Meryl & Miller Llc
- Based in
- Alameda
- On San Francisco permits
- Jan 2018 to Aug 2026
- Last 24 months
- 16 permits filed
41 permits since 2000: 33 completed, 1 in progress, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 25 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 28, 2019 | Completed final sign-off Apr 2020 | 1350 Hayes St | interior remodel to an existing 2 story sfd (no expansion of bldg envelope, no additional conditioned sqft)including a kitchen & 2 1/2 baths, all associated plumbing, electrical, & mechanical work. new windows, doors deck/stairway @ the rear, seismic structural retrofitDetails
interior remodel to an existing 2 story sfd (no expansion of bldg envelope, no additional conditioned sqft)including a kitchen & 2 1/2 baths, all associated plumbing, electrical, & mechanical work. new windows, doors deck/stairway @ the rear, seismic structural retrofit | $400,000 |
| Jan 2, 2019 | Completed final sign-off Jan 2019 | 401 Hoffman Av | rot repair at crawl space and under deck. repair in-kind, less than 50% structural work.Details
rot repair at crawl space and under deck. repair in-kind, less than 50% structural work. | $3,000 |