Back to kitchen remodel contractors
Millans Construction
- Based in
- Sout San Francisco
- On San Francisco permits
- Aug 2016 to Oct 2022
- Last 24 months
- 0 permits filed
21 permits since 2000: 15 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 2 never finaled. Typically 4 days from filing to permit and 348 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 4, 2019 | Completed final sign-off Mar 2020 | 2636 Mcallister St | interior remodel oe (e) kitchen space including removal of selected portions of non bearing walls new cbinets, appliances, plumbing, lighting elec fixtures and finishes throughout 3 new fixed sky lightsDetails
interior remodel oe (e) kitchen space including removal of selected portions of non bearing walls new cbinets, appliances, plumbing, lighting elec fixtures and finishes throughout 3 new fixed sky lights | $50,000 |
| Jan 29, 2019 | Completed final sign-off Jan 2020 | 475 24th Av | comply with violation 201808881, remodel kitchen, electrical, plumbingDetails
comply with violation 201808881, remodel kitchen, electrical, plumbing | $25,000 |
| Sep 16, 2016 | Never finaled issued Oct 2016, no final | 132 Jordan Av | 1st floor: new fireplace insert in living room 106; remove extg fireplace in dining room 103; replace window in kind in family room 102; replace slider with new french door in family room 102; new wall in kitchen 101. 2nd fl: 4 windows to be replaced in kind.Details
1st floor: new fireplace insert in living room 106; remove extg fireplace in dining room 103; replace window in kind in family room 102; replace slider with new french door in family room 102; new wall in kitchen 101. 2nd fl: 4 windows to be replaced in kind. | $20,000 |
| Aug 18, 2016 | Never finaled issued Aug 2016, no final | 132 Jordan Av | existing kitchen and bathroom alterations with no changes to the floor plan. no walls to be alteredDetails
existing kitchen and bathroom alterations with no changes to the floor plan. no walls to be altered | $25,000 |