Back to kitchen remodel contractors
Merchant Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2005 to Jan 2016
- Last 24 months
- 0 permits filed
47 permits since 2000: 42 completed, 5 never finaled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 66 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 21, 2013 | Completed final sign-off Jul 2013 | 635 Texas St | soft demo - remove fire/water damaged dry wall in front entry, kitchen, bathroom, office - non-structural work.Details
soft demo - remove fire/water damaged dry wall in front entry, kitchen, bathroom, office - non-structural work. | $40,000 |
| Jan 14, 2013 | Completed final sign-off Apr 2013 | 1432 Palou Av | replace (e) appliances, counter tops, vinyl flooring with new in kitchen. replace (e) electrical lighting & outlets to conform to code. insulate (e) drywall & fireplaces garage walls & ceiling; replace existing heating system. re-surface hardwood flooring, prime & paint living area.Details
replace (e) appliances, counter tops, vinyl flooring with new in kitchen. replace (e) electrical lighting & outlets to conform to code. insulate (e) drywall & fireplaces garage walls & ceiling; replace existing heating system. re-surface hardwood flooring, prime & paint living area. | $10,000 |
| Mar 11, 2011 | Completed final sign-off Mar 2012 | 2298 Pacific Av | unit #8: 8th floor-remodel kitchen, service foyer, dressing tm, master bathroom of the 8th fl unit of a 8 story bldg. work to include full interior remodeling of these spaces including plumbing upgrds, new flooring, cabinets & demo of some non load bearing walls.Details
unit #8: 8th floor-remodel kitchen, service foyer, dressing tm, master bathroom of the 8th fl unit of a 8 story bldg. work to include full interior remodeling of these spaces including plumbing upgrds, new flooring, cabinets & demo of some non load bearing walls. | $20,000 |
| Jul 3, 2009 | Completed final sign-off Aug 2009 | 69 Staples Av | renovate kitchen by installing new cabinets, counter top, back splash, floor and appliances.Details
renovate kitchen by installing new cabinets, counter top, back splash, floor and appliances. | $40,000 |
| Jul 9, 2008 | Completed final sign-off Oct 2008 | 3139 Jackson St | lower unit: remodel kitchen, replace 4 kitchen windows , add 1 new. remove 2 nw ktchen windows. replace 2 exist dining rm windows with new, add 2 new interior doors, replace ex stairwell door, relocate laundry, replace ceiling in family rm,dining rm,hall,kitchen. structural strengthening work only.Details
lower unit: remodel kitchen, replace 4 kitchen windows , add 1 new. remove 2 nw ktchen windows. replace 2 exist dining rm windows with new, add 2 new interior doors, replace ex stairwell door, relocate laundry, replace ceiling in family rm,dining rm,hall,kitchen. structural strengthening work only. | $90,000 |
| Jan 24, 2007 | Completed final sign-off Feb 2007 | 712 Oak St | kitchen & bathroom remodel, replace front stairway in kind. rear stair way, less than 50%Details
kitchen & bathroom remodel, replace front stairway in kind. rear stair way, less than 50% | $25,000 |