Back to kitchen remodel contractors
Mc Dermott Construction
- Based in
- San Bruno
- On San Francisco permits
- Apr 2008 to Nov 2017
- Last 24 months
- 0 permits filed
18 permits since 2000: 14 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 6 completed, 2 never finaled. Typically 0 days from filing to permit and 102 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 9, 2017 | Completed final sign-off Jan 2018 | 2423 Larkin St | remove (e) kitchen cabinets & counters, replace/install new cabinets/counters in same location.Details
remove (e) kitchen cabinets & counters, replace/install new cabinets/counters in same location. | $45,000 |
| Jan 21, 2016 | Completed final sign-off Mar 2016 | 1452 Bush St | unit #15: kitchen remodel,new wall design for bathroom and hallway; extension of ceiling soffit to match existing.Details
unit #15: kitchen remodel,new wall design for bathroom and hallway; extension of ceiling soffit to match existing. | $30,000 |
| Jul 24, 2015 | Completed final sign-off Mar 2016 | 248 Hazelwood Av | rev. to pa#201411192031 to add window at g/f master bedroom and add 2 fixed skylight at 2/f kitchen, u-factor less than 0.32.Details
rev. to pa#201411192031 to add window at g/f master bedroom and add 2 fixed skylight at 2/f kitchen, u-factor less than 0.32. | $3,000 |
| Dec 23, 2014 | Never finaled issued Dec 2014, no final | 342 Sanchez St | new kitchen layout due to brick chimney for furnace ventilation that caanot be removed as orig shownon drawings. revision to pa# 201411242401. install 1 larger skylight in place of 2 smaller ones.Details
new kitchen layout due to brick chimney for furnace ventilation that caanot be removed as orig shownon drawings. revision to pa# 201411242401. install 1 larger skylight in place of 2 smaller ones. | $60,000 |
| Nov 24, 2014 | Completed final sign-off Mar 2015 | 342 Sanchez St | interior tenant improvements, new kitchen, new bathroom, add new bathroom in guest bedroom, new plumbing and electrical in remodeled areas. demo as req for new improvement and upgrades.Details
interior tenant improvements, new kitchen, new bathroom, add new bathroom in guest bedroom, new plumbing and electrical in remodeled areas. demo as req for new improvement and upgrades. | $60,000 |
| Nov 19, 2014 | Never finaled issued Jan 2015, no final | 248 Hazelwood Av | alteration of ground floors storage to add master bedroom, master bath, bath. remodel extg 2/f kitchen and bath. replace extg foundation. new windows to be wood framed, new patio door to be woodframed.Details
alteration of ground floors storage to add master bedroom, master bath, bath. remodel extg 2/f kitchen and bath. replace extg foundation. new windows to be wood framed, new patio door to be woodframed. | $150,000 |
| Jun 7, 2013 | Completed final sign-off Jul 2013 | 1172 Greenwich St | remove (e) kitchen cabinets & install with new, install new counter top & kitchen faucet.Details
remove (e) kitchen cabinets & install with new, install new counter top & kitchen faucet. | $8,500 |
| Feb 16, 2010 | Completed final sign-off Nov 2010 | 422 Vallejo St | remodel of existing cabinet in kitchen and vanity and fixtures in bathroom and replace with new. install one new window and door in existing spaces at rear of home. install new tile and floor coverings to new remodel space. u factor .40 max. lighting to comply with cec 150 (k)Details
remodel of existing cabinet in kitchen and vanity and fixtures in bathroom and replace with new. install one new window and door in existing spaces at rear of home. install new tile and floor coverings to new remodel space. u factor .40 max. lighting to comply with cec 150 (k) | $18,000 |