Ming Fa Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2008 to Oct 2012
- Last 24 months
- 0 permits filed
14 permits since 2000: 9 completed, 5 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 26 days from filing to permit and 276 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2012 | Completed final sign-off Oct 2012 | 1231 York St | stair replace at back yard in rear, less than 50%.Details
stair replace at back yard in rear, less than 50%. | $750 |
| Jul 23, 2009 | Completed final sign-off Oct 2010 | 472 Euclid Av | interior remodel of (e) 2nd. flr. space and 1st. flr. space-2nd. flr.-kitchen remodel-replace counters, sinks, 2-bathrm. remodels-shower, tub, sinks, counters, reconfigure bedrm. spaces. add interior stair connection to 1st. level, 1st. flr. convert unfinished space to add a bedrm., bathrm./laundry,Details
interior remodel of (e) 2nd. flr. space and 1st. flr. space-2nd. flr.-kitchen remodel-replace counters, sinks, 2-bathrm. remodels-shower, tub, sinks, counters, reconfigure bedrm. spaces. add interior stair connection to 1st. level, 1st. flr. convert unfinished space to add a bedrm., bathrm./laundry, | $215,000 |