits, replace tub, vanity cabinet & sink, tile floor & tub surround & install 2 new circuits, upgrade service to 200 amp. kitchen work on 2nd floor bath on 3rd floor. | $46,000 |
| Dec 11, 2008 | Never finaled issued Dec 2008, no final | 3184 Turk Bl | remodel kitchen & bathroom, insulate ext. walls in kitchen and bath, install new tub and toilet & sink, tile floor & tub surround, install new kitchen cabinets w/ granite counter top, tile floor.Details
remodel kitchen & bathroom, insulate ext. walls in kitchen and bath, install new tub and toilet & sink, tile floor & tub surround, install new kitchen cabinets w/ granite counter top, tile floor. | $26,000 |
| Jun 13, 2008 | Completed final sign-off Aug 2008 | 4418 Cabrillo St | tile floor and shower in bathroom, new tub, in kitchen. install new cabinets, granite counter top. tile floor & shower in bathrm, new tub in kitchen install new cabinets, granite countertop,Details
tile floor and shower in bathroom, new tub, in kitchen. install new cabinets, granite counter top. tile floor & shower in bathrm, new tub in kitchen install new cabinets, granite countertop, | $36,000 |
| Nov 8, 2007 | Completed final sign-off Nov 2012 | 140 Belvedere St | remove kitchen cabinets & replace, install new countertop, under cabinet lighting, patch cracked plastic in hallway & living room, install new lights in living room, update wiring in living room & kitchen, install new sub panel in laundry area, replace part of of handrail above stairs.Details
remove kitchen cabinets & replace, install new countertop, under cabinet lighting, patch cracked plastic in hallway & living room, install new lights in living room, update wiring in living room & kitchen, install new sub panel in laundry area, replace part of of handrail above stairs. | $18,000 |