Back to bathroom remodel contractors
Michael Clarke Construction
- Based in
- Fairfax
- On San Francisco permits
- Jan 2005 to Jun 2025
- Last 24 months
- 1 permit filed
44 permits since 2000: 34 completed, 2 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 22 completed, 1 never finaled. Typically 8 days from filing to permit and 250 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 28, 2024 | Completed final sign-off Apr 2026 | 412 Mississippi St | demo extg stair from 2nd floor to ground floor and replace as drawn. demo extg bath at ground floor and replace as drawn. relocate laundry as drawn. add bar to ground floor. replace extg windows at ground fl. 550 for framing and foundation.Details
demo extg stair from 2nd floor to ground floor and replace as drawn. demo extg bath at ground floor and replace as drawn. relocate laundry as drawn. add bar to ground floor. replace extg windows at ground fl. 550 for framing and foundation. | $49,000 |
| Mar 3, 2023 | Completed final sign-off Nov 2023 | 1608 Lyon St | remodel bathroom: tub, shower, sink, toilet, retile: remodel kitchen- gas stove, fridge, cabinets, dishwasher, 3 windows- replaced, same size like for like. not visible from street. non structural.Details
remodel bathroom: tub, shower, sink, toilet, retile: remodel kitchen- gas stove, fridge, cabinets, dishwasher, 3 windows- replaced, same size like for like. not visible from street. non structural. | $30,000 |
| Jun 23, 2021 | Completed final sign-off Jul 2023 | 5 Fella Pl | unit 202: renovate (e) bathroom and (e) kitchen. new flooring, lighting. replace (e) wood fireplace with a gas fireplace. replace (e) wall heater with electric radiant heaters.Details
unit 202: renovate (e) bathroom and (e) kitchen. new flooring, lighting. replace (e) wood fireplace with a gas fireplace. replace (e) wall heater with electric radiant heaters. | $30,000 |
| Sep 5, 2019 | Completed final sign-off Aug 2024 | 1877 Church St | demolition of (e) roof & ceiling framing on the 2nd level of all spaces east of the original victorian house. construction of a new full bath, half bath, laundry closet, master bedroom & den as drawn. new deck & stairs to the garden. kitchen renovationDetails
demolition of (e) roof & ceiling framing on the 2nd level of all spaces east of the original victorian house. construction of a new full bath, half bath, laundry closet, master bedroom & den as drawn. new deck & stairs to the garden. kitchen renovation | $75,000 |
| Mar 19, 2019 | Completed final sign-off Jan 2021 | 179 Peralta Av | 1st flr, convert (e) storage space to conditioned, habitable space, construct (n) stair, remodel kitchen, bath & powder room, add bedroom, fam room, bath, laundry within (e) building envelopeDetails
1st flr, convert (e) storage space to conditioned, habitable space, construct (n) stair, remodel kitchen, bath & powder room, add bedroom, fam room, bath, laundry within (e) building envelope | $287,500 |
| Dec 13, 2017 | Completed final sign-off Feb 2019 | 2087 17th Av | (e) ground floor to be remodeled to accommodate a large master suite with bedroom office and bath. a mud room with bar & laundry and guest bath too. garge & utlities to remain in smaller sizeDetails
(e) ground floor to be remodeled to accommodate a large master suite with bedroom office and bath. a mud room with bar & laundry and guest bath too. garge & utlities to remain in smaller size | $75,000 |
| Oct 20, 2015 | Never finaled issued Dec 2015, no final | 584 Anderson St | new dormer at roof and addition of bathroom on 2nd floor. remove fireplace and pocket doors on 1st floor.Details
new dormer at roof and addition of bathroom on 2nd floor. remove fireplace and pocket doors on 1st floor. | $20,000 |
| Nov 27, 2013 | Completed final sign-off Feb 2016 | 949 Elizabeth St | foundation upgrade. basement conversion. new staircase. new guest room, new bathroom, new family room, gym. 1st floor: remodel bathroom. 2nd floor: remodel entire floor, new layout, add new bathroom, new replacement windows. 3 relocate bedroom.Details
foundation upgrade. basement conversion. new staircase. new guest room, new bathroom, new family room, gym. 1st floor: remodel bathroom. 2nd floor: remodel entire floor, new layout, add new bathroom, new replacement windows. 3 relocate bedroom. | $200,000 |
| Sep 9, 2013 | Completed final sign-off Sep 2014 | 448 Fair Oaks St | kitchen remodel: (n) cabinets, (n) electrical bathroom remodel: (n) window, (n) shower, (n) tile living room: replace window, replace kitchen skylight in-kind. all work done on 3rd fl. u-factor shall not exceed 0.4Details
kitchen remodel: (n) cabinets, (n) electrical bathroom remodel: (n) window, (n) shower, (n) tile living room: replace window, replace kitchen skylight in-kind. all work done on 3rd fl. u-factor shall not exceed 0.4 | $25,000 |
| Mar 27, 2013 | Completed final sign-off Aug 2013 | 3178 Washington St | arch/structural work at ground & 1st floor for removal of seleect interior walls at 1st floor including 1st floor bathroom, dining, kitchen & living room. minor interior remodel work on 1st floor. relocate toilet, replace some finishesDetails
arch/structural work at ground & 1st floor for removal of seleect interior walls at 1st floor including 1st floor bathroom, dining, kitchen & living room. minor interior remodel work on 1st floor. relocate toilet, replace some finishes | $20,000 |
| Feb 26, 2013 | Completed final sign-off Mar 2014 | 222 29th St | minor alteration, interior on 2nd floor level. kitchen & bathroom remodel. (n) beam & column.Details
minor alteration, interior on 2nd floor level. kitchen & bathroom remodel. (n) beam & column. | $8,000 |
| Apr 20, 2012 | Completed final sign-off Mar 2013 | 222 29th St | remodel 2 living spaces into master bedroom and master bath. add 1 skylight. relocate heating vents. all insterior work except skylight.Details
remodel 2 living spaces into master bedroom and master bath. add 1 skylight. relocate heating vents. all insterior work except skylight. | $50,000 |
| Jun 18, 2010 | Completed final sign-off Oct 2011 | 517 Day St | reconfigure living room & dining room, add a bathroom at master bedroom, enclose existing lightwell & reconfigure stair to basement, add a bedroom & bathroom at basement.Details
reconfigure living room & dining room, add a bathroom at master bedroom, enclose existing lightwell & reconfigure stair to basement, add a bedroom & bathroom at basement. | $220,000 |
| May 10, 2010 | Completed final sign-off Jan 2011 | 1201 Douglass St | gr.fl: (n) tile entry,bedrm closet.2ndfl: remodel kitch, new cabs, appliances,lighting, replace front rm lights,(n)pocket drs/3rdfl: remodel master bath and 2nd bath. reconfigure closet/bath, partition walls, relocate w/d. all flrs:repaint int, refinish all floorsDetails
gr.fl: (n) tile entry,bedrm closet.2ndfl: remodel kitch, new cabs, appliances,lighting, replace front rm lights,(n)pocket drs/3rdfl: remodel master bath and 2nd bath. reconfigure closet/bath, partition walls, relocate w/d. all flrs:repaint int, refinish all floors | $80,000 |
| Aug 8, 2008 | Completed final sign-off Dec 2008 | 53 Cumberland St | work is at 55 cumberland: 2nd floor-remodel kitchen, bathroom and replace windows. new kitchen cabinets, fixtures, new bathroom fixtures, new windows, new wood floor & lightsDetails
work is at 55 cumberland: 2nd floor-remodel kitchen, bathroom and replace windows. new kitchen cabinets, fixtures, new bathroom fixtures, new windows, new wood floor & lights | $38,500 |
| Jul 25, 2008 | Completed final sign-off Jan 2009 | 1101 Green St | work @ unit# 502 only. remodel bathroom. change fixtures, add shower door in bathroom.Details
work @ unit# 502 only. remodel bathroom. change fixtures, add shower door in bathroom. | $6,400 |
| Feb 7, 2008 | Completed final sign-off Jul 2008 | 465 Ellsworth St | kitchen and bathroom remodel with minor structural work to enlarge an existing cased opening btn kithchen and dining rm. replace single patio door to double french doors. infill door and windows on rear elevation.Details
kitchen and bathroom remodel with minor structural work to enlarge an existing cased opening btn kithchen and dining rm. replace single patio door to double french doors. infill door and windows on rear elevation. | $40,000 |
| Nov 29, 2007 | Completed final sign-off Apr 2008 | 39 Frederick St | 1 kitchen: replace cabinets + fixtures. new tile no structural work. 50% of wattage to be fluorescant. bathroom: move sink + toilet, new shower + tile work. replace washer + dryer no structural. lighting to be fluorescant or on occupant sensor.Details
1 kitchen: replace cabinets + fixtures. new tile no structural work. 50% of wattage to be fluorescant. bathroom: move sink + toilet, new shower + tile work. replace washer + dryer no structural. lighting to be fluorescant or on occupant sensor. | $24,000 |
| Oct 3, 2007 | Completed final sign-off Feb 2008 | 3887 18th St | bathroom work, toilet , bath, shower, sink moved tile workDetails
bathroom work, toilet , bath, shower, sink moved tile work | |
| Jul 18, 2007 | Completed final sign-off Apr 2008 | 1129 Kirkham St | remodel bathroom @ 1st floor. replace all fixtures & finishes. add new full bathroom in existing closet @ 2nd floor.Details
remodel bathroom @ 1st floor. replace all fixtures & finishes. add new full bathroom in existing closet @ 2nd floor. | $20,000 |
| Jul 3, 2007 | Completed final sign-off Nov 2007 | 1190 Sanchez St | kitchen replace cabinets & appliance, paint, bathroom replace fixtures, tile, paint no lighting change.Details
kitchen replace cabinets & appliance, paint, bathroom replace fixtures, tile, paint no lighting change. | $24,000 |
| Oct 3, 2006 | Completed final sign-off Jun 2007 | 65 Homestead St | move kitchen/dining room wall, rearrange major appliances, remove wall 4th floor, add bathroom.short en 2 walls on main floor 3rd floorDetails
move kitchen/dining room wall, rearrange major appliances, remove wall 4th floor, add bathroom.short en 2 walls on main floor 3rd floor | $280,000 |
| Jan 17, 2006 | Completed final sign-off Jun 2006 | 1140 Stanyan St | remodel 2 (e) kitchens with new cabinets, counter top, sink appliances, refinish floors, paint, lighting. no structural work. remodel 2 (e) bathrooms with new toilet, vanity, lighting and tile no structural work.Details
remodel 2 (e) kitchens with new cabinets, counter top, sink appliances, refinish floors, paint, lighting. no structural work. remodel 2 (e) bathrooms with new toilet, vanity, lighting and tile no structural work. | $50,000 |