Back to bathroom remodel contractors
Mc Dermott Construction
- Based in
- San Bruno
- On San Francisco permits
- Apr 2008 to Nov 2017
- Last 24 months
- 0 permits filed
18 permits since 2000: 14 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 7 completed, 1 never finaled. Typically 0 days from filing to permit and 114 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 21, 2016 | Completed final sign-off Mar 2016 | 1452 Bush St | unit #15: kitchen remodel,new wall design for bathroom and hallway; extension of ceiling soffit to match existing.Details
unit #15: kitchen remodel,new wall design for bathroom and hallway; extension of ceiling soffit to match existing. | $30,000 |
| Nov 24, 2014 | Completed final sign-off Mar 2015 | 342 Sanchez St | interior tenant improvements, new kitchen, new bathroom, add new bathroom in guest bedroom, new plumbing and electrical in remodeled areas. demo as req for new improvement and upgrades.Details
interior tenant improvements, new kitchen, new bathroom, add new bathroom in guest bedroom, new plumbing and electrical in remodeled areas. demo as req for new improvement and upgrades. | $60,000 |
| Nov 19, 2014 | Never finaled issued Jan 2015, no final | 248 Hazelwood Av | alteration of ground floors storage to add master bedroom, master bath, bath. remodel extg 2/f kitchen and bath. replace extg foundation. new windows to be wood framed, new patio door to be woodframed.Details
alteration of ground floors storage to add master bedroom, master bath, bath. remodel extg 2/f kitchen and bath. replace extg foundation. new windows to be wood framed, new patio door to be woodframed. | $150,000 |
| Jul 31, 2014 | Completed final sign-off Nov 2014 | 650 Delancey St | remove (e) bathroom vanitys, tile work, existing plumbing and electrical fixtures and replace with new. no walls moved, removed or added. all fixture locatons and layouts to remain unchanged. n/a maher ordinance 155-13Details
remove (e) bathroom vanitys, tile work, existing plumbing and electrical fixtures and replace with new. no walls moved, removed or added. all fixture locatons and layouts to remain unchanged. n/a maher ordinance 155-13 | $10,500 |
| Feb 7, 2014 | Completed final sign-off Mar 2014 | 334 Bowdoin St | remove (e) plywood apliances & fixtures. gut (e) bathroom to studs/install new sheetrock, tile & bathroom fixtures. new carpet install & paint touch up. provide/replace 2 small windows in bedroom closets.Details
remove (e) plywood apliances & fixtures. gut (e) bathroom to studs/install new sheetrock, tile & bathroom fixtures. new carpet install & paint touch up. provide/replace 2 small windows in bedroom closets. | $32,500 |
| Sep 19, 2012 | Completed final sign-off Mar 2013 | 422 Vallejo St | lower extg bathroom floor elev and remodel etxg space with new plmg elec. sheetrock and new plmb fixtures and tile work. install new window.Details
lower extg bathroom floor elev and remodel etxg space with new plmg elec. sheetrock and new plmb fixtures and tile work. install new window. | $25,000 |
| Feb 16, 2010 | Completed final sign-off Nov 2010 | 422 Vallejo St | remodel of existing cabinet in kitchen and vanity and fixtures in bathroom and replace with new. install one new window and door in existing spaces at rear of home. install new tile and floor coverings to new remodel space. u factor .40 max. lighting to comply with cec 150 (k)Details
remodel of existing cabinet in kitchen and vanity and fixtures in bathroom and replace with new. install one new window and door in existing spaces at rear of home. install new tile and floor coverings to new remodel space. u factor .40 max. lighting to comply with cec 150 (k) | $18,000 |
| Apr 2, 2008 | Completed final sign-off Jul 2008 | 2200 Pacific Av | work @ unit# 10d only. remodel of 2 bathrooms. replace fixtures tile & new paint. no structural work.Details
work @ unit# 10d only. remodel of 2 bathrooms. replace fixtures tile & new paint. no structural work. | $25,000 |