Mcguinness Mccann Group
- Based in
- San Francisco
- On San Francisco permits
- Apr 2021 to Jul 2026
- Last 24 months
- 26 permits filed
77 permits since 2000: 47 completed, 21 in progress, 3 never finaled, 6 expired or cancelled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 3 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 55 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 18, 2024 | Completed final sign-off Oct 2024 | 2168 Fell St | remove and replace in kind front rotted siding and stucco and some framing around the windows. replace windows and deck doors in kind. front facade work only.Details
remove and replace in kind front rotted siding and stucco and some framing around the windows. replace windows and deck doors in kind. front facade work only. | $40,000 |
| Jun 6, 2023 | Completed final sign-off Jun 2023 | 2565 Sacramento St | replace some handrail/handrail post on rear deck in kind, 50% or less, due to dryrot, replace section of front siding/side alley door, 10 foot section of fence on front garden. fence less than or equal 6 ft tall.Details
replace some handrail/handrail post on rear deck in kind, 50% or less, due to dryrot, replace section of front siding/side alley door, 10 foot section of fence on front garden. fence less than or equal 6 ft tall. | $7,500 |
| Aug 12, 2022 | Completed final sign-off Oct 2022 | 192 Downey St | replace rear deck boards in kind (on 2nd flr), with azek composite boards. no structural. work on 2nd floorDetails
replace rear deck boards in kind (on 2nd flr), with azek composite boards. no structural. work on 2nd floor | $8,000 |
| May 2, 2022 | Expired or cancelled withdrawn Mar 2025 | 226 Rutledge St | replace/reconfigure all windows/doors, replace siding w/stucco. (1) fire rated window(ab-009). new hvac+water heater. new steps to rear room w/new connecting hall. replace rotted deck+rated railings @ rear yard. (3) remodeled & (1/2) new bathroom, (1) kitchen remodel, (1) new laundryDetails
replace/reconfigure all windows/doors, replace siding w/stucco. (1) fire rated window(ab-009). new hvac+water heater. new steps to rear room w/new connecting hall. replace rotted deck+rated railings @ rear yard. (3) remodeled & (1/2) new bathroom, (1) kitchen remodel, (1) new laundry | $300,000 |