Mission Bay Construction Services
- Based in
- San Francisco
- On San Francisco permits
- Nov 2007 to Mar 2014
- Last 24 months
- 0 permits filed
24 permits since 2000: 11 completed, 9 never finaled, 4 expired or cancelled.
Of the 9 never-finaled permits, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 26, 2014 | Completed final sign-off May 2014 | 66 Eureka St | bathroom remodel, replace tub, sink and vanity # 66Details
bathroom remodel, replace tub, sink and vanity # 66 | $9,600 |
| Mar 7, 2014 | Completed final sign-off Jul 2014 | 2286 Filbert St | replace bathroom in kind, shower, sink, fan, tile & tubDetails
replace bathroom in kind, shower, sink, fan, tile & tub | $9,000 |
| Oct 4, 2013 | Never finaled issued Oct 2013, no final | 1024 Page St | to obtain final inspecvtion for work approved under pa#2013-0321-6531. all work is complete.Details
to obtain final inspecvtion for work approved under pa#2013-0321-6531. all work is complete. | |
| Jun 20, 2013 | Expired or cancelled expired Feb 2016 | 4515 25th St | replace upper kitchen cabinets, replace counter top, sink in kind. master bathroom, replace floor & wall tile vanity sink & toilet & tub in kind. kitchen lighting 50% wattage min to be high eff. bathroom lighting to be high eff. or controlled by manual on sensorDetails
replace upper kitchen cabinets, replace counter top, sink in kind. master bathroom, replace floor & wall tile vanity sink & toilet & tub in kind. kitchen lighting 50% wattage min to be high eff. bathroom lighting to be high eff. or controlled by manual on sensor | $32,000 |
| Apr 22, 2013 | Completed final sign-off Nov 2013 | 515 05th Av | replace kitchen cabinets in kind for middle level unit, any changes in lighting fixtures, 50% of total wattae shall be high efficacy.Details
replace kitchen cabinets in kind for middle level unit, any changes in lighting fixtures, 50% of total wattae shall be high efficacy. | $9,400 |
| Mar 27, 2013 | Never finaled issued Mar 2013, no final | 1084 Howard St | work in unit c: to obtain final inspection for work approved under pa#200904085851. all work is complete.Details
work in unit c: to obtain final inspection for work approved under pa#200904085851. all work is complete. | |
| Feb 26, 2013 | Expired or cancelled expired Dec 2015 | 78 Pond St | install new shower, toilet and sink to existing 2nd floor residence, new cabients in kitchen in kindDetails
install new shower, toilet and sink to existing 2nd floor residence, new cabients in kitchen in kind | $9,000 |
| Feb 8, 2013 | Never finaled issued Feb 2013, no final | 1239 12th Av | revision to pa# 201212045437/201301047271. expand 3rd fl bath by re-framing non-structural wall to fit tub & move toilet and sink. expand kitchen by removing 1 non-structural wall. move location in garage of heater. hot water, electrical panel.Details
revision to pa# 201212045437/201301047271. expand 3rd fl bath by re-framing non-structural wall to fit tub & move toilet and sink. expand kitchen by removing 1 non-structural wall. move location in garage of heater. hot water, electrical panel. | $2,000 |
| Jan 4, 2013 | Never finaled issued Jan 2013, no final | 1239 12th Av | revision to pa# 201212045437. add 1/2 bathroom to 2nd floor, demo/insulate walls as needed for new electrical, demo/replace floors where unable to refinish, remove fa/sp system, remove deck and stairs in backyard, new electric panel & wiring througout. install smoke detectors, bathroom ventsDetails
revision to pa# 201212045437. add 1/2 bathroom to 2nd floor, demo/insulate walls as needed for new electrical, demo/replace floors where unable to refinish, remove fa/sp system, remove deck and stairs in backyard, new electric panel & wiring througout. install smoke detectors, bathroom vents | $50,000 |
| Aug 29, 2012 | Expired or cancelled expired Mar 2015 | 1441 11th Av | replace kitchen in kind, cabinets counter top, appliances, sink & lights, half bath on main floo; replace in kind. tiles, toilet, sink at up stairs both replace in kind, shower, tub, toilet, sink & lights, per cec 150(k)8&10.Details
replace kitchen in kind, cabinets counter top, appliances, sink & lights, half bath on main floo; replace in kind. tiles, toilet, sink at up stairs both replace in kind, shower, tub, toilet, sink & lights, per cec 150(k)8&10. | $12,500 |
| Jul 11, 2012 | Completed final sign-off Oct 2012 | 61 Garcia Av | replace bathroom in kind, toilet, shower, vanity, tile. permantly install lights in bathroom - he unless they are controlled by mnaul on occupancy sensors cec 150(k).10Details
replace bathroom in kind, toilet, shower, vanity, tile. permantly install lights in bathroom - he unless they are controlled by mnaul on occupancy sensors cec 150(k).10 | $8,000 |
| Jun 4, 2012 | Never finaled issued Jun 2012, no final | 1084 Howard St | unit #c-comply with nov# 201041159-remove work done without permits & return to r-2 occupancy - remove non-bearing partitions constructed by tenant.Details
unit #c-comply with nov# 201041159-remove work done without permits & return to r-2 occupancy - remove non-bearing partitions constructed by tenant. | $3,400 |
| May 7, 2012 | Completed final sign-off Aug 2012 | 662 Elizabeth St | replace kitchen cabinets in kind, cabinets, countertop.Details
replace kitchen cabinets in kind, cabinets, countertop. | $9,200 |
| Mar 21, 2012 | Never finaled issued Mar 2012, no final | 1024 Page St | replace bathroom in kind, tiles shower floor, toilet, vanity, sink exhaust fan, vanity light, gfci. no changes on walls and openings.Details
replace bathroom in kind, tiles shower floor, toilet, vanity, sink exhaust fan, vanity light, gfci. no changes on walls and openings. | $6,500 |
| Aug 25, 2011 | Completed final sign-off Jan 2012 | 272 Stratford Dr | alteration:remodel extg bathrooms at ground floor and second floor.remodel extg kitchen at main floor. added new bathroom at 2nd floor.Details
alteration:remodel extg bathrooms at ground floor and second floor.remodel extg kitchen at main floor. added new bathroom at 2nd floor. | $12,000 |
| Apr 21, 2009 | Expired or cancelled expired Feb 2012 | 450 Sutter St | 19th floor ste 1905 - construct new office space & employee lounge area 428 sq ft, install new electrical 60 amp subpanel to supply enw area. install new sink in employee lounge tie into (e0 waste , hot & cold in unit. const as per plans.Details
19th floor ste 1905 - construct new office space & employee lounge area 428 sq ft, install new electrical 60 amp subpanel to supply enw area. install new sink in employee lounge tie into (e0 waste , hot & cold in unit. const as per plans. | $29,000 |
| Apr 8, 2009 | Never finaled issued Apr 2009, no final | 1084 Howard St | to obtain final inspection for work approved under pa #200804169864, all work is completed.Details
to obtain final inspection for work approved under pa #200804169864, all work is completed. | |
| Mar 19, 2009 | Completed final sign-off Apr 2009 | 331 Seneca Av | remove sink & cap off plumbing in kitchen on 1st floor to meet code 106.1.1, to comply w/ nov 200710811, to complete work and obtain final inspection for work approved at pa# 2007/10/04/4601.Details
remove sink & cap off plumbing in kitchen on 1st floor to meet code 106.1.1, to comply w/ nov 200710811, to complete work and obtain final inspection for work approved at pa# 2007/10/04/4601. | $1,000 |
| Feb 5, 2009 | Completed final sign-off May 2009 | 710 Broderick St | work @ upper unit only. replace kitchen tile, cabinets, sink, dw, hood, install new 60 amp sub panel in kitchen area with 8 new circuits, replace tub, vanity cabinet & sink, tile floor & tub surround & install 2 new circuits, upgrade service to 200 amp. kitchen work on 2nd floor bath on 3rd floor.Details
work @ upper unit only. replace kitchen tile, cabinets, sink, dw, hood, install new 60 amp sub panel in kitchen area with 8 new circuits, replace tub, vanity cabinet & sink, tile floor & tub surround & install 2 new circuits, upgrade service to 200 amp. kitchen work on 2nd floor bath on 3rd floor. | $46,000 |
| Dec 11, 2008 | Never finaled issued Dec 2008, no final | 3184 Turk Bl | remodel kitchen & bathroom, insulate ext. walls in kitchen and bath, install new tub and toilet & sink, tile floor & tub surround, install new kitchen cabinets w/ granite counter top, tile floor.Details
remodel kitchen & bathroom, insulate ext. walls in kitchen and bath, install new tub and toilet & sink, tile floor & tub surround, install new kitchen cabinets w/ granite counter top, tile floor. | $26,000 |
| Jun 13, 2008 | Completed final sign-off Aug 2008 | 4418 Cabrillo St | tile floor and shower in bathroom, new tub, in kitchen. install new cabinets, granite counter top. tile floor & shower in bathrm, new tub in kitchen install new cabinets, granite countertop,Details
tile floor and shower in bathroom, new tub, in kitchen. install new cabinets, granite counter top. tile floor & shower in bathrm, new tub in kitchen install new cabinets, granite countertop, | $36,000 |
| Apr 16, 2008 | Never finaled issued Apr 2008, no final | 1084 Howard St | work @ unit# c. replace broken toilet,vanity and sink.patch drywall in walls and ceilings with 5/8 type x.all work in unit c to comply with n.o.v. 200839548. no structural work.Details
work @ unit# c. replace broken toilet,vanity and sink.patch drywall in walls and ceilings with 5/8 type x.all work in unit c to comply with n.o.v. 200839548. no structural work. | $6,000 |
| Apr 15, 2008 | Completed final sign-off May 2008 | 124 Scott St | dryrot repair to existing exterior exit stairs & stringers @ rear, repair and/or replace as needed for condo units at 124 & 126 scott st.- common stair. replace in kind same foot print except as noted.Details
dryrot repair to existing exterior exit stairs & stringers @ rear, repair and/or replace as needed for condo units at 124 & 126 scott st.- common stair. replace in kind same foot print except as noted. | $6,000 |
| Nov 8, 2007 | Completed final sign-off Nov 2012 | 140 Belvedere St | remove kitchen cabinets & replace, install new countertop, under cabinet lighting, patch cracked plastic in hallway & living room, install new lights in living room, update wiring in living room & kitchen, install new sub panel in laundry area, replace part of of handrail above stairs.Details
remove kitchen cabinets & replace, install new countertop, under cabinet lighting, patch cracked plastic in hallway & living room, install new lights in living room, update wiring in living room & kitchen, install new sub panel in laundry area, replace part of of handrail above stairs. | $18,000 |