Back to kitchen remodel contractors
Midglen Studio Assoc.
- Based in
- Woodside
- On San Francisco permits
- Jun 2003 to Jul 2025
- Last 24 months
- 1 permit filed
8 permits since 2000: 7 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 154 days from filing to permit and 183 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2025 | Completed final sign-off Jun 2026 | 101 Gold Mine Dr | enlarge existing kitchen on 2nd fl. new commercial cooking equipment, new mechanical rooftop units, replace existing water heater, new electrical sub panelDetails
enlarge existing kitchen on 2nd fl. new commercial cooking equipment, new mechanical rooftop units, replace existing water heater, new electrical sub panel | $80,000 |