Back to bathroom remodel contractors
Meadows Green Building & Design Inc
- Based in
- San Rafael
- On San Francisco permits
- Sep 2009 to Sep 2024
- Last 24 months
- 0 permits filed
19 permits since 2000: 16 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 7 days from filing to permit and 167 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 20, 2018 | Completed final sign-off Jun 2018 | 4810 17th St | remodel existing kitchen, add led recessed lights. replace existing cabinets, counters, fixtuers, faucet, add fan at existing bath, replace existing window in bath with new insert unit, no change to size or location. remodel in kind.Details
remodel existing kitchen, add led recessed lights. replace existing cabinets, counters, fixtuers, faucet, add fan at existing bath, replace existing window in bath with new insert unit, no change to size or location. remodel in kind. | $40,000 |
| Jul 1, 2016 | Completed final sign-off Aug 2017 | 16 Short St | remodel (e) bath on 2nd fl, infill (e) lightwell 7' vertical & 10' horizontalDetails
remodel (e) bath on 2nd fl, infill (e) lightwell 7' vertical & 10' horizontal | $60,000 |
| Oct 30, 2015 | Completed final sign-off Jun 2020 | 1350 46th Av | vertical & horizontal addition. interior work incl addition of 3 bedrooms, 2 bathrooms along w/ renovation of kitchen&living room.a stair will be built to connect all floors and roof.Details
vertical & horizontal addition. interior work incl addition of 3 bedrooms, 2 bathrooms along w/ renovation of kitchen&living room.a stair will be built to connect all floors and roof. | $350,000 |
| Feb 27, 2015 | Completed final sign-off Feb 2018 | 2570 Folsom St | interior remodel of kitchen, master bedroom and bath including new plumbing fixtures, light fixtures, appliances & finishes, new windows and doors on rear and south facing facade. new heating and hot water system for whole house.Details
interior remodel of kitchen, master bedroom and bath including new plumbing fixtures, light fixtures, appliances & finishes, new windows and doors on rear and south facing facade. new heating and hot water system for whole house. | $150,000 |
| Dec 19, 2014 | Completed final sign-off Mar 2017 | 4633 19th St | horizontal addition. family room & 1/2 bath addition.Details
horizontal addition. family room & 1/2 bath addition. | $225,000 |
| Apr 8, 2014 | Completed final sign-off Sep 2014 | 3858 Jackson St | new bath, closet/room remodel and minor addition (new closet in extg lightwell)Details
new bath, closet/room remodel and minor addition (new closet in extg lightwell) | $70,000 |
| Nov 16, 2012 | Completed final sign-off Jan 2013 | 763 De Haro St | existing bath remodel with new electrical/plumbing & finishes new fixtures and new lightingDetails
existing bath remodel with new electrical/plumbing & finishes new fixtures and new lighting | $35,000 |