Back to kitchen remodel contractors
Meadows Green Building & Design Inc
- Based in
- San Rafael
- On San Francisco permits
- Sep 2009 to Sep 2024
- Last 24 months
- 0 permits filed
19 permits since 2000: 16 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 4 days from filing to permit and 574 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 25, 2018 | Completed final sign-off Jun 2018 | 4810 17th St | additional work added to pa 2018-0320-4175 - add new windwo with 4x10 header at (e) kitchen (not visible from st). new tile @ (e) shower (n) window > 5 wide st. typical from & header assembly with trim studsDetails
additional work added to pa 2018-0320-4175 - add new windwo with 4x10 header at (e) kitchen (not visible from st). new tile @ (e) shower (n) window > 5 wide st. typical from & header assembly with trim studs | $10,000 |
| Mar 20, 2018 | Completed final sign-off Jun 2018 | 4810 17th St | remodel existing kitchen, add led recessed lights. replace existing cabinets, counters, fixtuers, faucet, add fan at existing bath, replace existing window in bath with new insert unit, no change to size or location. remodel in kind.Details
remodel existing kitchen, add led recessed lights. replace existing cabinets, counters, fixtuers, faucet, add fan at existing bath, replace existing window in bath with new insert unit, no change to size or location. remodel in kind. | $40,000 |
| Oct 30, 2015 | Completed final sign-off Jun 2020 | 1350 46th Av | vertical & horizontal addition. interior work incl addition of 3 bedrooms, 2 bathrooms along w/ renovation of kitchen&living room.a stair will be built to connect all floors and roof.Details
vertical & horizontal addition. interior work incl addition of 3 bedrooms, 2 bathrooms along w/ renovation of kitchen&living room.a stair will be built to connect all floors and roof. | $350,000 |
| Feb 27, 2015 | Completed final sign-off Feb 2018 | 2570 Folsom St | interior remodel of kitchen, master bedroom and bath including new plumbing fixtures, light fixtures, appliances & finishes, new windows and doors on rear and south facing facade. new heating and hot water system for whole house.Details
interior remodel of kitchen, master bedroom and bath including new plumbing fixtures, light fixtures, appliances & finishes, new windows and doors on rear and south facing facade. new heating and hot water system for whole house. | $150,000 |