Block 0950, lot 035
2727 Union St
- City’s use
- Single Family Residential
- Built
- 1911
- Stories
- 3
- Units
- 1
- Rooms
- 4 bedrooms, 4 bathrooms
- Building
- 4,024 sq ft
- Lot
- 2,812 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 18, 2023 | Completed final sign-off Jul 2023 | 2727 Union St | Ramirez Roofing Corporation | re-roofing strip shingles and new 40 year composite shingles install new guttersDetails
re-roofing strip shingles and new 40 year composite shingles install new gutters | $49,200 |
| Apr 5, 2023 | Completed final sign-off Jun 2023 | 2727 Union St | Millan & Associates | flood repair drywall repair at garage level. trenching concrete to install drainage perforated pipe. paint walls, new concrete in inlaw unit (not visible inside of home).Details
flood repair drywall repair at garage level. trenching concrete to install drainage perforated pipe. paint walls, new concrete in inlaw unit (not visible inside of home). | $10,000 |
| Jul 24, 2019 | Completed final sign-off Mar 2021 | 2727 Union St | Millans Construction | new full bathroom & media room on lower floor basement.Details
new full bathroom & media room on lower floor basement. | $15,000 |
| May 6, 2019 | Completed final sign-off Mar 2021 | 2727 Union St | Millans Construction | structural improvements at existing garage. new slab on grade & support beams and support foundations.Details
structural improvements at existing garage. new slab on grade & support beams and support foundations. | |
| May 22, 2017 | Completed final sign-off Dec 2017 | 2727 Union St | Millans Construction | bathroom remodel at 2nd floor master bedroom: remove and replace plumbing fixtures, wall tiles, floor tiles and lighting fixtures at same locations. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)5.Details
bathroom remodel at 2nd floor master bedroom: remove and replace plumbing fixtures, wall tiles, floor tiles and lighting fixtures at same locations. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)5. | $500 |
| May 18, 2017 | Completed final sign-off Dec 2017 | 2727 Union St | Millans Construction | remodel master bathroom on 2nd fl, enclose water closet, new tile, new elec. throughout bath, reroute fireplace flue pipe at main fl, 2 new skylights, replace window in bath, infill windowDetails
remodel master bathroom on 2nd fl, enclose water closet, new tile, new elec. throughout bath, reroute fireplace flue pipe at main fl, 2 new skylights, replace window in bath, infill window | $75,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Millans Construction (4), Millan & Associates, Ramirez Roofing Corporation
- Architects
- W Jason Alden
- Engineers
- Erevan O'neill
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.