Mc Gowan Builders
- Based in
- Burlingame
- On San Francisco permits
- Oct 2010 to Jun 2026
- Last 24 months
- 8 permits filed
94 permits since 2000: 74 completed, 5 in progress, 7 never finaled, 8 expired or cancelled.
Of the 7 never-finaled permits, 4 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
22 kitchen remodel permits: 15 completed, 2 in progress, 4 never finaled, 1 expired or cancelled. Typically 13 days from filing to permit and 421 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2026 | In progress issued Jun 2026 | 167 Bonview St | 1st/f-partial new foundation. excavate 19 cu.yds for slab & footings. convert 386sf of garage to jadu & stairwell.2nd/f-remodel kitchen & dining, relocate bath, add stairwell & steps to rear yard.3rd/f-restructure & raise part of roof to enclose 2 bdrms, 1 bath & 2 decks.front facade- remove...Details
1st/f-partial new foundation. excavate 19 cu.yds for slab & footings. convert 386sf of garage to jadu & stairwell.2nd/f-remodel kitchen & dining, relocate bath, add stairwell & steps to rear yard.3rd/f-restructure & raise part of roof to enclose 2 bdrms, 1 bath & 2 decks.front facade- remove... | $867,500 |
| Jul 18, 2024 | Completed final sign-off Sep 2025 | 537 Grove St | all floors: interior only renovation. 1/f: new millwork. 2/f: reconfigure (e) bath and (e) kitchen, new fireplace and cabinets. 3/f: remove (e) bath. reconfigure (e) bath and laundry. new fixtures and finishes.Details
all floors: interior only renovation. 1/f: new millwork. 2/f: reconfigure (e) bath and (e) kitchen, new fireplace and cabinets. 3/f: remove (e) bath. reconfigure (e) bath and laundry. new fixtures and finishes. | $70,000 |
| Jul 5, 2022 | In progress issued Jan 2024 | 1751 48th Av | horizontal addition; 263 sq ft ground floor addition & 114 sq ft 2nd floor addition at the rear. convert 410 sq ft of (e) storage/garage to habitable space. remodel existing residence per plans. add new bathroom on ground and 2nd floor. remodel (e) kitchen, dining and living room. reconfigure frontDetails
horizontal addition; 263 sq ft ground floor addition & 114 sq ft 2nd floor addition at the rear. convert 410 sq ft of (e) storage/garage to habitable space. remodel existing residence per plans. add new bathroom on ground and 2nd floor. remodel (e) kitchen, dining and living room. reconfigure front | $250,000 |
| Jan 6, 2022 | Completed final sign-off Jun 2026 | 1414 06th Av | vertical addition. 2nd fl: (n) library, powder rm, kitchen & dining rm, & rear deck. new 3rd fl: (n) 3 bedrooms, bath, master suite & rear deck. roof: (n) skylightsDetails
vertical addition. 2nd fl: (n) library, powder rm, kitchen & dining rm, & rear deck. new 3rd fl: (n) 3 bedrooms, bath, master suite & rear deck. roof: (n) skylights | $275,000 |
| Aug 31, 2020 | Completed final sign-off Feb 2024 | 210 Chattanooga St | rear addition and renovation of the existing kitchen, bath and dining room. new area includes half bath, two bedrooms and two bathrooms.Details
rear addition and renovation of the existing kitchen, bath and dining room. new area includes half bath, two bedrooms and two bathrooms. | $500,000 |
| Sep 27, 2019 | Completed final sign-off Jul 2021 | 119 Forest Side Av | rear horizontal addition. 1st floor: new bedroom, master suite, dressing area & bath. 2nd floor: new bath, kitchen, sitting area & roofdeck. new interior stair connecting 1st and 2nd floor.Details
rear horizontal addition. 1st floor: new bedroom, master suite, dressing area & bath. 2nd floor: new bath, kitchen, sitting area & roofdeck. new interior stair connecting 1st and 2nd floor. | $175,000 |
| May 11, 2018 | Completed final sign-off Nov 2020 | 2390 Hyde St | on 2nd floor - unit b - interior work only. new kitchen, new master bath; new guest bath new finishes throughout. new lighting.Details
on 2nd floor - unit b - interior work only. new kitchen, new master bath; new guest bath new finishes throughout. new lighting. | $350,000 |
| Jun 12, 2017 | Never finaled issued Jun 2017, no final | 1627 22nd Av | remodel (e) kitchen; reconfigure (e) bathroom, add sink to (e) water closet; new lighting, electrical, & radiant heat system.Details
remodel (e) kitchen; reconfigure (e) bathroom, add sink to (e) water closet; new lighting, electrical, & radiant heat system. | $50,000 |
| Jun 5, 2017 | Completed final sign-off May 2018 | 1916 Great Hy | convert 357 sq ft of ground floor storage to bedroom, bath and closet. remove walls between kitchen, stair, and living room. remodel kitchen, relocate bathroom and reconfigure bedroom on 2nd floor. new lighting and electrical on ground and 2nd floor.Details
convert 357 sq ft of ground floor storage to bedroom, bath and closet. remove walls between kitchen, stair, and living room. remodel kitchen, relocate bathroom and reconfigure bedroom on 2nd floor. new lighting and electrical on ground and 2nd floor. | $100,000 |
| May 23, 2017 | Completed final sign-off Jul 2020 | 727 Andover St | remodel of kitchen & bath & add 1 bath @ 2nd floor. add new stair from 1st to 2nd floor, add 1 bath @ garage. lower floor elevation @ 1st floor approx 6-12" for new 8' ceiling height. repair rear pop-out in-kind.Details
remodel of kitchen & bath & add 1 bath @ 2nd floor. add new stair from 1st to 2nd floor, add 1 bath @ garage. lower floor elevation @ 1st floor approx 6-12" for new 8' ceiling height. repair rear pop-out in-kind. | $150,000 |
| May 3, 2017 | Completed final sign-off Dec 2017 | 1843 Church St | interior renovation @ 3rd floor unit - new powder room, closets, laundry room & kitchen renovation, new lighting in bedrooms.Details
interior renovation @ 3rd floor unit - new powder room, closets, laundry room & kitchen renovation, new lighting in bedrooms. | $12,000 |
| Apr 14, 2017 | Never finaled issued Apr 2017, no final | 727 Andover St | revision to pa# 201702179676. demo all kitchen, dining room & living room. lath & plaster & drywall treat dryrot damage & make nec repairs. no work to existing envelople & no structural work.Details
revision to pa# 201702179676. demo all kitchen, dining room & living room. lath & plaster & drywall treat dryrot damage & make nec repairs. no work to existing envelople & no structural work. | $8,000 |
| Feb 17, 2017 | Never finaled issued Feb 2017, no final | 727 Andover St | dry wall repair work in kitchen, dining room, area, all work in kind no work visible to the streetDetails
dry wall repair work in kitchen, dining room, area, all work in kind no work visible to the street | $1,000 |
| Aug 26, 2016 | Completed final sign-off Feb 2020 | 139 Pfeiffer St | add upper 3rd floor and roof deck. interior kitchen & bath remodel on the 1st & 2nd floor. new steel frame at garage, new exterior siding & windows.Details
add upper 3rd floor and roof deck. interior kitchen & bath remodel on the 1st & 2nd floor. new steel frame at garage, new exterior siding & windows. | $350,000 |
| Aug 25, 2016 | Completed final sign-off Nov 2017 | 135 Castro St | reconfigure (e) kitchen, pantry and powder room. replace fixtures, vanity and tile in (e) bathroom. new lighting, elect & plumbing in kitchen, powder room and bathroomDetails
reconfigure (e) kitchen, pantry and powder room. replace fixtures, vanity and tile in (e) bathroom. new lighting, elect & plumbing in kitchen, powder room and bathroom | $50,000 |
| Apr 26, 2016 | Completed final sign-off May 2018 | 777 Faxon Av | convert 352 sq.ft. of (e) basment to bedroom, bathroom & laundry room. add windows in (n) downstairs bedroom, reconfigure window in (e) stair, reconfigure (e) kitchen, add (n) landing & stair to bedroom. no work visible from street.Details
convert 352 sq.ft. of (e) basment to bedroom, bathroom & laundry room. add windows in (n) downstairs bedroom, reconfigure window in (e) stair, reconfigure (e) kitchen, add (n) landing & stair to bedroom. no work visible from street. | $80,000 |
| Jul 29, 2015 | Never finaled issued Jul 2015, no final | 1171 Oak St | unit 2: remove interior wall between kitchen and office, remodel existing kitchen and baths, add exterior patior door and new rear deck. new lighting, elec work. rear deck less than 18" from natural grade. new ul listed direct vent gas fireplace.Details
unit 2: remove interior wall between kitchen and office, remodel existing kitchen and baths, add exterior patior door and new rear deck. new lighting, elec work. rear deck less than 18" from natural grade. new ul listed direct vent gas fireplace. | $200,000 |
| Jun 19, 2015 | Expired or cancelled expired Mar 2018 | 1861 Pine St | remodel (e) unit including demolition & construction. new outlet & light fixtures @ 1/f, convert (e) storage space to new living space with new bath, family & laundry. 2/f: remodel kitchen. 3/f: remodel bathroom.Details
remodel (e) unit including demolition & construction. new outlet & light fixtures @ 1/f, convert (e) storage space to new living space with new bath, family & laundry. 2/f: remodel kitchen. 3/f: remodel bathroom. | $10,000 |
| Mar 4, 2015 | Completed final sign-off Jul 2015 | 1629 Shafter Av | remodel kitchenDetails
remodel kitchen | $30,000 |
| Feb 19, 2015 | Completed final sign-off Jan 2016 | 1310 Page St | remodel kitchen, bath powder room 2nd flDetails
remodel kitchen, bath powder room 2nd fl | $225,000 |
| Jun 2, 2014 | Completed final sign-off Sep 2014 | 1412 Mcallister St | interior remodel of kitchen & bathroom.Details
interior remodel of kitchen & bathroom. | $45,000 |
| Dec 10, 2013 | Completed final sign-off Jun 2014 | 311 Crescent Av | interior remodeling on 2nd floor. remodel extg kitechen bath and add new 1/2 bathroom on 2nd floor, remove kitchen walls for open floor plan.Details
interior remodeling on 2nd floor. remodel extg kitechen bath and add new 1/2 bathroom on 2nd floor, remove kitchen walls for open floor plan. | $40,000 |