Back to bathroom remodel contractors
Meryl & Miller Llc
- Based in
- Alameda
- On San Francisco permits
- Jan 2018 to Aug 2026
- Last 24 months
- 16 permits filed
41 permits since 2000: 33 completed, 1 in progress, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
24 bathroom remodel permits: 20 completed, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 75 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2026 | Completed final sign-off Oct 2026 | 8 Charlton Ct | bathroom remodel in kind. no moving walls. approximately 40 sq ft.Details
bathroom remodel in kind. no moving walls. approximately 40 sq ft. | $12,000 |
| Jul 7, 2026 | Completed final sign-off Sep 2026 | 1684 Mcallister St | kitchen remodel in kind, bathroom & powder remodel in kind, replace lights.Details
kitchen remodel in kind, bathroom & powder remodel in kind, replace lights. | $75,000 |
| Jul 7, 2026 | Completed final sign-off Sep 2026 | 807 York St | bathroom remodel in kind, kitchen remodel in kind, add w/d to unit, replace lights.Details
bathroom remodel in kind, kitchen remodel in kind, add w/d to unit, replace lights. | $70,000 |
| Feb 18, 2026 | Completed final sign-off Apr 2026 | 2139 Green St | unit i: removal of interior walls at kitchen. structural work is included. no expansion of building envelope, no additional sq.ft and no wor to the exterior. kitchen remodel in kind, replace toilets, replace 1 bath vanity, replace lights.Details
unit i: removal of interior walls at kitchen. structural work is included. no expansion of building envelope, no additional sq.ft and no wor to the exterior. kitchen remodel in kind, replace toilets, replace 1 bath vanity, replace lights. | $60,000 |
| Dec 29, 2025 | Completed final sign-off Mar 2026 | 2412 Harrison St | replace lights, kitchen reno in-kind, replace (3) bathroom vanities, replace tile in (1) bath. #106Details
replace lights, kitchen reno in-kind, replace (3) bathroom vanities, replace tile in (1) bath. #106 | $70,000 |
| Dec 10, 2025 | Completed final sign-off Feb 2026 | 8300 Oceanview Tr | unit #203: bathroom remodel in kind.Details
unit #203: bathroom remodel in kind. | $18,000 |
| Nov 24, 2025 | Completed final sign-off Mar 2026 | 342 London St | interior remodel including a (n) 1/2 bathroom next to (e) kitchen on 2nd floor. no structrual work, square footage, and change to building exteriorDetails
interior remodel including a (n) 1/2 bathroom next to (e) kitchen on 2nd floor. no structrual work, square footage, and change to building exterior | $25,000 |
| Nov 14, 2025 | Completed final sign-off Jun 2026 | 405 Hoffman Av | renovate kitchen in kind, renovate powder room in kind, expand bathroom. renovate and add re-used lights in living room and renovate laundry room inkind.Details
renovate kitchen in kind, renovate powder room in kind, expand bathroom. renovate and add re-used lights in living room and renovate laundry room inkind. | $98,000 |
| Nov 5, 2025 | Expired or cancelled cancelled Nov 2025 | 405 Hoffman Av | kitchen counters & appliances replace, bathroom remodel in kind, powder bath remodel in kind, replace lights. (rear building)Details
kitchen counters & appliances replace, bathroom remodel in kind, powder bath remodel in kind, replace lights. (rear building) | $75,000 |
| Jul 7, 2025 | Completed final sign-off Sep 2025 | 223 Divisadero St | kitchen renovation and 2 bathroom renovation in kind, replace knob and tube, replace lights.Details
kitchen renovation and 2 bathroom renovation in kind, replace knob and tube, replace lights. | $50,000 |
| May 20, 2025 | Completed final sign-off Mar 2026 | 55 Ford St | 3rd/fl: remodel existing 3rd floor dwelling including existing kitchen and new bathroom. no additional square footage and no expansion of existing building envelope.Details
3rd/fl: remodel existing 3rd floor dwelling including existing kitchen and new bathroom. no additional square footage and no expansion of existing building envelope. | $85,000 |
| Jan 6, 2025 | Completed final sign-off Mar 2025 | 771 Castro St | 1 kitchen and 1 bathroom remodel like for like. (new counter and cabinets) (new flooring, wall tiles and vanity)Details
1 kitchen and 1 bathroom remodel like for like. (new counter and cabinets) (new flooring, wall tiles and vanity) | $40,000 |
| Aug 14, 2023 | Completed final sign-off Jan 2024 | 1990 Green St | #102: bathroom remodel in kind, new vanity, toilet, tub, floor and shower surround tile , no wall moving and no changing location. all work is non-structural only. no wall/framing modification.Details
#102: bathroom remodel in kind, new vanity, toilet, tub, floor and shower surround tile , no wall moving and no changing location. all work is non-structural only. no wall/framing modification. | $12,000 |
| Jun 21, 2023 | Completed final sign-off Sep 2023 | 443 Broderick St | bathroom remodel of 1/2 bath with bathub and bathroom vanity. remodel in-kind.Details
bathroom remodel of 1/2 bath with bathub and bathroom vanity. remodel in-kind. | $12,000 |
| Jun 4, 2021 | Expired or cancelled cancelled Jan 2026 | 405 Hoffman Av | interior rmeodel of misc spaces including kitchen & bathroom. no structural work, no additoinal sf and no changes to exterior. removal of non-load bearing partitions.Details
interior rmeodel of misc spaces including kitchen & bathroom. no structural work, no additoinal sf and no changes to exterior. removal of non-load bearing partitions. | |
| Mar 19, 2021 | Completed final sign-off Jan 2022 | 3111 24th St | apt b: one kitchen and one bath remodel in kind. replace lights. no new wall and no (e) wall relocation. new plumbing fixtures remain at same location.Details
apt b: one kitchen and one bath remodel in kind. replace lights. no new wall and no (e) wall relocation. new plumbing fixtures remain at same location. | $30,000 |
| Feb 3, 2021 | Completed final sign-off Jan 2022 | 842 30th Av | kitchen remodel in kind, 2 bathroom remodel in kind, powder bath remodel in kind adding recessed cans in lower level office, family room, bedroom nook, level floor in patio, replace tile landing and exterior door at rear.Details
kitchen remodel in kind, 2 bathroom remodel in kind, powder bath remodel in kind adding recessed cans in lower level office, family room, bedroom nook, level floor in patio, replace tile landing and exterior door at rear. | $75,000 |
| Feb 3, 2021 | Never finaled issued Feb 2021, no final | 3039 California St | kitchen renovation in kind, bathroom renovation in kind, light replaced, floors refinished.Details
kitchen renovation in kind, bathroom renovation in kind, light replaced, floors refinished. | $25,000 |
| Oct 23, 2020 | Expired or cancelled withdrawn Apr 2021 | 405 Hoffman Av | powder bath remodel in kind, add showersDetails
powder bath remodel in kind, add showers | $20,000 |
| Nov 4, 2019 | Completed final sign-off Jan 2020 | 1580 Sanchez St | kitchen remodel. replace kitchen cabinets, counters. new appliances, new bathroom vanity, new flooring.Details
kitchen remodel. replace kitchen cabinets, counters. new appliances, new bathroom vanity, new flooring. | $25,000 |
| Mar 28, 2019 | Completed final sign-off Apr 2020 | 1350 Hayes St | interior remodel to an existing 2 story sfd (no expansion of bldg envelope, no additional conditioned sqft)including a kitchen & 2 1/2 baths, all associated plumbing, electrical, & mechanical work. new windows, doors deck/stairway @ the rear, seismic structural retrofitDetails
interior remodel to an existing 2 story sfd (no expansion of bldg envelope, no additional conditioned sqft)including a kitchen & 2 1/2 baths, all associated plumbing, electrical, & mechanical work. new windows, doors deck/stairway @ the rear, seismic structural retrofit | $400,000 |
| Jan 4, 2019 | Completed final sign-off Nov 2019 | 4399 24th St | kitchen and bath renovation in-kind, add w/d. kitchen 5x8 and bath 5x8. kitchen is at 1st flr. w/d in kitchen, exhaust sideweays minimum 10' from sidewalk and 3' from operable windowDetails
kitchen and bath renovation in-kind, add w/d. kitchen 5x8 and bath 5x8. kitchen is at 1st flr. w/d in kitchen, exhaust sideweays minimum 10' from sidewalk and 3' from operable window | $50,000 |
| Aug 2, 2018 | Completed final sign-off Sep 2018 | 3111 24th St | one bathroom & one kitchen remodel: replace bathroom floor, toilet. replace kitchen counters, sink, faucet & appliances. no new wall & no exist'g wall relocation. new lighting in kitchen & bathroom remodel shall comply w/cec 150.0(k)3 & (k)5.Details
one bathroom & one kitchen remodel: replace bathroom floor, toilet. replace kitchen counters, sink, faucet & appliances. no new wall & no exist'g wall relocation. new lighting in kitchen & bathroom remodel shall comply w/cec 150.0(k)3 & (k)5. | $20,000 |
| Feb 20, 2018 | Completed final sign-off Jun 2018 | 401 Hoffman Av | kitchen counters, new/replace lights, bathroom remodel, washer/dryer installation.Details
kitchen counters, new/replace lights, bathroom remodel, washer/dryer installation. | $50,000 |