Back to bathroom remodel contractors
Mc Gowan Builders
- Based in
- Burlingame
- On San Francisco permits
- Oct 2010 to Jun 2026
- Last 24 months
- 8 permits filed
94 permits since 2000: 74 completed, 5 in progress, 7 never finaled, 8 expired or cancelled.
Of the 7 never-finaled permits, 4 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
32 bathroom remodel permits: 24 completed, 3 in progress, 3 never finaled, 2 expired or cancelled. Typically 28 days from filing to permit and 322 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2026 | In progress issued Jul 2026 | 820 Ortega St | convert 497 sq ft of 1st floor storage area to habitable space. enclose existing interior stair. remodel existing 1st floor bathroom. plumbing and electrical work in remodeled area.Details
convert 497 sq ft of 1st floor storage area to habitable space. enclose existing interior stair. remodel existing 1st floor bathroom. plumbing and electrical work in remodeled area. | $65,000 |
| Jan 14, 2026 | In progress issued Jun 2026 | 167 Bonview St | 1st/f-partial new foundation. excavate 19 cu.yds for slab & footings. convert 386sf of garage to jadu & stairwell.2nd/f-remodel kitchen & dining, relocate bath, add stairwell & steps to rear yard.3rd/f-restructure & raise part of roof to enclose 2 bdrms, 1 bath & 2 decks.front facade- remove...Details
1st/f-partial new foundation. excavate 19 cu.yds for slab & footings. convert 386sf of garage to jadu & stairwell.2nd/f-remodel kitchen & dining, relocate bath, add stairwell & steps to rear yard.3rd/f-restructure & raise part of roof to enclose 2 bdrms, 1 bath & 2 decks.front facade- remove... | $867,500 |
| Nov 20, 2024 | Completed final sign-off Apr 2026 | 1916 Great Hy | revision to permit #202108065980.reduce size of primary bed with small job in wall near top of stairs.swap locations for primary bath & closet.change door to primary bed to pocket door.remove skylight in primary closet.revise stairs & reduce number of stair risers to 16 instead of 17.Details
revision to permit #202108065980.reduce size of primary bed with small job in wall near top of stairs.swap locations for primary bath & closet.change door to primary bed to pocket door.remove skylight in primary closet.revise stairs & reduce number of stair risers to 16 instead of 17. | $5,000 |
| Jul 31, 2024 | Expired or cancelled expired Jun 2026 | 1414 06th Av | revision to pa#202201065454. 3rd floor: m. bath and bed 2 & bath reconfiguration. replace exterior front stair and 2nd floor bay window in kind. remove exterior rear yard stair.Details
revision to pa#202201065454. 3rd floor: m. bath and bed 2 & bath reconfiguration. replace exterior front stair and 2nd floor bay window in kind. remove exterior rear yard stair. | $5,000 |
| Jul 18, 2024 | Completed final sign-off Sep 2025 | 537 Grove St | all floors: interior only renovation. 1/f: new millwork. 2/f: reconfigure (e) bath and (e) kitchen, new fireplace and cabinets. 3/f: remove (e) bath. reconfigure (e) bath and laundry. new fixtures and finishes.Details
all floors: interior only renovation. 1/f: new millwork. 2/f: reconfigure (e) bath and (e) kitchen, new fireplace and cabinets. 3/f: remove (e) bath. reconfigure (e) bath and laundry. new fixtures and finishes. | $70,000 |
| Jul 5, 2022 | In progress issued Jan 2024 | 1751 48th Av | horizontal addition; 263 sq ft ground floor addition & 114 sq ft 2nd floor addition at the rear. convert 410 sq ft of (e) storage/garage to habitable space. remodel existing residence per plans. add new bathroom on ground and 2nd floor. remodel (e) kitchen, dining and living room. reconfigure frontDetails
horizontal addition; 263 sq ft ground floor addition & 114 sq ft 2nd floor addition at the rear. convert 410 sq ft of (e) storage/garage to habitable space. remodel existing residence per plans. add new bathroom on ground and 2nd floor. remodel (e) kitchen, dining and living room. reconfigure front | $250,000 |
| Jan 6, 2022 | Completed final sign-off Jun 2026 | 1414 06th Av | vertical addition. 2nd fl: (n) library, powder rm, kitchen & dining rm, & rear deck. new 3rd fl: (n) 3 bedrooms, bath, master suite & rear deck. roof: (n) skylightsDetails
vertical addition. 2nd fl: (n) library, powder rm, kitchen & dining rm, & rear deck. new 3rd fl: (n) 3 bedrooms, bath, master suite & rear deck. roof: (n) skylights | $275,000 |
| Jan 21, 2021 | Completed final sign-off Dec 2022 | 524 Moultrie St | convert 406sf of (e) storage on 1/f to habitale space. add new stair from 1/f to 2/f. reconfig powder room on 2/f (ref pa 201904127879). reconfig bathrooms and add laundry on 3/f (ref pa 201904127879). no wet bar allowed on ground floor.Details
convert 406sf of (e) storage on 1/f to habitale space. add new stair from 1/f to 2/f. reconfig powder room on 2/f (ref pa 201904127879). reconfig bathrooms and add laundry on 3/f (ref pa 201904127879). no wet bar allowed on ground floor. | $25,000 |
| Oct 6, 2020 | Completed final sign-off Jul 2021 | 119 Forest Side Av | revision to pa 201909272931. extend 2nd flr deck cantilever 3' ft into rear yard. (n) concrete steps at side yard. remove fireplace, firebox, chimney. revise 2nd flr structure at bathroom.Details
revision to pa 201909272931. extend 2nd flr deck cantilever 3' ft into rear yard. (n) concrete steps at side yard. remove fireplace, firebox, chimney. revise 2nd flr structure at bathroom. | $12,000 |
| Aug 31, 2020 | Completed final sign-off Feb 2024 | 210 Chattanooga St | rear addition and renovation of the existing kitchen, bath and dining room. new area includes half bath, two bedrooms and two bathrooms.Details
rear addition and renovation of the existing kitchen, bath and dining room. new area includes half bath, two bedrooms and two bathrooms. | $500,000 |
| Jul 20, 2020 | Completed final sign-off Nov 2023 | 1515 Shrader St | widen (e) garage door, reconfigure planter and driveway apron within property, remodel (e) 3rd fl. bathroom, (n) plumbing and electrical in remodeled bathroom.Details
widen (e) garage door, reconfigure planter and driveway apron within property, remodel (e) 3rd fl. bathroom, (n) plumbing and electrical in remodeled bathroom. | $20,000 |
| Sep 27, 2019 | Completed final sign-off Jul 2021 | 119 Forest Side Av | rear horizontal addition. 1st floor: new bedroom, master suite, dressing area & bath. 2nd floor: new bath, kitchen, sitting area & roofdeck. new interior stair connecting 1st and 2nd floor.Details
rear horizontal addition. 1st floor: new bedroom, master suite, dressing area & bath. 2nd floor: new bath, kitchen, sitting area & roofdeck. new interior stair connecting 1st and 2nd floor. | $175,000 |
| May 29, 2018 | Never finaled issued May 2018, no final | 370 Shotwell St | 1 bathroom remodel. relocate laundry unitDetails
1 bathroom remodel. relocate laundry unit | $25,000 |
| May 11, 2018 | Completed final sign-off Nov 2020 | 2390 Hyde St | on 2nd floor - unit b - interior work only. new kitchen, new master bath; new guest bath new finishes throughout. new lighting.Details
on 2nd floor - unit b - interior work only. new kitchen, new master bath; new guest bath new finishes throughout. new lighting. | $350,000 |
| Oct 10, 2017 | Completed final sign-off May 2018 | 1916 Great Hy | revision to pa 2017-0605-8418 - replace windows and doors on front facade, revise windows in master bath. replace stucco on front facade, (n) balcony on front facade, revise lighting in residenceDetails
revision to pa 2017-0605-8418 - replace windows and doors on front facade, revise windows in master bath. replace stucco on front facade, (n) balcony on front facade, revise lighting in residence | $10,000 |
| Jun 12, 2017 | Never finaled issued Jun 2017, no final | 1627 22nd Av | remodel (e) kitchen; reconfigure (e) bathroom, add sink to (e) water closet; new lighting, electrical, & radiant heat system.Details
remodel (e) kitchen; reconfigure (e) bathroom, add sink to (e) water closet; new lighting, electrical, & radiant heat system. | $50,000 |
| Jun 5, 2017 | Completed final sign-off May 2018 | 1916 Great Hy | convert 357 sq ft of ground floor storage to bedroom, bath and closet. remove walls between kitchen, stair, and living room. remodel kitchen, relocate bathroom and reconfigure bedroom on 2nd floor. new lighting and electrical on ground and 2nd floor.Details
convert 357 sq ft of ground floor storage to bedroom, bath and closet. remove walls between kitchen, stair, and living room. remodel kitchen, relocate bathroom and reconfigure bedroom on 2nd floor. new lighting and electrical on ground and 2nd floor. | $100,000 |
| May 23, 2017 | Completed final sign-off Jul 2020 | 727 Andover St | remodel of kitchen & bath & add 1 bath @ 2nd floor. add new stair from 1st to 2nd floor, add 1 bath @ garage. lower floor elevation @ 1st floor approx 6-12" for new 8' ceiling height. repair rear pop-out in-kind.Details
remodel of kitchen & bath & add 1 bath @ 2nd floor. add new stair from 1st to 2nd floor, add 1 bath @ garage. lower floor elevation @ 1st floor approx 6-12" for new 8' ceiling height. repair rear pop-out in-kind. | $150,000 |
| Apr 5, 2017 | Completed final sign-off Jan 2021 | 2390 48th Av | revision to pa #201603222686 - add toilet & hand sink to garage storage space. add wall with door in entry. move door from garage to storage/entry. relocate washer/dryer to upper unit. chnage window configuration on front facade. remodle upper unit bathroom.Details
revision to pa #201603222686 - add toilet & hand sink to garage storage space. add wall with door in entry. move door from garage to storage/entry. relocate washer/dryer to upper unit. chnage window configuration on front facade. remodle upper unit bathroom. | $10,000 |
| Oct 25, 2016 | Completed final sign-off Mar 2017 | 1219 Stanyan St | reconfigure (e) bathroom, replace plumbing fixtures and tile in (e) bathroom, (n) lighting and electrical in remodeled bathroom.Details
reconfigure (e) bathroom, replace plumbing fixtures and tile in (e) bathroom, (n) lighting and electrical in remodeled bathroom. | $13,000 |
| Sep 28, 2016 | Completed final sign-off Mar 2017 | 1219 Stanyan St | remodel e bathroom. replace plumbing fixtures, tub and tile in e bath. new lighting and elec in e bathDetails
remodel e bathroom. replace plumbing fixtures, tub and tile in e bath. new lighting and elec in e bath | $8,000 |
| Aug 26, 2016 | Completed final sign-off Feb 2020 | 139 Pfeiffer St | add upper 3rd floor and roof deck. interior kitchen & bath remodel on the 1st & 2nd floor. new steel frame at garage, new exterior siding & windows.Details
add upper 3rd floor and roof deck. interior kitchen & bath remodel on the 1st & 2nd floor. new steel frame at garage, new exterior siding & windows. | $350,000 |
| Aug 25, 2016 | Completed final sign-off Nov 2017 | 135 Castro St | reconfigure (e) kitchen, pantry and powder room. replace fixtures, vanity and tile in (e) bathroom. new lighting, elect & plumbing in kitchen, powder room and bathroomDetails
reconfigure (e) kitchen, pantry and powder room. replace fixtures, vanity and tile in (e) bathroom. new lighting, elect & plumbing in kitchen, powder room and bathroom | $50,000 |
| Apr 26, 2016 | Completed final sign-off May 2018 | 777 Faxon Av | convert 352 sq.ft. of (e) basment to bedroom, bathroom & laundry room. add windows in (n) downstairs bedroom, reconfigure window in (e) stair, reconfigure (e) kitchen, add (n) landing & stair to bedroom. no work visible from street.Details
convert 352 sq.ft. of (e) basment to bedroom, bathroom & laundry room. add windows in (n) downstairs bedroom, reconfigure window in (e) stair, reconfigure (e) kitchen, add (n) landing & stair to bedroom. no work visible from street. | $80,000 |
| Jul 29, 2015 | Never finaled issued Jul 2015, no final | 1171 Oak St | unit 2: remove interior wall between kitchen and office, remodel existing kitchen and baths, add exterior patior door and new rear deck. new lighting, elec work. rear deck less than 18" from natural grade. new ul listed direct vent gas fireplace.Details
unit 2: remove interior wall between kitchen and office, remodel existing kitchen and baths, add exterior patior door and new rear deck. new lighting, elec work. rear deck less than 18" from natural grade. new ul listed direct vent gas fireplace. | $200,000 |
| Jun 19, 2015 | Expired or cancelled expired Mar 2018 | 1861 Pine St | remodel (e) unit including demolition & construction. new outlet & light fixtures @ 1/f, convert (e) storage space to new living space with new bath, family & laundry. 2/f: remodel kitchen. 3/f: remodel bathroom.Details
remodel (e) unit including demolition & construction. new outlet & light fixtures @ 1/f, convert (e) storage space to new living space with new bath, family & laundry. 2/f: remodel kitchen. 3/f: remodel bathroom. | $10,000 |
| Feb 19, 2015 | Completed final sign-off Jan 2016 | 1310 Page St | remodel kitchen, bath powder room 2nd flDetails
remodel kitchen, bath powder room 2nd fl | $225,000 |
| Oct 10, 2014 | Completed final sign-off Feb 2015 | 2533 Folsom St | add half bath to existing storage shed and add door from garage to the storage shed. add new jacuzzi and fire pit in rear yard.no exterior work on storage structureDetails
add half bath to existing storage shed and add door from garage to the storage shed. add new jacuzzi and fire pit in rear yard.no exterior work on storage structure | $40,000 |
| Jun 2, 2014 | Completed final sign-off Sep 2014 | 1412 Mcallister St | interior remodel of kitchen & bathroom.Details
interior remodel of kitchen & bathroom. | $45,000 |
| Dec 10, 2013 | Completed final sign-off Jun 2014 | 311 Crescent Av | interior remodeling on 2nd floor. remodel extg kitechen bath and add new 1/2 bathroom on 2nd floor, remove kitchen walls for open floor plan.Details
interior remodeling on 2nd floor. remodel extg kitechen bath and add new 1/2 bathroom on 2nd floor, remove kitchen walls for open floor plan. | $40,000 |
| Nov 5, 2013 | Completed final sign-off Jun 2014 | 311 Crescent Av | interior remodel on ground floor. add connecting stairs to 2nd floor. foundation replacement. re-inforce ground floor walls with plywood. ground floor remodel (e) bathroom & add 2nd bathroom.Details
interior remodel on ground floor. add connecting stairs to 2nd floor. foundation replacement. re-inforce ground floor walls with plywood. ground floor remodel (e) bathroom & add 2nd bathroom. | $80,000 |
| Sep 27, 2013 | Completed final sign-off May 2014 | 30 Elsie St | project proposes addition of (n) living space within (e) unoccupied lower level. expand lower level under foot print of floor above. work includes addition of (n) internal stair, (n) bedroom, (n) bathroom and (n) living room.Details
project proposes addition of (n) living space within (e) unoccupied lower level. expand lower level under foot print of floor above. work includes addition of (n) internal stair, (n) bedroom, (n) bathroom and (n) living room. | $28,693 |