Back to bathroom remodel contractors
Merchant Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2005 to Jan 2016
- Last 24 months
- 0 permits filed
47 permits since 2000: 42 completed, 5 never finaled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 9 completed. Typically 0 days from filing to permit and 43 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2015 | Completed final sign-off Sep 2015 | 601 04th St | #319 - remove existing tile & shower valve in guest bathroom & replace with new.Details
#319 - remove existing tile & shower valve in guest bathroom & replace with new. | $12,000 |
| Jun 21, 2013 | Completed final sign-off Jul 2013 | 635 Texas St | soft demo - remove fire/water damaged dry wall in front entry, kitchen, bathroom, office - non-structural work.Details
soft demo - remove fire/water damaged dry wall in front entry, kitchen, bathroom, office - non-structural work. | $40,000 |
| Mar 22, 2012 | Completed final sign-off Jul 2012 | 3027 Buchanan St | interior bath remodel of (e) full bath and (e) half bath on street level.Details
interior bath remodel of (e) full bath and (e) half bath on street level. | $18,000 |
| Mar 11, 2011 | Completed final sign-off Mar 2012 | 2298 Pacific Av | unit #8: 8th floor-remodel kitchen, service foyer, dressing tm, master bathroom of the 8th fl unit of a 8 story bldg. work to include full interior remodeling of these spaces including plumbing upgrds, new flooring, cabinets & demo of some non load bearing walls.Details
unit #8: 8th floor-remodel kitchen, service foyer, dressing tm, master bathroom of the 8th fl unit of a 8 story bldg. work to include full interior remodeling of these spaces including plumbing upgrds, new flooring, cabinets & demo of some non load bearing walls. | $20,000 |
| Sep 9, 2010 | Completed final sign-off May 2011 | 2298 Pacific Av | replace existing tile in guest bathroom and powder room: replace existing shower valve for shower/tub in guest bathroom: replace existing pedestal sink with new in powder room: replace existing wet bar with coat closetDetails
replace existing tile in guest bathroom and powder room: replace existing shower valve for shower/tub in guest bathroom: replace existing pedestal sink with new in powder room: replace existing wet bar with coat closet | $10,000 |
| Sep 21, 2009 | Completed final sign-off Nov 2009 | 1266 08th Av | comply w/ physical inspection report #cc5607 - update electrical & plumbing violations, to legalize a bathroom on the 4th floor of a second unit in a 2 unit bldg.Details
comply w/ physical inspection report #cc5607 - update electrical & plumbing violations, to legalize a bathroom on the 4th floor of a second unit in a 2 unit bldg. | $7,500 |
| Mar 21, 2008 | Completed final sign-off Apr 2008 | 276 States St | demoish 2nd floor (e) bathroom to create a walk in closet (location is the attic floor front bathroom)Details
demoish 2nd floor (e) bathroom to create a walk in closet (location is the attic floor front bathroom) | $15,000 |
| Jan 24, 2007 | Completed final sign-off Feb 2007 | 712 Oak St | kitchen & bathroom remodel, replace front stairway in kind. rear stair way, less than 50%Details
kitchen & bathroom remodel, replace front stairway in kind. rear stair way, less than 50% | $25,000 |
| Oct 10, 2006 | Completed final sign-off Apr 2007 | 2565 Larkin St | 2nd floor bathroom remodel. no structural work. flourescent fixtures or detectorDetails
2nd floor bathroom remodel. no structural work. flourescent fixtures or detector | $20,000 |