Back to kitchen remodel contractors
Ming Wah Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jan 2010
- Last 24 months
- 0 permits filed
48 permits since 2000: 38 completed, 3 never finaled, 7 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 6, 2009 | Completed final sign-off May 2009 | 2039 41st Av | remodel 1 kitchen as like, remodel 1 bathroom as like.Details
remodel 1 kitchen as like, remodel 1 bathroom as like. | $18,000 |
| Dec 3, 2008 | Completed final sign-off Aug 2009 | 1962 Buchanan St | repair water damage. 1st floor: remodel 1 bedroom, hallway, 1 kitchen and 1 bathroom as like. 2nd fl: 1 bedroom, 1 kitchen, and bathroom. basement remodel utilityroom, bathroom + playroom. replace water heater + furnace in kind. same location.Details
repair water damage. 1st floor: remodel 1 bedroom, hallway, 1 kitchen and 1 bathroom as like. 2nd fl: 1 bedroom, 1 kitchen, and bathroom. basement remodel utilityroom, bathroom + playroom. replace water heater + furnace in kind. same location. | $60,000 |
| May 23, 2008 | Completed final sign-off Jan 2009 | 55 Sunview Dr | remodel kitchen & bath on 2nd floor, bathroom addition on 1st floor, plumbing, electrical work, no structural work.Details
remodel kitchen & bath on 2nd floor, bathroom addition on 1st floor, plumbing, electrical work, no structural work. | $95,000 |
| Jan 29, 2008 | Completed final sign-off Oct 2008 | 643 23rd Av | remodel 1 bathroom & 1 kitchen on 2nd floor and 1 bathroom on 3rd floor. replace in kind.Details
remodel 1 bathroom & 1 kitchen on 2nd floor and 1 bathroom on 3rd floor. replace in kind. | $40,000 |
| Dec 20, 2005 | Completed final sign-off Mar 2006 | 130 Morningside Dr | legallize (e) office at ground floor, reinforce floor joist for breakfast area and (e) kitchen, remodel (e) closets and bathrs aadd another bath on 2nd floor, dry rot repair froont entry prochDetails
legallize (e) office at ground floor, reinforce floor joist for breakfast area and (e) kitchen, remodel (e) closets and bathrs aadd another bath on 2nd floor, dry rot repair froont entry proch | $20,000 |
| Jul 1, 2005 | Completed final sign-off Oct 2005 | 4315 Clement St | to remodel4 kitvchens, r bathrooms, 4 sub panels, repalce kitchen cabinets, counter top, kitchenDetails
to remodel4 kitvchens, r bathrooms, 4 sub panels, repalce kitchen cabinets, counter top, kitchen | $100,000 |
| Aug 8, 2002 | Completed final sign-off Dec 2002 | 185 Broadmoor Dr | kitchen & two bathrms remodel. replaced kitchen appliances tiles on wall & flr counter top. replacedDetails
kitchen & two bathrms remodel. replaced kitchen appliances tiles on wall & flr counter top. replaced | $40,000 |