Block 7534, lot 001
101 Gold Mine Dr
- City’s use
- Commercial Misc
- Built
- 1963
- Stories
- 1
- Rooms
- 2 bathrooms
- Lot
- 17,197 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 28, 2025 | Completed final sign-off Jun 2026 | 101 Gold Mine Dr | Midglen Studio Assoc. | enlarge existing kitchen on 2nd fl. new commercial cooking equipment, new mechanical rooftop units, replace existing water heater, new electrical sub panelDetails
enlarge existing kitchen on 2nd fl. new commercial cooking equipment, new mechanical rooftop units, replace existing water heater, new electrical sub panel | $80,000 |
| Jun 7, 2018 | Completed final sign-off Aug 2018 | 101 Gold Mine Dr | L M Preciado Construction | increase number of children from 14 to 24 at (e) daycare. planning only allowed 15 children max before. no change to use, size, exteriors. net increase of children is > 30. school drop-off & pick-up management plan is not required. add 2 class 1 bicycle spaces, add 2 baby changing stationsDetails
increase number of children from 14 to 24 at (e) daycare. planning only allowed 15 children max before. no change to use, size, exteriors. net increase of children is > 30. school drop-off & pick-up management plan is not required. add 2 class 1 bicycle spaces, add 2 baby changing stations | |
| Sep 25, 2017 | Completed final sign-off Oct 2017 | 101 Gold Mine Dr | International Fire Inc | lower floor- install new panel with radio comm., heat detector above & pull station near panel, install notification appliances throughout for complete coverage. tie-in (e) flow & tamper to new panel. t.i. pa#201708225605Details
lower floor- install new panel with radio comm., heat detector above & pull station near panel, install notification appliances throughout for complete coverage. tie-in (e) flow & tamper to new panel. t.i. pa#201708225605 | $6,000 |
| Aug 22, 2017 | Completed final sign-off Oct 2017 | 101 Gold Mine Dr | L M Preciado Construction | t.i. to lower floor of an (e) religious/institution to become a licensed child care center w/14 max children. child care is added as educational use (a-3 change to e). no change to upper floor. no change to (e) elect, lighting, hvac, plumbing, fire sprinkler. kitchen will not be accessible duringDetails
t.i. to lower floor of an (e) religious/institution to become a licensed child care center w/14 max children. child care is added as educational use (a-3 change to e). no change to upper floor. no change to (e) elect, lighting, hvac, plumbing, fire sprinkler. kitchen will not be accessible during | $6,000 |
| Jul 25, 2017 | Expired or cancelled cancelled Jan 2026 | 101 Gold Mine Dr | remove/replace commercial hood; replace window with door & panic push bar.Details
remove/replace commercial hood; replace window with door & panic push bar. | $5,500 | |
| Jan 13, 2015 | Never finaled issued Jan 2015, no final | 101 Gold Mine Dr | street space permitDetails
street space permit | ||
| Sep 3, 2014 | Completed final sign-off Apr 2015 | 101 Gold Mine Dr | Andrew Chekene Enterprises/ Dba Ac Enter | remove extg stucco. replace windows with milgard vinyl windows to match. repair any decayed framing in kind. install self adhered, vapor permeable weather barrier. install rain secreen and new 3 coat stucco to match. paint to match.Details
remove extg stucco. replace windows with milgard vinyl windows to match. repair any decayed framing in kind. install self adhered, vapor permeable weather barrier. install rain secreen and new 3 coat stucco to match. paint to match. | $105,000 |
| Aug 21, 2013 | Completed final sign-off Nov 2013 | 101 Gold Mine Dr | Dissmeyer Corp, Dba Acme Roofing Co | reroofingDetails
reroofing | $52,442 |
| Jul 16, 2012 | Never finaled issued Jul 2012, no final | 101 Gold Mine Dr | street spaceDetails
street space | ||
| Jun 27, 2002 | Completed final sign-off Jan 2003 | 101 Gold Mine Dr | Pacific Automatic Sprinkler | fire sprinkler work only. relocate 3 fire sprk & add 4 fire sprk tothe existing system. all on grd fDetails
fire sprinkler work only. relocate 3 fire sprk & add 4 fire sprk tothe existing system. all on grd f | $1,900 |
| May 3, 2002 | Completed final sign-off Dec 2002 | 101 Gold Mine Dr | Oliver & Company Inc. | rev#200203282583.add curb cut/landing/approved by sf dpw4/29/02Details
rev#200203282583.add curb cut/landing/approved by sf dpw4/29/02 | $1,500 |
| Mar 28, 2002 | Completed final sign-off Dec 2002 | 101 Gold Mine Dr | Oliver & Company Inc. | revision to pa #200107093213Details
revision to pa #200107093213 | $10,000 |
| Jul 9, 2001 | Completed final sign-off Jan 2003 | 101 Gold Mine Dr | Oliver & Company Inc. | add new 385 s.f narthex space, add new 270s.f covered staircase w/wheelchair lift, add new ext h.c.Details
add new 385 s.f narthex space, add new 270s.f covered staircase w/wheelchair lift, add new ext h.c. | $375,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Oliver & Company Inc. (3), L M Preciado Construction (2), Andrew Chekene Enterprises/ Dba Ac Enter, Dissmeyer Corp, Dba Acme Roofing Co, International Fire Inc, Midglen Studio Assoc., Pacific Automatic Sprinkler
- Architects
- A. Steven Patrick, Wing K. Lee
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.