Back to bathroom remodel contractors
Ming Wah Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jan 2010
- Last 24 months
- 0 permits filed
48 permits since 2000: 38 completed, 3 never finaled, 7 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 12 completed. Typically 0 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 13, 2009 | Completed final sign-off Apr 2010 | 138 Arguello Bl | remodel existing bathroom on 3rd fl. replace existing flue at lightwell. replace tile, vanity, and toilet in powder room. replace 12x18 fix window in powder roomDetails
remodel existing bathroom on 3rd fl. replace existing flue at lightwell. replace tile, vanity, and toilet in powder room. replace 12x18 fix window in powder room | $10,000 |
| Apr 6, 2009 | Completed final sign-off May 2009 | 2039 41st Av | remodel 1 kitchen as like, remodel 1 bathroom as like.Details
remodel 1 kitchen as like, remodel 1 bathroom as like. | $18,000 |
| Dec 3, 2008 | Completed final sign-off Aug 2009 | 1962 Buchanan St | repair water damage. 1st floor: remodel 1 bedroom, hallway, 1 kitchen and 1 bathroom as like. 2nd fl: 1 bedroom, 1 kitchen, and bathroom. basement remodel utilityroom, bathroom + playroom. replace water heater + furnace in kind. same location.Details
repair water damage. 1st floor: remodel 1 bedroom, hallway, 1 kitchen and 1 bathroom as like. 2nd fl: 1 bedroom, 1 kitchen, and bathroom. basement remodel utilityroom, bathroom + playroom. replace water heater + furnace in kind. same location. | $60,000 |
| Jun 12, 2008 | Completed final sign-off Nov 2008 | 1460 Wayland St | interior remodeling in an (e) g/f garage: 3 rooms, 1 bath & 1 laundry room. work includes wood framing, gyp board, wonder bd. (water resistent), electrical, ducts & plumbing.Details
interior remodeling in an (e) g/f garage: 3 rooms, 1 bath & 1 laundry room. work includes wood framing, gyp board, wonder bd. (water resistent), electrical, ducts & plumbing. | $30,000 |
| May 23, 2008 | Completed final sign-off Jan 2009 | 55 Sunview Dr | remodel kitchen & bath on 2nd floor, bathroom addition on 1st floor, plumbing, electrical work, no structural work.Details
remodel kitchen & bath on 2nd floor, bathroom addition on 1st floor, plumbing, electrical work, no structural work. | $95,000 |
| Feb 25, 2008 | Completed final sign-off Jun 2008 | 31 Sylvan Dr | remodel existing 1st floor, adding bedroom, full bath, entertianment room. (n) laundry room. replace window with glass sliding door. replace existing windowDetails
remodel existing 1st floor, adding bedroom, full bath, entertianment room. (n) laundry room. replace window with glass sliding door. replace existing window | $30,000 |
| Jan 29, 2008 | Completed final sign-off Oct 2008 | 643 23rd Av | remodel 1 bathroom & 1 kitchen on 2nd floor and 1 bathroom on 3rd floor. replace in kind.Details
remodel 1 bathroom & 1 kitchen on 2nd floor and 1 bathroom on 3rd floor. replace in kind. | $40,000 |
| Jun 12, 2007 | Completed final sign-off Feb 2010 | 1109 Moraga St | remove columns (2) at garage and add storage rm,relocate furnace and water heater at garage, add 3rd flr,stair to 3rd fl, remodel e bath,waterproof lightwell 2nd fl,add rear yard deck and stair,n paving rear yard, demo e rear covered trellisDetails
remove columns (2) at garage and add storage rm,relocate furnace and water heater at garage, add 3rd flr,stair to 3rd fl, remodel e bath,waterproof lightwell 2nd fl,add rear yard deck and stair,n paving rear yard, demo e rear covered trellis | $325,000 |
| Dec 20, 2005 | Completed final sign-off Mar 2006 | 130 Morningside Dr | legallize (e) office at ground floor, reinforce floor joist for breakfast area and (e) kitchen, remodel (e) closets and bathrs aadd another bath on 2nd floor, dry rot repair froont entry prochDetails
legallize (e) office at ground floor, reinforce floor joist for breakfast area and (e) kitchen, remodel (e) closets and bathrs aadd another bath on 2nd floor, dry rot repair froont entry proch | $20,000 |
| Jul 1, 2005 | Completed final sign-off Oct 2005 | 4315 Clement St | to remodel4 kitvchens, r bathrooms, 4 sub panels, repalce kitchen cabinets, counter top, kitchenDetails
to remodel4 kitvchens, r bathrooms, 4 sub panels, repalce kitchen cabinets, counter top, kitchen | $100,000 |
| Jun 28, 2002 | Completed final sign-off Aug 2002 | 140 Gardenside Dr | #402- remove & install bathroom sheetrock, repair dryrot if necessaryDetails
#402- remove & install bathroom sheetrock, repair dryrot if necessary | $950 |
| Jun 8, 2001 | Completed final sign-off Sep 2002 | 643 32nd Av | one-stop:m.tjoe: add 1 family room, 1 bathroom, 1 storage between playroom and garage, remodel kitchDetails
one-stop:m.tjoe: add 1 family room, 1 bathroom, 1 storage between playroom and garage, remodel kitch | $19,000 |