Back to bathroom remodel contractors
Millans Construction
- Based in
- Sout San Francisco
- On San Francisco permits
- Aug 2016 to Oct 2022
- Last 24 months
- 0 permits filed
21 permits since 2000: 15 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 15 days from filing to permit and 384 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 24, 2019 | Completed final sign-off Mar 2021 | 2727 Union St | new full bathroom & media room on lower floor basement.Details
new full bathroom & media room on lower floor basement. | $15,000 |
| Nov 21, 2017 | Completed final sign-off Jun 2020 | 1552 35th Av | partial/rear 3rd fl addition, includes 2 bedrooms, playroom & bath. remodel ground floor bath & family room.Details
partial/rear 3rd fl addition, includes 2 bedrooms, playroom & bath. remodel ground floor bath & family room. | $250,000 |
| May 22, 2017 | Completed final sign-off Dec 2017 | 2727 Union St | bathroom remodel at 2nd floor master bedroom: remove and replace plumbing fixtures, wall tiles, floor tiles and lighting fixtures at same locations. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)5.Details
bathroom remodel at 2nd floor master bedroom: remove and replace plumbing fixtures, wall tiles, floor tiles and lighting fixtures at same locations. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)5. | $500 |
| May 18, 2017 | Completed final sign-off Dec 2017 | 2727 Union St | remodel master bathroom on 2nd fl, enclose water closet, new tile, new elec. throughout bath, reroute fireplace flue pipe at main fl, 2 new skylights, replace window in bath, infill windowDetails
remodel master bathroom on 2nd fl, enclose water closet, new tile, new elec. throughout bath, reroute fireplace flue pipe at main fl, 2 new skylights, replace window in bath, infill window | $75,000 |
| Aug 18, 2016 | Never finaled issued Aug 2016, no final | 132 Jordan Av | existing kitchen and bathroom alterations with no changes to the floor plan. no walls to be alteredDetails
existing kitchen and bathroom alterations with no changes to the floor plan. no walls to be altered | $25,000 |