Back to bathroom remodel contractors
Mcguinness Mccann Group
- Based in
- San Francisco
- On San Francisco permits
- Apr 2021 to Jul 2026
- Last 24 months
- 26 permits filed
77 permits since 2000: 47 completed, 21 in progress, 3 never finaled, 6 expired or cancelled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 9 completed, 3 in progress, 2 expired or cancelled. Typically 0 days from filing to permit and 286 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 26, 2025 | In progress issued Aug 2025 | 3645 Washington St | replace foundation, excavate (e) basement and crawl space for additional habitable space including a mudroom, bedroom, bathroom and living space.Details
replace foundation, excavate (e) basement and crawl space for additional habitable space including a mudroom, bedroom, bathroom and living space. | $213,462 |
| Oct 9, 2024 | In progress issued Oct 2024 | 2030 Fell St | unit 2- replace all finishes and fixtures in the bathroom and kitchen in kind no wall removalDetails
unit 2- replace all finishes and fixtures in the bathroom and kitchen in kind no wall removal | $20,000 |
| Jul 2, 2024 | In progress issued Jul 2024 | 406 Funston Av | remodel a kitchen, 1 bathroom and 1 half bath. finishes only no structural. plumbing and electrical by owner's subs.Details
remodel a kitchen, 1 bathroom and 1 half bath. finishes only no structural. plumbing and electrical by owner's subs. | $50,000 |
| May 8, 2024 | Completed final sign-off Nov 2024 | 85 Roosevelt Wy | unit #1: remodel of (e) bathroom + kitchen no structural work. new flooring throughout. plumbing + electrical by others.Details
unit #1: remodel of (e) bathroom + kitchen no structural work. new flooring throughout. plumbing + electrical by others. | $65,000 |
| Apr 22, 2024 | Completed final sign-off Jan 2025 | 20 Cotter St | remodel bathroom. no structural. replace 3 rear windows in kind (not visible from the street)Details
remodel bathroom. no structural. replace 3 rear windows in kind (not visible from the street) | $30,000 |
| Feb 21, 2024 | Completed final sign-off Sep 2024 | 70 Hartford St | replace all finishes and fixtures in (2) bathrooms. no structural work. no plumbing moving. no layout changes.Details
replace all finishes and fixtures in (2) bathrooms. no structural work. no plumbing moving. no layout changes. | $30,000 |
| Jul 20, 2023 | Completed final sign-off May 2024 | 2760 Bush St | bathroom remodel- new shower/ tube tile new shower glass- plumbing and electrical by others. no removal of wallsDetails
bathroom remodel- new shower/ tube tile new shower glass- plumbing and electrical by others. no removal of walls | $50,000 |
| Mar 29, 2023 | Completed final sign-off Jan 2024 | 403 Filbert St | change out all finishes in unit 403, 1 bathroom and 1 kitchen. no change in layouts, new floor coverings, and tiles. plumbing and electrical by others. new cabinets, sinks, toilet, shower etc.Details
change out all finishes in unit 403, 1 bathroom and 1 kitchen. no change in layouts, new floor coverings, and tiles. plumbing and electrical by others. new cabinets, sinks, toilet, shower etc. | $28,000 |
| Oct 14, 2022 | Expired or cancelled expired Feb 2025 | 1931 Lyon St | replace roofing at sloped and low slope roofs, reconfigure drains, insulate roof install new heat pump sytem at roof w/access hatch (will serve top story only) replace kitchen skylight(s) at (e) opening, add 2 sklights at (e) m.bath & powder, replace 2 rear exterior doors at top storyDetails
replace roofing at sloped and low slope roofs, reconfigure drains, insulate roof install new heat pump sytem at roof w/access hatch (will serve top story only) replace kitchen skylight(s) at (e) opening, add 2 sklights at (e) m.bath & powder, replace 2 rear exterior doors at top story | $10,000 |
| Aug 5, 2022 | Completed final sign-off Sep 2023 | 411 Teresita Bl | new post/beams/footings @ basement & 1/f. 3/f: remodel kitchen & bath, replace furnace w/ductless heat pump. enclose lightwell & light court (both central) to condition space, 1 new skylight & new roofing. create new closet @ 2/f hall, add 1 door (20 min f/rated selfclosed) @ back of gaage,Details
new post/beams/footings @ basement & 1/f. 3/f: remodel kitchen & bath, replace furnace w/ductless heat pump. enclose lightwell & light court (both central) to condition space, 1 new skylight & new roofing. create new closet @ 2/f hall, add 1 door (20 min f/rated selfclosed) @ back of gaage, | $40,000 |
| Aug 3, 2022 | Completed final sign-off Sep 2023 | 1931 Lyon St | remodel 1 fullb athroom & 1/2 bathroom at 2/f. cover over glass block at interior side of msater shower. no structural & no exterior facade changes.Details
remodel 1 fullb athroom & 1/2 bathroom at 2/f. cover over glass block at interior side of msater shower. no structural & no exterior facade changes. | $30,000 |
| May 2, 2022 | Expired or cancelled withdrawn Mar 2025 | 226 Rutledge St | replace/reconfigure all windows/doors, replace siding w/stucco. (1) fire rated window(ab-009). new hvac+water heater. new steps to rear room w/new connecting hall. replace rotted deck+rated railings @ rear yard. (3) remodeled & (1/2) new bathroom, (1) kitchen remodel, (1) new laundryDetails
replace/reconfigure all windows/doors, replace siding w/stucco. (1) fire rated window(ab-009). new hvac+water heater. new steps to rear room w/new connecting hall. replace rotted deck+rated railings @ rear yard. (3) remodeled & (1/2) new bathroom, (1) kitchen remodel, (1) new laundry | $300,000 |
| Mar 18, 2022 | Completed final sign-off Feb 2023 | 161 06th Av | (2) bath remodel on 3/f, electrical, plumbing scope. not visible from prow, no structural.Details
(2) bath remodel on 3/f, electrical, plumbing scope. not visible from prow, no structural. | $20,000 |
| Apr 15, 2021 | Completed final sign-off Nov 2022 | 30 Loma Vista Tr | 2 bathroom remodels in-kind. bath 1: 54 sqft, new tub/shower, vanity, toilet. bath 2: 55 sqft, new curbed shower, vanity, toilet.Details
2 bathroom remodels in-kind. bath 1: 54 sqft, new tub/shower, vanity, toilet. bath 2: 55 sqft, new curbed shower, vanity, toilet. | $29,000 |