Back to kitchen remodel contractors
Michael Clarke Construction
- Based in
- Fairfax
- On San Francisco permits
- Jan 2005 to Jun 2025
- Last 24 months
- 1 permit filed
44 permits since 2000: 34 completed, 2 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 15 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 3, 2023 | Completed final sign-off Nov 2023 | 1608 Lyon St | remodel bathroom: tub, shower, sink, toilet, retile: remodel kitchen- gas stove, fridge, cabinets, dishwasher, 3 windows- replaced, same size like for like. not visible from street. non structural.Details
remodel bathroom: tub, shower, sink, toilet, retile: remodel kitchen- gas stove, fridge, cabinets, dishwasher, 3 windows- replaced, same size like for like. not visible from street. non structural. | $30,000 |
| Jun 23, 2021 | Completed final sign-off Jul 2023 | 5 Fella Pl | unit 202: renovate (e) bathroom and (e) kitchen. new flooring, lighting. replace (e) wood fireplace with a gas fireplace. replace (e) wall heater with electric radiant heaters.Details
unit 202: renovate (e) bathroom and (e) kitchen. new flooring, lighting. replace (e) wood fireplace with a gas fireplace. replace (e) wall heater with electric radiant heaters. | $30,000 |
| Sep 5, 2019 | Completed final sign-off Aug 2024 | 1877 Church St | demolition of (e) roof & ceiling framing on the 2nd level of all spaces east of the original victorian house. construction of a new full bath, half bath, laundry closet, master bedroom & den as drawn. new deck & stairs to the garden. kitchen renovationDetails
demolition of (e) roof & ceiling framing on the 2nd level of all spaces east of the original victorian house. construction of a new full bath, half bath, laundry closet, master bedroom & den as drawn. new deck & stairs to the garden. kitchen renovation | $75,000 |
| Mar 19, 2019 | Completed final sign-off Jan 2021 | 179 Peralta Av | 1st flr, convert (e) storage space to conditioned, habitable space, construct (n) stair, remodel kitchen, bath & powder room, add bedroom, fam room, bath, laundry within (e) building envelopeDetails
1st flr, convert (e) storage space to conditioned, habitable space, construct (n) stair, remodel kitchen, bath & powder room, add bedroom, fam room, bath, laundry within (e) building envelope | $287,500 |
| May 29, 2015 | Completed final sign-off Oct 2015 | 49 Downey St | kitchen remodel; replace cabinets and applicances; upgrade elec & plumbing; to comply woth cec150.0(k)3Details
kitchen remodel; replace cabinets and applicances; upgrade elec & plumbing; to comply woth cec150.0(k)3 | $22,000 |
| Sep 9, 2013 | Completed final sign-off Sep 2014 | 448 Fair Oaks St | kitchen remodel: (n) cabinets, (n) electrical bathroom remodel: (n) window, (n) shower, (n) tile living room: replace window, replace kitchen skylight in-kind. all work done on 3rd fl. u-factor shall not exceed 0.4Details
kitchen remodel: (n) cabinets, (n) electrical bathroom remodel: (n) window, (n) shower, (n) tile living room: replace window, replace kitchen skylight in-kind. all work done on 3rd fl. u-factor shall not exceed 0.4 | $25,000 |
| Mar 27, 2013 | Completed final sign-off Aug 2013 | 3178 Washington St | arch/structural work at ground & 1st floor for removal of seleect interior walls at 1st floor including 1st floor bathroom, dining, kitchen & living room. minor interior remodel work on 1st floor. relocate toilet, replace some finishesDetails
arch/structural work at ground & 1st floor for removal of seleect interior walls at 1st floor including 1st floor bathroom, dining, kitchen & living room. minor interior remodel work on 1st floor. relocate toilet, replace some finishes | $20,000 |
| Feb 26, 2013 | Completed final sign-off Mar 2014 | 222 29th St | minor alteration, interior on 2nd floor level. kitchen & bathroom remodel. (n) beam & column.Details
minor alteration, interior on 2nd floor level. kitchen & bathroom remodel. (n) beam & column. | $8,000 |
| Aug 8, 2008 | Completed final sign-off Dec 2008 | 53 Cumberland St | work is at 55 cumberland: 2nd floor-remodel kitchen, bathroom and replace windows. new kitchen cabinets, fixtures, new bathroom fixtures, new windows, new wood floor & lightsDetails
work is at 55 cumberland: 2nd floor-remodel kitchen, bathroom and replace windows. new kitchen cabinets, fixtures, new bathroom fixtures, new windows, new wood floor & lights | $38,500 |
| Feb 7, 2008 | Completed final sign-off Jul 2008 | 465 Ellsworth St | kitchen and bathroom remodel with minor structural work to enlarge an existing cased opening btn kithchen and dining rm. replace single patio door to double french doors. infill door and windows on rear elevation.Details
kitchen and bathroom remodel with minor structural work to enlarge an existing cased opening btn kithchen and dining rm. replace single patio door to double french doors. infill door and windows on rear elevation. | $40,000 |
| Nov 29, 2007 | Completed final sign-off Apr 2008 | 39 Frederick St | 1 kitchen: replace cabinets + fixtures. new tile no structural work. 50% of wattage to be fluorescant. bathroom: move sink + toilet, new shower + tile work. replace washer + dryer no structural. lighting to be fluorescant or on occupant sensor.Details
1 kitchen: replace cabinets + fixtures. new tile no structural work. 50% of wattage to be fluorescant. bathroom: move sink + toilet, new shower + tile work. replace washer + dryer no structural. lighting to be fluorescant or on occupant sensor. | $24,000 |
| Jul 3, 2007 | Completed final sign-off Nov 2007 | 1190 Sanchez St | kitchen replace cabinets & appliance, paint, bathroom replace fixtures, tile, paint no lighting change.Details
kitchen replace cabinets & appliance, paint, bathroom replace fixtures, tile, paint no lighting change. | $24,000 |
| Oct 3, 2006 | Completed final sign-off Jun 2007 | 65 Homestead St | move kitchen/dining room wall, rearrange major appliances, remove wall 4th floor, add bathroom.short en 2 walls on main floor 3rd floorDetails
move kitchen/dining room wall, rearrange major appliances, remove wall 4th floor, add bathroom.short en 2 walls on main floor 3rd floor | $280,000 |
| Jan 17, 2006 | Completed final sign-off Jun 2006 | 1140 Stanyan St | remodel 2 (e) kitchens with new cabinets, counter top, sink appliances, refinish floors, paint, lighting. no structural work. remodel 2 (e) bathrooms with new toilet, vanity, lighting and tile no structural work.Details
remodel 2 (e) kitchens with new cabinets, counter top, sink appliances, refinish floors, paint, lighting. no structural work. remodel 2 (e) bathrooms with new toilet, vanity, lighting and tile no structural work. | $50,000 |
| Sep 12, 2005 | Expired or cancelled expired May 2006 | 211 Anderson St | remodel kitchen & bathrm. replace exterior doors & windows like kind at same location.Details
remodel kitchen & bathrm. replace exterior doors & windows like kind at same location. | $20,000 |
| Jun 21, 2005 | Completed final sign-off Sep 2005 | 260 College Av | remodel existing kitchen with new cabinets, appliances, new floorDetails
remodel existing kitchen with new cabinets, appliances, new floor | $18,000 |
| Jan 24, 2005 | Never finaled issued Jan 2005, no final | 1375 35th Av | horzontal addition- kitchen remodel bathrm remodel on 2nd flr; replacement of (e) alum windows w/n wDetails
horzontal addition- kitchen remodel bathrm remodel on 2nd flr; replacement of (e) alum windows w/n w | $40,000 |